Loading...
HomeMy WebLinkAboutX2017-3861 - Misc (3)33D3 Jia L/00 X2007.3860 Appendix E LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that (1) 1 am a professional appropriately licensed in the State of California to provide professional landscape design services. (2) The landscape project for the property located at -33o3 (provide street fjry 0tn address or parcel number(s)) was installed by me or under my supervision. (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Newport Beach Water Efficient Landscape Ordinance (Municipal Code Section 14.17) and the City of Newport Beach Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for the efficient use of water in the landscape. (4) The following elements are attached hereto: a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule; c. Irrigation audit report; and d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. Yes —No b. Sprinklers comply with ASABEtICC 802-2014 Landscape Irrigation Sprinkler & Emitter Standard. Yes _ No (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the City of Newport Beach Design Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance. 33 DAV/D x. LAAkONS /2. /o. /1 Print Name Date � . ALA ¢ZZIi gnatu License Number /a39S" JOrrArA/0N 8a✓D., 6W4VZV- airY, CA. 10232 - Address .310 . "f. L6 4o op Telephone Landscape Design Professional's Stamp 44.414s¢./rmA-d. conn E-mail Address ioR* ice: 11 Q 80chav njuraka Landscaping lnco P.O. Box 4017 - Cerritos, CA 90703 = Tel: 562.921.3210 - Fax: 562.921.3670 St. Lic. 432461 LIDO WATERING SCHEDULE PROGRAM A PALM TREE AND TREE VALVES (M,W,F) -20 MINUTES -2X PER DAY @ 6AM AND 10AM STATION - 2 STATION - 9 STATION - 16 STATION - 14 STATION - 20 PROGRAM B TREE VALVES (M,TH) - 20 MIN AX PER DAY @ 8AM STATION - 6 STATION - 7 STATION - 13 STATION - 18 PROGRAM C SHRUBS AND GROUND COVER (W) - 30 MIN -1X PER DAY AT 8PM STATION -1 STATION - 3 STATION - 4 STATION - 5 STATION - 8 STATION - 10 STATION -11 STATION - 12 STATION - 15 STATION - 17 STATION - 19 STATION - 21 ENVIRONMENTAL DESIGN LANDSCAPE IRRIGATION AUDIT REPORT This agreement is made as of December 10, 2019 between the Client and Consultant for the services provided herein. Water Audit review date 12/11/19 — punch list. / Water audit completed 12/11/19. Project Lido Villas Tr 17555 PLANS PREPARED BY Landscape Architect LMR 1335 Jefferson Blvd. Culver City, CA 90232 David Kenneth Larkins 310.839.6600 CLIENT Developer Landsea Homes 7525 Irvine Center Drive Irvine, CA 92618 Thuan Vo 949.272.9836 CONSULTANT Summers Murphy & Partners (audit) 34197 Pacific Coast Hwy. Ste. 200 Dana Point, CA 92629 Michael McMillen 714.394.6126 mmcmillen@smpinc.net Thank you for the opportunity to perform a landscape irrigation audit. All of the zones / hydrozones on the irrigation systems were evaluated with a visual inspection. As per your request, we evaluated the irrigation systems in accordance with the California Model Water Efficient Landscape Ordinance (MWELO). SUMMARY The project is located at Tract 17555 Newport Beach. This audit was performed on the new overall site irrigation systems within the limits of construction. The irrigation systems are new systems utilizing potable water. At the time of the audit the temperature was around 51 degrees Fahrenheit at approximately 7am with negligible wind speed. 34197 Pacific Coast Highway, Suite zoo, Dana Point. CA 92629 • 949 4431445 • infora)smpinc.net • www.smpinc.net ENVIRONMENTAL DESIGN IRRIGATION PLANS: After evaluating each hydrozone and all of the system layout; components and functionality meet all the requirements of the Irrigation Plans. Each hydrozone is noted on the report with notes and zone details. MWELO: The California Model Water Efficient Landscape Ordinance has been adopted by the City of Newport Beach as the standard for new construction and irrigation installations based on AB -1881. UNIFORMITY: Since the dripline is subterranean and the planting material is already installed and would be damaged if the dripline was unearthed, a drip catch can test was not performed. In lieu of the catch can test, the standard 90% efficiency for pressure compensating drip & low -flow irrigation per the Irrigation Association's Landscape Irrigation Auditor, 3rd edition book was used for the report. Shrub ZONES / STATION 1-21 • Irrigated Area: Perimeter landscape and interior planters • Plant Material: Shrubs - Low water • Microclimate: Full Sun • Soil Category: Silty Clay Loam • Root Depth: Approximately 2-10" • Slope: Overall site 0 • Compaction: No • Runoff: No runoff observed • Standing Water: No • Hydrozone Separation: Yes • Mulch in Beds: Yes / DG fines • Pressure Regulation: Buckner Switch- Master Valve w/ pressure regulation feature / Flow Sensor • Valve: Rainbird PEB-PRS-D series/ Rainbird XCZ-100-PRB-COM / 200 mesh screen 140 PSI Pressure Regulator • Emitter Type: Rainbird XFS-09-12 / (.9 gph @ 12" o.c row spacing @ 12" o.c.) • Flow: 13.3 GPM • Distribution Uniformity: .81 -.90 • Precipitation Rate: 0.48 Notes: Contractor has provided owner with controller charts and Record Drawings. Zone Audit Conclusion: Pass The irrigation systems were evaluated on Wednesday, December 11, 2019. Based on the Irrigation Association Audit rules/guidelines and MWELO the irrigation systems is within compliance. 34197 Pacific Coast Highway, Suite 2OO. Dana Point. CA 92629 • 949.4431446 • nfo!asmpinc.net • www,smpinc.net SM ENVIRONMEN FAL DESIGN The irrigation systems were evaluated on Wednesday, December 11, 2014. Based on the Irrigation Association Audit rules/guidelines and MWELO the irrigation systems is within compliance. All recommended adjustments were corrected on-site to reach maximum efficiency. The type of planting material meets the required crop coefficient from the landscape plans and state requirements. The pressure at the dripline is within the manufacturer recommended range of 20 to 40 PSI. It Is recommended that the client implement a responsible watering schedule that follows local restrictions and use of an annualater budget. Regular landscape maintenance on a weekly or bi-weekly basis is also recommended. Auarterly irrigation inspection by a certified irrigation technician will keep the Irrigation system at peak perforian e. (`\ A 1 i W Certified Irrigation Auditor #014256 Summers Murphy & Partners U�e > CUA 31I : , i _,nc '. a d o (in .i .wo, >or r)., Po,nl N 413 t yr • inYu p; n .1>,; • YY%V R smpfnc net