HomeMy WebLinkAbout07 - Amendment to M/RSA for Sewer Manhole Lining ServicesQ �EwPpRT
CITY OF
O �
z NEWPORT BEACH
<,FORN'P City Council Staff Report
June 23, 2020
Agenda Item No. 7
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: Mark Vukojevic, Utilities Director - 949-644-3011,
mvukojevic@newportbeachca.gov
PREPARED BY: Joshua Rosenbaum, Senior Management Analyst,
jrosenbaum@newportbeachca.gov
PHONE: 949-644-3011
TITLE: Amendment No. One to Maintenance and Repairs Services
Agreement with Zebron Contracting, Inc. for Sewer Manhole Lining
Services
ABSTRACT:
The City utilizes a contractor to provide manhole lining services to rehabilitate sewer
manholes throughout the City each year. The existing contract with Zebron Contracting,
Inc., for as -needed sewer manhole lining services expires August 1, 2020. The proposed
amendment to the Agreement extends the contract term for two additional years and
increases the contract compensation amount by $150,000.
RECOMMENDATION:
a) Determine this action is exempt from the California Environmental Quality Act (CEQA)
pursuant to Sections 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines because
this action will not result in a physical change to the environment, directly or indirectly;
and
b) Approve Amendment No. One to the Maintenance/Repairs Services Agreement with
Zebron Contracting, Inc. for as -needed sewer manhole lining services, which extends
the contract term for two additional years and increases the contract compensation by
$150,000, and authorize the Mayor and City Clerk to execute the Agreement.
FUNDING REQUIREMENTS:
The Fiscal Year 2020-21 budget includes sufficient funding for this amended Agreement.
The contract will be expensed to the Wastewater/Sewer Fund in the Utilities Department,
including Sewer Manhole Lining budget account 7119061-851050 and Maintenance and
Repair budget account 7119061-851037.
7-1
Amendment No. One to Maintenance and Repairs Services Agreement with Zebron
Contracting, Inc. for Sewer Manhole Lining Services
June 23, 2020
Page 2
DISCUSSION:
The City wastewater collection system is made up of approximately 200 miles of mainline
pipes, 5 miles of force mains, 5,000 manholes and cleanouts, and 25,000 sewer laterals
(the pipe from the property line to the City sewer main).
Due to the unforgiving environment, concrete sewer manholes deteriorate over time.
Rather than replace the entire manhole, which would involve street closures, sewer
diversions, and customer outages, the City rehabilitates or lines the manhole. The
process includes cleaning and installing a polyurethane lining on the inside of the
manhole. This blocks the harsh environment from further damaging the concrete structure
and extends the life of the manhole for many years. The process is quicker, more cost
effective than full replacement, and less disruptive to the community and roadway traffic.
Over the past two fiscal years, the Utilities Department, through its contract with Zebron,
has installed over 500 linear feet of sewer manhole lining of various manhole depths. The
current contract with Zebron Contracting, Inc., expires August 1, 2020. Staff recommends
approval of Amendment No. One, which extends the current contract for two additional
years through August 1, 2022 and increases the not -to -exceed amount by $150,000 for
a total not to exceed amount of $400,000.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this action is not subject to the California
Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not
result in a direct or reasonably foreseeable indirect physical change in the environment)
and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no
potential for resulting in physical change to the environment, directly or indirectly.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENT:
Attachment A — Amendment No. One to On -Call Maintenance and Repair Services
Agreement with Zebron Contracting, Inc.
7-2
ATTACHMENT A
AMENDMENT NO. ONE TO
ON-CALL MAINTENANCE/REPAIR SERVICES AGREEMENT
WITH ZEBRON CONTRACTING, INC. FOR
AS -NEEDED SEWER MANHOLE LINING SERVICES
THIS AMENDMENT NO. ONE TO ON-CALL MAINTENANCE/REPAIR
SERVICES AGREEMENT ("Amendment No. One") is made and entered into as of this
23rd day of June, 2020 ("Effective Date"), by and between the CITY OF NEWPORT
BEACH, a California municipal corporation and charter city ("City"), and ZEBRON
CONTRACTING, INC., a California corporation ("Contractor"), whose address is Post
Office Box 2874, Newport Beach, California 92659, and is made with reference to the
following:
IN*0111r-A%`
A. On August 8, 2017, City and Contractor entered into a Maintenance/Repair
Services Agreement ("Agreement") to engage Contractor to perform on-call
maintenance and/or repair services for City ("Project").
B. The parties desire to enter into this Amendment No. One to extend the term of the
Agreement to August 1, 2022, to increase the total compensation, to amend the
City's administration of the Agreement, and to update insurance requirements.
NOW, THEREFORE, it is mutually agreed by and between the undersigned parties
as follows:
1. TERM
Section 1 of the Agreement is amended in its entirety and replaced with the
following: "The term of this Agreement shall commence on the Effective Date, and shall
terminate on August 1, 2022, unless terminated earlier as set forth herein."
2. COMPENSATION TO CONTRACTOR
Section 4.1 of the Agreement is amended in its entirety and replaced with the
following: "City shall pay Contractor for the Services on a time and expense not -to -exceed
basis in accordance with the provisions of this Section, the Letter Proposal, and the
Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein by
reference. Except as otherwise provided herein, no rate changes shall be made during
the term of this Agreement without the prior written approval of City. Contractor's
compensation for all Services performed in accordance with this Agreement, including all
reimbursable items and subcontractor fees, shall not exceed Four Hundred Thousand
Dollars and 001100 ($400,000.00), without prior written amendment to the Agreement."
The total amended compensation reflects Contractor's additional compensation for
additional Services to be performed in accordance with this Amendment No. One,
including all reimbursable items and subcontractor fees, in an amount not to exceed One
Hundred Fifty Thousand Dollars and 001100 ($150,000.00).
ZEBRON CONTRACTING, INC. Page 1 7-3
Q611i•IRII:7-rII*].I
Section fi of the Agreement is amended in its entirety and replaced with the
following:
"This Agreement will be administered by the Utilities Department. City's
Wastewater Supervisor or designee shall be the Project Administrator and shall have the
authority to act for City under this Agreement. The Project Administrator shall represent
City in all matters pertaining to the Services to be rendered pursuant to this Agreement."
4. INSURANCE REQIREIVIENTS
Exhibit C, "Insurance Requirements," Section 5(A), is amended in its entirety and
replaced with the following:
"A. Evidence of Insurance. Contractor shall provide certificates of insurance to
City as evidence of the insurance coverage required herein, along with a waiver of
subrogation endorsement for workers' compensation and other endorsements as
specified herein for each coverage. All of the executed documents referenced in this
Contract must be returned to City within ten (10) regular City business days after the date
on the "Notification of Award." Insurance certificates and endorsements must be
approved by City's Risk Manager prior to commencement of performance. Current
certification of insurance shall be kept on file with City at all times during the term of this
Contract. The certificates and endorsements for each insurance policy shall be signed
by a person authorized by that insurer to bind coverage on its behalf. At least fifteen (15)
days prior to the expiration of any such policy, evidence of insurance showing that such
insurance coverage has been renewed or extended shall be filed with the City. If such
coverage is cancelled or reduced, Contractor shall, within ten (10) days after receipt of
written notice of such cancellation or reduction of coverage, file with the City evidence of
insurance showing that the required insurance has been reinstated or has been provided
through another insurance company or companies. City reserves the right to require
complete, certified copies of all required insurance policies, at any time."
5. INTEGRATED CONTRACT
Except as expressly modified herein, all other provisions, terms, and covenants
set forth in the Agreement shall remain unchanged and shall be in full force and effect.
[SIGNATURES ON NEXT PAGE]
ZEBRON CONTRACTING, INC. Page 2 7.4
IN WITNESS WHEREOF, the parties have caused this Amendment No. One to be
executed on the dates written below.
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date: I /�?,o
CITY OF NEWPORT BEACH,
a California municipal corporation
Date:
By: L-,&= By:
fir. Aaron C. Harp Will O'Neill
City Attorney Mayor
ATTEST:
Date:
En
Leilani I. Brown
City Clerk
CONTRACTOR: ZEBRON
CONTRACTING, INC., a California
corporation
Date:
By:
Roger Decker
President
Date:
By:
Ty Kline
Secretary
[END OF SIGNATURES]
ZEBRON CONTRACTING, INC. Page 3 7.5