Loading...
HomeMy WebLinkAboutZA2020-002 - APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2019-058 TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A NEW SINGLE-FAMILY RESIDENCE LOCATED AT 732 VIA LIDO NORD RESOLUTION NO. ZA2020-002 A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2019-058 TO DEMOLISH AN EXISTING SINGLE- FAMILY RESIDENCE AND CONSTRUCT A NEW SINGLE-FAMILY RESIDENCE LOCATED AT 732 VIA LIDO NORD (PA2019-230) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Cynthia Childs, Architect, with respect to property located at 732 Via Lido Nord, and legally described as Lot 44 and southeasterly one-half of Lot 45, Tract 907 requesting approval of a coastal development permit. 2. The applicant proposes to demolish an existing single-family residence and construct a new 4,440-square-foot, single-family residence with an attached 789-square-foot, three-car garage. 3. The subject property is located within the R-1 (Single-Unit Residential) Zoning District and the General Plan Land Use Element category is RS-D (Single-Unit Residential Detached). 4. The subject property is located within the coastal zone. The Coastal Land Use Plan category is RSD-C (Single Unit Residential Detached) (10.0 - 19.9 DU/AC) and the Coastal Zoning District is R1 (Single-Unit Residential). 5. A public hearing was held on January 16, 2020, in the Corona del Mar Conference Room (Bay E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and purpose of the hearing was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This Project is categorically exempt from the California Environmental Quality Act (“CEQA”) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment. 2. Class 3 includes the construction of a single-family residence in a residential zone. The proposed project includes the demolition of an existing single-family residence and construction of a new 4,440-square-foot, single-family residence with an attached 789- square-foot, three-car garage. 3. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effec t on the environment due to unusual circumstances, does not damage scenic resources within a Zoning Administrator Resolution No. ZA2020-002 Page 2 of 9 state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Coastal Development Permits) of the Newport Beach Municipal Code, the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed structure conforms to all applicable development standards including, but not limited to, floor area limitation, setbacks, height, and parking : a. The maximum floor area limitation is 6,764 square feet and the proposed gross floor area is 5,229 square feet. b. The proposed development will provide the required setbacks, which are 4 feet along the front property line abutting the street, 10 feet along the bayfront property line, and 4 feet along the side property lines. c. The highest guardrail or flat roof is no more than 24 feet, measured from established grade at every point as required by Zoning Code Section 20.30.050(B)(3) and the highest ridge is no more than 29 feet from established grade, which complies with the maximum height limitation. d. The project includes enclosed garage parking for three vehicles, which complies with the minimum three-space parking requirement for single-family residences having more than 4,000 square feet of livable floor area. 2. The proposed design, bulk, and scale of the development is consistent with the existing neighborhood’s pattern of development and expected future development consistent with applicable development standards as the neighborhood is predominantly developed with two-story, single-family residences. 3. A Coastal Hazards Analysis Report was prepared for the project by PMA Consulting, Inc., dated October 18, 2019. The current maximum bay water elevation is 7.7 feet North American Vertical Datum of 1988 (NAVD 88). According to the report, the estimated sea level rise at the site is between 2.8 and 4.95 feet over the next 75 years utilizing different probabilistic scenarios, accounting for the bay water level rising to between 10.5 to 12.65 feet NAVD 88. The Newport Beach City Council has approved the use of the high estimate of the “low risk aversion” scenario, which is 3.2 feet by the year 2100, or 2.9 feet by 2094. Therefore, the sea level is estimated to likely reach approximately 10.6 feet NAVD 88 over the next 75 years (i.e. the life of the structure).The report also identifies that there is a 0.5 percent chance (“medium-high risk aversion” scenario) that sea level rise (SLR) would be Zoning Administrator Resolution No. ZA2020-002 Page 3 of 9 greater than 2.9 feet around the year 2070 and the bay water level could be as high as 13.7 feet NAVD 88 by the year 2094. If future SLR is greater than the likely estimate of the “low risk aversion” scenario by 2094 (10.6 feet NAVD 88), then the bulkhead can be raised without further bayward encroachment. Future raising of the bulkhead height would require a separate local coastal development permit (CDP). 4. The project site is protected by an existing bulkhead that will be repaired and maintained at its current height of 11.54 feet NAVD 88, which can be raised to protect the property if needed in the future. The finished floor elevation of the first floor of the proposed living area is 12.98 feet NAVD 88, which exceeds the minimum 9.0-foot NAVD 88 elevation standard for new structures and exceeds the minimum requirements for sea level rise (10.6 feet NAVD 88) for the anticipated 75-year life of the structure. 5. Pursuant to Newport Beach Municipal Code (NBMC) Section 21.30.030(C)(3)(i)(iv), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c). Both requirements are included as conditions of approval that will need to be satisfied prior to the issuance of building permits for construction. 6. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and the CBC prior to building permit issuance. 7. Pursuant to Municipal Code Section 21.35.050 (Water Quality and Hydrology Plan), due to the proximity of the development to the shoreline and the development containing more than 75 percent of impervious surface area, a Water Quality and Hydrology Plan (WQHP) is required. A preliminary WQHP has been prepared for the project by Forkert Engineering & Surveying, Inc., dated November 1, 2019. The WQHP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, use of a Low Impact Development (LID) approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. 8. The project design addresses water quality with a Construction Pollution Prevention Plan (CPPP) that includes temporary best management practices (BMPs) to be implemented during construction to minimize erosion and sedimentation, and to minimize pollution of runoff derived by construction chemicals and materials. No water quality impacts to coastal waters are anticipated based upon the location and elevation of the property. 