Loading...
HomeMy WebLinkAboutX2018-3500 - Permit Application (2)CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT MULD100 Civic Center Drive P D. Box 1 68 1 NewpNG ort Beach, CA 92658-8915 www.newportbeachca.gov 1(949) 644-3200 RESIDENTIAL ELECTRICAL, MECHANICAL AND PLUMBING SUBMITTAL QUESTIONNAIRE Job Address: tg;(, hjtiliiaGrtltvt iQ, t4,g r .r4 N266o The above -proposed project may need electrical, mechanical orplumbin ermit r quelans sta noot what eexists, InT questions are directed to the new work requested for the applicable ohese rder for this to be accurately determined and to eliminate confusion or delays in have the design professional complete the questions below. the permitting please complete or If the answer to a question below is -YES," an electrical, mechanical or plumbing plan check is required. To expedite permit process, please submit an application, plans (2 sets) and be prepared to pay plan check fees. NOTE: The Chief Building Official may make exceptions for minor work, additions, and alterations. 1. Is the electrical service 600 amps or larger? Nu YES 2. Is there a solar photovoltaic or non -conventional system? El 3. Is there an electrical standby�] generator or fuel cell? 9,af rizpo MECHANICAL ,// u ❑ Penv T 1. Does conditioned space exceed 7,000 square feet? 2. Does project include a basement or subterranean garage which requires ventilation in lieu of natural ventilation? mechanical ❑ 3. Does project include enclosed standby generator system w/ mechanical exhaust venting? ^' E3 E3PLUMBING ❑ 1. Does project include a hydronic heating system? 2. Does project include a sump pump located inside structure to lift water discharge to grade level? [� 3. Does project include a sewage elector system? 4. Does project include hot water boiler exceeding 120 gallon capacity or 400,000 B.T.U. input? 5. Does project include a natural gas system exceeding 750,000 B.T.U.? 6. Does project include a natural gas system w/ pressure exceeding 14 inch water column [%" pall (Medium pressure or greater)? 7. Does project include a vehicle compressed natural gas [CNG] fueling system? 8. Does project include a Graywater system or Cistern rain water harvesting system? 9. Does project include an alternate plumbing method or material which requires submittal of an alternate method and materials request? I certify that the above information is true and correct Signature: (V23l-z,Ql Date: _ Print Name: Phone #: 1 fiy s zS aoe 1 FO—k RESIDENTIALENIPSub,oiHal Q.,g.,naire 9 -IS Lei L ■