HomeMy WebLinkAbout10 - Underground Utility Assessment District No. 117 — NOC for C-7337-1Q �EwPpRT CITY OF O � z NEWPORT BEACH <,FORN'P City Council Staff Report May 12, 2020 Agenda Item No. 10 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Michael J. Sinacori, Assistant City Engineer, msinacori@newportbeachca.gov PHONE: 949-644-3342 TITLE: Underground Utility Assessment District No. 117 — Notice of Completion for Contract No. 7337-1 ABSTRACT: On June 26, 2018, City Council awarded Contract No. 7337-1 for the Underground Utility Assessment District No. 117 project to Asplundh Construction Corp. The work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project. On June 26, 2018, the City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Class 2 Section 15302(d); b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of Civil Code; and c) Release Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: Funds for this construction contract were included within the approved Capital Improvement Program budget and were expended from the following accounts: Account Description Account Number Amount AD 117 Construction SCE 65802-941001 $ 1,581,286.70 AD 117 Construction AT&T 65802-941002 $ 460,170.80 AD 117 Construction Cable 65802-941029 $ 126,417.50 AD 117 Construction Contingency 65802-941004 $ 536,576.48 Total: $ 2,704,451.48 10-1 Underground Utility Assessment District No. 117 — Notice of Completion for Contract No. 7337-1 May 12, 2020 Page 2 DISCUSSION: Underground Utility Assessment District No. 117 (AD 117) is the first City managed and constructed utility undergrounding construction project that undergrounded overhead power, telephone and cable facilities. AD 117 is the area bounded by Bayside Drive, Avocado Avenue, Coast Highway and Carnation Avenue and includes 268 properties within district boundaries. The undergrounding construction work for AD 117 included traffic control, water pollution control, trenching, the construction of vaults, vents, pull boxes, handholes, installing conduit with poly -pull ropes and associated items necessary such as backfilling, pavement restoration, resurfacing and replacement of existing concrete improvements for the conversion of existing overhead electrical power, telephone, and cable television services to underground locations as required by the contract. The project was complex and proved to be challenging due to issues with groundwater, broken sewer mains and laterals that needed repair, obstructions with abandoned gas and water mains, and existing concrete encasements in alleys where conduits were to be constructed. There were also plan changes to the SCE design that required more work and additional conduit that had to be constructed for Time Warner Cable. Seventy-seven change orders were approved for the abovementioned work, bringing project costs to 24.8 percent above the original contract award amount. In anticipation of this first ever undergrounding effort managed by the City, a Contingency Allowance of 15% was approved at the time of award. City Manager approval was obtained per Council policy to increase that to the final 24.8% contingency allowance. Overall Contract Cost/Time Summary Awarded Final Cost at Contingency Actual % Due to % Due to Contract Amount Completion Allowance Contract Directed Unforeseen Change Change Change $2,167,875 $2,704,451.48 15% or less +24.8% 0% 24.8% Allowed Contract Time + 220 Actual Time 0 Approved Extensions (days) = Under (-) or Over (+) Contract No. 7337-1, Underground Utility Assessment District No. 117, has been completed to the satisfaction of the Public Works Department. The final negotiated contract amount is $2,704,451.48. A summary of the construction cost is as follows: Original bid amount: Actual Cost of Bid Items Constructed: Total Change Orders: Final Contract Cost: $2,167,875.00 $2,167,875.00 $536,576.48 $2,704,451.48 10-2 Underground Utility Assessment District No. 117 — Notice of Completion for Contract No. 7337-1 May 12, 2020 Page 3 A summary of the project schedule is as follows: Estimated Start of Construction per Annual Baseline Schedule October 16, 2017 Actual Start of Construction Per Notice to Proceed July 9, 2018 Extended Contract Completion Date Inclusive of Extra Work June 14, 2019 Actual Substantial Construction Completion Date June 7, 2019 Public Works staff directed the contractor to delay the start of work until Summer 2018 in order to minimize traffic disruptions related to the Christmas holiday and other year-end events plus wait until school's summer session to remove traffic impacts to school drop- off and pick-up times. The start delay, coupled with utility challenges during construction, extended the contract completion date to June 14, 2019. Post construction work items and change order negotiations with the contractor contributed to the delay for the closeout of this contract. To date, all but one of the SCE connections to the properties have been completed. AT&T and Time Warner will be finalizing their connections in the next couple months and poles should be removed by end of Summer, as anticipated. ENVIRONMENTAL REVIEW: On June 26, 2018, City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302(d) Class 2 (conversion of overhead electrical utility distribution lines where the surface is restored to the condition existing prior to the undergrounding) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it will not have an adverse effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 10-3 1231 si'" pais �i 9K J Jib 731 1 06' T[9 7F2 lay, 709 red ' 1 ed sQF 70. 112 766 7�6 . Tod UNDERGROUND UTILITY ASSESSMENT DISTRICT NO. 117 LOCATION MAP 4 �J J 0, �a rn W 7 w Q C 0 xa d z LLI U) a U" z� �Co Co d c+7 m I w z 4 SAYSIDE DRIVE Attachment A CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-7337-1 1 5/12/20 10-4