HomeMy WebLinkAboutPV2019-144 - MiscCITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportboachea.gov 1 (949) 644-3200
Eligibility Checklist for Expedited
Solar Photovoltaic Permitting for
One- and Two -Family Dwellings
GENERAL REQUIREMENTS
A.
No more than four photovoltaic module strings are connected to each Maximum Power
/
A.
System size is 10 kW AC CEC rating or less
Q'Y
❑ N
B.
The solar array is roof -mounted on one- or two-family dwelling or accessory structure
uY
❑ N
C.
The solar panel/module arrays will not exceed the maximum legal building height
ZX,
❑ N
D.
Solar system is utility interactive and without battery storage
g YY
6
E3
E.
Permit application is completed and attached
120/220 Vac with a bus bar rating of 225 A or less%
❑ N
ELECTRICAL REQUIREMENTS
The PV system is connected to the load side of the utility distribution equipment
@ Y ❑ N
�Y
A.
No more than four photovoltaic module strings are connected to each Maximum Power
/
Point Tracking (MPPT) input where source circuit fusing is included in the inverter
17 Y ❑ N
1) No more than two strings per MPPT input where source circuit fusing is not included
❑ N
2) Fuses (if needed) are rated to the series fuse rating of the PV module
fi Y ❑ N
3) No more than one non inverter -integrated DC combiner is utilized per inverter
f3 Y ❑ N
B.
For central inverter systems: No more than two inverters are utilized
Y ❑ N
C.
The PV system is interconnected to a single-phase AC service panel of nominal
120/220 Vac with a bus bar rating of 225 A or less%
[IN
D.
The PV system is connected to the load side of the utility distribution equipment
@ Y ❑ N
�Y
E.
A Solar PV Standard Plan and supporting documentation is completed and attached
❑ N
STRUCTURAL REQUIREMENTS
A.
A completed Structural Criteria and supporting documentation is attached (if required)
0 Y ❑ N
FIRE SAFETY REQUIREMENTS
//
A.
Clear access pathways provided
@' ❑ N
B.
Fire classification solar system is providedO
Y/ ❑ N
C.
All required markings and labels are provided
9/Y ❑ N
D.
A diagram of the roof layout of all panels, modules, clear access pathways and
approximate locations of electrical disconnecting means and roof access points
is completed and attached
EYY ❑ N
Notes:
1. These criteria are intended for expedited solar permitting process.
2. If any items are checked NO, revise design to fit within Eligibility Checklist, otherwise permit application
may go through standard process.