Loading...
HomeMy WebLinkAboutZA2019-069 - APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2019-045 TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A NEW SINGLE-FAMILY RESIDENCE LOCATED AT 119 SHORECLIFF ROADRESOLUTION NO. ZA2019-069 A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2019-045 TO DEMOLISH AN EXISTING SINGLE- FAMILY RESIDENCE AND CONSTRUCT A NEW SINGLE-FAMILY RESIDENCE LOCATED AT 119 SHORECLIFF ROAD (PA2019-172) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Brandon Architects, with respect to property located at 119 Shorecliff Road, and legally described as Lot 116, Tract 1116 requesting approval of a coastal development permit. 2. The applicant proposes to demolish an existing one-story single-family residence and construct a new two-story 6,055-square-foot, single-family residence with an attached 848- square-foot, four-car garage. 3. The subject property is located within the R-1-6,000 (Single-Unit Residential) Zoning District and the General Plan Land Use Element category is RS-D (Single-Unit Residential Detached). 4. The subject property is located within the coastal zone. The Coastal Land Use Plan category is RSD-A (Single Unit Residential Detached) (0.0 - 5.9 DU/AC) and the Coastal Zoning District is R-1-6,000 (Single-Unit Residential). 5. A public hearing was held on October 24, 2019 in the Corona del Mar Conference Room (Bay E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and purpose of the hearing was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This Project is categorically exempt from the California Environmental Quality Act (“CEQA”) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment. 2. Class 3 includes the construction of a single-family residence in a residential zone. The proposed project includes the demolition of an existing single-family residence and construction of a new 6,055-square-foot, single-family residence with an attached 848- square-foot, four-car garage. 3. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a Zoning Administrator Resolution No. ZA2019-069 Page 2 of 7 state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Coastal Development Permits) of the Newport Beach Municipal Code, the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed structure conforms to all applicable development standards including, but not limited to, site coverage limitation, setbacks, height, and parking: a. The maximum allowable site coverage is 60% of the buildable area of the lot or 7,756 square-feet. The proposed site coverage is 36.7% or 4,752 square-feet. b. The proposed development will provide the required setbacks, which are 20 feet along the front property line, 6 feet along the side property lines, and 6 feet along the rear property line. c. The highest guardrail or flat roof is no more than 24 feet, measured from established grade at every point as required by Zoning Code Section 20.30.050(B)(3) and the highest ridge is no more than 29 feet from established grade, which complies with the maximum height limitation. d. The project includes enclosed garage parking for four vehicles, which exceeds the minimum three-space parking requirement for single-family residences having more than 4,000 square feet of livable floor area. 2. The proposed design, bulk, and scale of the development is consistent with the existing neighborhood’s pattern of development and expected future development consistent with applicable development standards as the neighborhood is predominantly developed with one- and two-story, single-family residences. 3. The project is located on a relatively level building pad elevation of approximately 70 feet (NAVD88) on a lot that does not have coastal frontage. A Geotechnical Investigation, dated August 12, 2019, was prepared by Coast Geotechnical, Inc., for the project and found that the proposed grading and construction will not adversely affect geologic stability of the project site or adjoining properties or structures, provided construction is performed in accordance with report recommendations. The site is not mapped as being susceptible to earthquake-induced liquefaction or landslide. 4. The project will be required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of a building Zoning Administrator Resolution No. ZA2019-069 Page 3 of 7 permit. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. 5. As conditioned, the property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c) prior to the issuance of building permits for construction. 6. The project design addresses water quality during construction with a construction erosion control plan. All new construction resulting from the project will tie into an existing post- construction drainage system that includes features designed to retain dry weather and minor rain event runoff on-site. Any water not retained on-site is directed to the City’s storm drain system. 7. New landscaping will be verified for compliance with NBMC Section 21.30.075 (Landscaping). A condition of approval is included that requires drought-tolerant and prohibits invasive species. Prior to issuance of the building permits, the final landscape plans will be reviewed to verify invasive species are not planted. 8. The property is not located near coastal view roads and is not located near any identified public viewpoints; therefore, the project will not negatively impact public coastal views. Finding: B. Conforms to the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Facts in Support of Finding: 1. The project site is located between the nearest public road and the sea or shoreline; however, the project will not affect the public’s ability to gain access to use and/or view the coast and nearby recreational facilities. The proposed residential development neither provides nor inhibits public coastal access. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project includes the replacement of an existing single-family residence with a new single-family residence. The project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. 2. The project is designed and sited to not block or impede existing public access opportunities and occurs within the confines of private property. Existing coastal access conditions will not be affected by the project, including a publicly accessible walkway located immediately behind the subject property, leading to a coastal viewing platform located below and west of the property. 3. The project site is not located adjacent to a coastal view road or coastal viewpoint identified by Local Coastal Program maps. The project site may be located with in the Zoning Administrator Resolution No. ZA2019-069 Page 4 of 7 viewshed of distant public viewing areas; however, the project will replace an existing single-family residence with a new single-family residence that complies with all applicable Local Coastal Program (LCP) development standards. It will also main tain a building envelope consistent with the existing and anticipated neighborhood pattern of development. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to publ ic views. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby finds this Project is categorically exempt from the California Environmental Quality Act (“CEQA”) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment. 2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2019-045, subject to the conditions set forth in Exhibit “A,” which is attached hereto and incorporated by reference. 3. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 24th DAY OF OCTOBER, 2019. ______________________________ James Campbell, Zoning Administrator Zoning Administrator Resolution No. ZA2019-069 Page 5 of 7 EXHIBIT “A” CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 3. Coastal Development Permit No. CD2019-045 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 4. This approval does not authorize any new or existing improvements (including landscaping) on State tidelands, public beaches, or the public right -of-way. 5. Prior to the issuance of a building permit, the property owner shall sign a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmles s City, its City Council, its boards and commissions, officials, officers, employees and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgements, fines, penalties, liabilities, costs a nd expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of development. The letter shall be scan ned into the plan set prior to building permit issuance. 6. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 7. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Coastal Development Permit. 8. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined should they determine that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 9. Prior to the issuance of a building permit, a copy of the Resolution, including conditions of approval Exhibit “A,” shall be incorporated into the Building Division and field sets of plans. Zoning Administrator Resolution No. ZA2019-069 Page 6 of 7 10. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by either the current business owner, property owner or the leasing agent. 11. No demolition or construction materials, equipment debris or waste shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain, or result in impacts to environmentally sensitive habitat areas, streams, wetland or their buffers. 12. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 13. The applicant is responsible for compliance with the Migratory Bird Treaty Act. In compliance with the (MBTA), grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, out side of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of Native Birds pursuant to MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 14. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented prior to and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 15. Prior to issuance of a building permit, the applicant shall submit to the Planning Division an additional copy of the approved architectural plans for inclusion in the coastal development permit file. The plans shall be identical to those approved by all City departments for building permit issuance. The approved copy shall include architectural sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the elements approved by this coastal development permit. 16. Prior to issuance of a building permit, the applicant shall submit a final construction erosion control plan. The plan shall be subject to review and approval by the Building Division. 17. Prior to the issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought-tolerant plantings, non-invasive Zoning Administrator Resolution No. ZA2019-069 Page 7 of 7 plant species and water-efficient irrigation design. The plans shall be approved by the Planning Division. 18. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 19. Prior to issuance of a building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 20. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far as far away from storm drain systems or receiving waters as possible. 21. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 22. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of the Bentley Residence including, but not limited to Coastal Development Permit No. CD2019-045 (PA2019-172). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition.