CASE NO.:
REQUEST FOR MODIFICATION TO PROVISIONS
OF TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE)
OF THE NEWPORT BEACH MUNICIPAL CODE
(See Reverse for Basis for Approve[) (Fee $291)
REQUEST FOR ALTERNATE MATERIAL
/// OR METHOD OF CONSTRUCTION
(See Reverse for Basis for Approval) (Fee $291)
For above requests, complete Sections 9, 2 & 3
below by printing in ink or typing.
JOB ADDRESS:
SITE ADDRESS:
Owner moi.
Address
Zip 927j9
Daytime Phone (21Y) Z'S9J9
w
FOR STAFF USE ONLY
Plan Check# t!fier-?02.1 #of Stories T,..,�v
Occupancy C1 ssification�r. (y2
Use of Building H. (T?'r.j- # of Units r'x
Project Status ^{Gss ;, zr%r
Construction Type svrI'-JW
Verified by '1—>
No. of Items [ti.�
Fee due `LSI'—
DISTRIBUTION:
❑ Owner Plan Check
�j�
'E' Petitioner ❑ Inspector
Fire fROther Pe+,fioe—r
PETITIONER:
Petitioner i6'•.6_ '�z--41
(Peddoner to be architect or engineer)
Address 760 0, /61 ¢Yr
iv.rTiti , 1-1.7 Zip-ff.7*V
Daytime Phone
Email.�.'s4°i!✓.�.yi'zP.aY.P✓'.2zfj4/✓ g lnr,�l -CD+'y
1 -L I REQUEST: Submit plans if necessary to illustrate request. Additional sheets or data may be attached. iI
,�}L T7a7liOJ bi S£Ni vG.rsRv i-Gft.r2s✓' �r7h .p /
Petitioner's
Signature
7-o
Position -V-A
CODE SECTIONS:
CA Professional Lic. # Date: 7-1-''21
APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse)
(Signature, statement of owner or applicant, statement of reasons for appeal and filing fees are required.)
CASHIER RECEIPT NUMBER: 2� w 0 �\ 5 j- 4 b Forms\modtf 07/01/21
FOR STAFF USE ONLY
DEPARTMENT ACTION: In accordance with: ❑ CBC 104.11/CFC 104.9
❑ CBC 104.10/CFC 104.8
(Alternate materials & methods)
(CBC Modification)
❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved
❑ Written Comments Attached
By: Date
❑ Request (DOES) (DOES NOT) lessen any fire protection requirements.
❑ Request (DOES)(DOES NOT) lessen the structural integrity
The Request is: Granted ❑ Denied (see reverse for appeal information)
❑ Granted (Rat cation required)
Conditions of Approval:
r
17
4-�45(4454 ITS
f
1'9-nlo'el zr�
Signature Position r>i 2W
Date7
Print Name '-k/'7
APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse)
(Signature, statement of owner or applicant, statement of reasons for appeal and filing fees are required.)
CASHIER RECEIPT NUMBER: 2� w 0 �\ 5 j- 4 b Forms\modtf 07/01/21
Guidelines for Approval of Alternate Materials, Desian and Methods of Construction
Basis For Approval
For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification
or a request for alternate material or method of construction, he/she must determine that special, individual reasons
exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The
resulting condition must be in conformance with the spirit and purpose of the Code provisions involved and that such
modification does not lessen fire protection, structural integrity or occupant safety. The applicant must provide
sufficient information with this application to allow the above evaluation to be made.
Requirements for Submittals
The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the
applicable data listed below:
• State specific code provisions for which alternative is requested and why request is being submitted.
• Describe by code section those provisions for which alternative is desired.
• Compare the proposed alternative versus the code requirements in terms of structural strength, suitability,
effectiveness, fire resistance, safety and health impacts affecting the building or user of the building.
• Demonstrate that the proposed alternative is compatible with balance of code requirements.
• When applicable, specify how authoritative consensus document(s) are used to substantiate proposal.
(Reference draft ICC Building Performance Code Commentary Section 1.4.2.3 for background information).
• Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended
use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods.
• Specify when and where special inspection and testing are required and the standards of acceptance for
demonstrating compliance. Show how the proposed aftemate, if accepted, will be identified on the job site.
• Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate method
to ensure continued compliance.
• State how and where alternate proposal is incorporated within construction plans and prepare plan amendments
as necessary. The design professional has the responsibility to coordinate all construction documents and
ensure compatibility between documents.
• The report and design documents shall be dated, signed and stamped by the design professional according to
the plan submittal procedure.
• For alternate methods of design requests, the applicant shall set performance criteria for his design.
Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to
start of design.
Alternative Design ReviewNerification
The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to
the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to
make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses
the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant to
the Building Division prior to commencing the review.
• Verify that all applicable information and justifications listed above as requirements for submittals is received and
verify that evaluation and design methods used by designer are appropriate to the alternative proposed.
• Verify products are being used in accordance with their listing conditions as required by recognized listing
agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code
and intended use.
• Evaluate performance of material and possible flaws that could affect performance of material in its installed
state.
• The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative
materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not
satisfied that the applicant has met the conditions, the request should be denied in writing with the applicable
reason(s).
Inspection/Field Verification
The alternate proposal as approved in the construction documents must be verified by inspection, and, where
necessary, testing as follows:
• To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the
manufacturer's and engineer's installation procedures, inspectors should check product labeling, certification,
quality assurance processes, and testing, as applicable.
• When appropriate, an approved third party quality assurance inspection and testing service may be required for
continuous and complex inspection and testing activities. This is intended to verify that construction complies
with the code and the approved plans.
Information on Procedure for Appeal from a Determination or Action by the Chief Building Official or
Fire Code Official
Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent
may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual
reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to
State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent
to that prescribed by that standards or that due to legal or physical constraints, compliance with the standards or
providing equivalency would create an unreasonable hardship.
Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You
will be notified in writing of the appeal hearing's time and date.