9. New landscaping will be verified for compliance with NBMC Section 21.30.075 (Landscaping). A condition of approval is included that requires drought-tolerant and Zoning Administrator Resolution No. ZA2020-002 Page 4 of 9 prohibits invasive species. Prior to issuance of the building permits, the final landscape plans will be reviewed to verify invasive species are not planted. 10. The property is not located near coastal view roads and is not located near any identified public viewpoints; therefore, the project will not negatively impact public coastal views. Finding: B. Conforms to the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Facts in Support of Finding: 1. The project site is located between the nearest public road and the sea or shoreline; however, the project will not affect the public’s ability to gain access to use and/or view the coast and nearby recreational facilities. The proposed residential development neither provides nor inhibits public coastal access. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project includes the replacement of an existing single-family residence with a new single-family residence. The project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. 2. The project is designed and sited so as not to block or impede existing public access opportunities and occurs within the confines of private property. Existing coastal access conditions will not be affected by the proposed development. Coastal access is currently provided and will continue to be provided by street ends throughout the neighborhood with access to the beach and water. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby finds this Project is categorically exempt from the California Environmental Quality Act (“CEQA”) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment. 2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2019-058, subject to the conditions set forth in Exhibit “A,” which is attached hereto and incorporated by reference. 3. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Zoning Administrator Resolution No. ZA2020-002 Page 5 of 9 Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 16th DAY OF JANUARY, 2020. ______________________________ James Campbell, Zoning Administrator Zoning Administrator Resolution No. ZA2020-002 Page 6 of 9 EXHIBIT “A” CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 3. Coastal Development Permit No. CD2019-058 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 4. This approval does not authorize any ne w or existing improvements (including landscaping) on State tidelands, public beaches, or the public right -of-way. 5. Prior to the issuance of building permit, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices to address the threat of damage or destruction from waves, erosion, storm conditions, landslides, seismic activity, bluff retreat, sea level rise, or other natural hazards that may affect the property, or development of the property, today or in the future. The agreement shall be binding against the property owners and successors and assigns. 6. Prior to the issuance of a building permit, the property owner shall sign a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgements, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of development. The letter shall be scanned into the plan set prior to building permit issuance. 7. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 8. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Coastal Development Permit. Zoning Administrator Resolution No. ZA2020-002 Page 7 of 9 9. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined should they determine that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 10. Prior to the issuance of a building permit, a copy of the Resolution, including conditions of approval Exhibit “A,” shall be incorporated into the Building Division and field sets of plans. 11. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by either the current business owner, property owner or the leasing agent. 12. No demolition or construction materials, equipment debris or waste shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain, or result in impacts to environmentally sensitive habitat areas, streams, wetland or their buffers. 13. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 14. This Coastal Development Permit does not authorize any development seaward of the private property. 15. Construction staging, storage and/or access is not allowed to occur on or from the adjacent sandy beach. 16. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of Native Birds pursuant to MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. Zoning Administrator Resolution No. ZA2020-002 Page 8 of 9 17. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented prior to and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 18. Prior to the issuance of building permits, the applicant shall submit a final Construction Pollution Prevention Plan (CPPP). The plan shall be subject to the review and approval by the Building Division. 19. Prior to issuance of building permits, the final WQHP/WQMP shall be reviewed and approved by the Building Division. Implementation shall be in compliance with the approved CPPP and WQHP/WQMP and any changes could require separate review and approval by the Building Division. 20. Prior to the issuance of building permits, the applicant shall submit a final drainage and grading plan. The plan shall be subject to the review and approval by the Building Division. 21. Prior to issuance of a building permit, the applicant shall submit to the Planning Division an additional copy of the approved architectural plans for inclusion in the coastal development permit file. The plans shall be identical to those approved by all City departments for building permit issuance. The approved copy shall include architectural sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the elements approved by this coastal development permit. 22. Prior to the issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought-tolerant plantings, non-invasive plant species and water-efficient irrigation design. The plans shall be approved by the Planning Division. 23. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 24. Prior to issuance of a building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 25. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far as far away from storm drain systems or receiving waters as possible . 26. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. Zoning Administrator Resolution No. ZA2020-002 Page 9 of 9 27. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of the Moore Residence including, but not limited to Coastal Development Permit No. CD2019-058 (PA2019-230). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition.