HomeMy WebLinkAboutX2019-0185 - MiscJob Address:
X2®101 - 0
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.gov 1 (949) 644-3200
COMMERCIAL
MECHANICAL, ELECTRICAL, AND PLUMBING
QUESTIONNAIRE FOR PLAN REVIEW WAIVER
The above -proposed project may require electrical, mechanical, and or plumbing plan checking.
The following questions are regarding the new proposed work and the applicable areas it
serves. If the answer to a question below is "YES," a plan check is required for the Electrical,
Mechanical, and/or Plumbing portion of work. To expedite the permit process, please submit
this questionnaire along with an application and three (3) sets of plans.
NOTE: The Chief Building Official may make exceptions for minor work, additions, and
alterations.
COMMERCIAL TENANT IMPROVEMENTS ONLY
GENERAL NO YES
1. Is the area of work more than 2,500 square feet?
;3�
❑
2. Is the area of work for OTHER THAN an occupancy classification and
❑
(use) of B (office), or M (retail)?
3. Does the area of work require a concurrent review from any other City
❑
department or outside agency (i.e. Health, Fire, or Public Works)?
PLUMBING
NO
YES
4. Does the work include more than 9 plumbing fixtures?
�f
❑
5. Is the potable water piping 2 -inches or greater?
p'
❑
6. Does the work involve the installation of any pumps?
❑
7. Does the work include a gas system other than typical low pressure
E3system?
8. Are there any installations, alterations, or relocations of a grease
interceptor and or clarifier? L3
9. Is the plumbing work above the ground floor in a high-rise building? A ❑
MECHANICAL
10. Does the work include any refrigeration equipment?
NO
YES
'J:( ❑
11. Does the work include new rooftop equipment weighing a total of 250 lbs. ❑
or more?
12. Does the work include altering the existing smoke detection system in the �' ❑
air plenum? '
13. Does the work include duct work with fire and or smoke dampers or duct ❑
extensions over 25 feet?
14. Are there any new installations containing a commercial type kitchen ❑
hood, Types I or II?
ELECTRICAL
NO
YES
15. Does the work include a new service, sub panel, or transformer rated
❑
over 400 amps?
16. Does the work involve more than 5 branch circuits?
car
❑
17. Indoor lighting: Any new or replacement lighting over 50% of the existing
�'
❑
lighting in the area?
18. Outdoor lighting: Any new or replacement lighting over 50% of the ❑
existing luminaries in a permitted area?
19. Does the work involve any high voltage installations (over 600 volts)? ❑
ITEMS NOT ELIGIBLE FOR M.E.P. PLAN REVIEW WAIVER
PLUMBING
• New restroom facilities
• Septic tanks, cesspools
• Chemical waste
• Combination waste & vent
MECHANICAL
• Boilers
• Spray booth
• Fire and/or smoke damper
• Medical gas system
• Medium pressure gas
piping
ELECTRICAL
• OSHPD 3 uses
• Dock or harbor power
• Photovoltaic or standby
generator
• Fuel cells
I certify that the above information is true and correct.
Signature:(_ Date: d/ %'7 7e16
Print Name:S
Phone #:
Forms\COMMERCIAL MechanicalElectricalPlumbingPlanCheckQuestionnaire
2