Loading...
HomeMy WebLinkAbout08 - Cliff Drive Clubhouse Rehabilitation — Award of Contract No. 8695-1 (20F13)Q �EwPpRT CITY OF O � z NEWPORT BEACH <,FORN'P City Council Staff Report October 26, 2021 Agenda Item No. 8 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Tom Sandefur, P.E., Assistant City Engineer tsandefur@newportbeachca.gov PHONE: 949-644-3321 TITLE: Cliff Drive Clubhouse Rehabilitation — Award of Contract No. 8695-1 (20F13) ABSTRACT - Staff has received construction bids for the Cliff Drive Clubhouse Rehabilitation project and requests City Council approval to award the construction contract to A2Z Construct, Inc. The project consists of removal and replacement of the existing deteriorated exterior clubhouse walls, adding a new Americans with Disabilities (ADA) compliant concrete walkway, painting the building, renovating the interior of the building, and replacing the Heating, Ventilation, and Air Conditioning (HVAC) and lighting systems. RECOMMENDATION: a) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (a) (minor interior or exterior alterations involving such things as partitions and plumbing) of the CEQA Guidelines, because this project has no potential to have a significant effect on the environment; b) Approve the project drawings and specifications; c) Award Contract No. 8695-1 to A2Z Construct, Inc. for the total bid price of $185,750, and authorize the Mayor and City Clerk to execute the contract; and d) Establish $27,850 (approximately 15 percent) contingency to cover the cost of unforeseen work not included in the original contract. DISCUSSION: The Cliff Drive Clubhouse, located within Cliff Drive Park, is an approximately 750 -square - foot Community Center built over 60 years ago. The building shows signs of deterioration including extensive wood rot in the siding and mold in the storage room. In addition, the building lacks insulation and the HVAC and lighting systems need updating. Work to update the building triggers necessary path of travel modifications to comply with the ADA. The approach sidewalk modifications require the removal of a large ficus tree that overhangs the building. The removal of the tree benefits the building by eliminating some of the excessive shading, moisture and root intrusion issues currently present. 8-1 Cliff Drive Clubhouse Rehabilitation —Award of Contract No. 8695-1 (20F13) October 26, 2021 Page 2 The project was reviewed by the Parks, Beaches, and Recreation Commission on October 5, 2021 and recommended for approval. At 10 a.m. on August 26, 2021, the City Clerk opened and read the following bids for this project: 1:319]9]21:1 Ito] 1010:11I7_1LVA MIIJ►11 Low A2Z Construct, Inc. $ 185,750.00 2nd Golden State Steel, Inc. $ 254,654.00 3rd R Dependable Construction, Inc. $ 256,750.00 4th RS Construction and Development $ 259,750.00 5th Optima RPM, Inc. $ 288,476.65 6th Cornejo Construction Company $ 296,920.00 7th Thomco Construction, Inc. $ 308,330.00 8th MLC Constructors $ 358,650.00 9th MBC Enterprises, Inc. $ 387,000.00 10th Granville Contracting & $ 422,969.00 Management, Inc. The apparent low bidder for this project, A2Z Construct, Inc., submitted a bid approximately 8% percent less than the Engineer's Estimate of $200,750. A2Z Construct, Inc. submitted all the necessary forms and possesses a Classification "A" and "B" License as required by the project specifications. A2Z Construct, Inc. has successfully completed similar jobs for public agencies including the Corona del Mar Restroom Repair Project, Corporation Yard Fence Replacement Project, and the Grant Howald Park Restroom Rehabilitation Project in Newport Beach. Work necessary to complete this contract consists of replacing the exterior of the building, painting, wood patching and repair, installing a new pathway to the building, adding a new water fountain, replacing the wall behind the sidewalk at the park, and removing an interfering tree. A2Z Construct, Inc. will have 40 consecutive working days to complete the work once given the notice to proceed. Initial work is expected to begin in December to accommodate facility programming. Tardy completion of the project will be assessed liquidated damages at $1,500 per calendar day. FISCAL IMPACT: The adopted FY 2021-22 Capital Improvement Program budget includes sufficient funding for the award of this contract. Project funding will be expensed from the following accounts: Account Description FFP: Parks/Community Ctrs Account Number 56201-980000-20F13 Amount $ 214,600.00 Total: $ 214,600.00 8-2 Cliff Drive Clubhouse Rehabilitation —Award of Contract No. 8695-1 (20F13) October 26, 2021 Page 3 Proposed fund uses are as follows: Vendor Purpose Amount A2Z Construct, Inc. Construction Contract $ 185,750.00 A2Z Construct, Inc. Contingency $ 27,850.00 Various Incidentals, Printing $ 1,000.00 Total: $ 214,600.00 Staff recommends establishing $27,850 (approximately 15 percent of total bid) for contingency purposes and unforeseen conditions associated with construction. The project drawings and specifications will be available at the October 26, 2021 City Council meeting or by request. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (a) (minor interior or exterior alterations involving such things as partitions and plumbing) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. �[0rev The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 8-3 Attachment A D LL U CLIFF DR. ® PROJECT LOCATION L ND ® HO NO 0 SCA E CLIFF DRIVE CLUBHOUSE BUILDING CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT REHAB LOCATION MAP C-8695-1 10/11/21