Loading...
HomeMy WebLinkAbout05_Stein Residence CDP_PA2021-249CITY OF NEWPORT BEACH ZONING ADMINISTRATOR STAFF REPORT January 13, 2022 Agenda Item No. 5 SUBJECT: Stein Residence (PA2021-249) Coastal Development Permit No. CD2021-064 SITE LOCATION: 6501 and 6503 Seashore Drive APPLICANT: Eric Aust OWNER: Steve Stein PLANNER: Patrick Achis, Assistant Planner 949-644-3237, pachis@newportbeachca.gov LAND USE AND ZONING General Plan Land Use Plan Category: RT (Two Unit Residential) Zoning District: R-2 (Two-Unit Residential) Coastal Land Use Plan Category: RT-E (Two Unit Residential - (30.0 - 39.9 DU/AC)) Coastal Zoning District: R-2 (Two-Unit Residential) PROJECT SUMMARY A request for a coastal development permit to demolish an existing duplex and construct a new, three-story, 4,325-square-foot duplex with two attached 385-square-foot, two-car garages. The project also includes additional appurtenances such as site walls, fences, patios, landscaping, and drainage devices. All improvements will occur within the confines of the private property. The design complies with all development standards including height, setbacks, and floor area limit, and no deviations are requested. RECOMMENDATION 1) Conduct a public hearing; 2) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment and the exceptions to this exemption do not apply; and 3) Adopt Draft Zoning Administrator Resolution No. _ approving Coastal Development Permit No. CD2021-064 (Attachment No. ZA 1). 1 Stein Residence (PA2021-249) Zoning Administrator, January 13, 2022 Page 2 Tmplt: 07/25/19 DISCUSSION Land Use and Development Standards The subject property is in the R-2 Coastal Zoning District, which is intended to provide areas appropriate for single- and two-unit residential development and is consistent , and Zoning Code. A coastal development permit is required, and the property is not eligible for a waiver for de minimis development because it is in the Coastal Commission Appeal Area. The property consists of one legal lot fronting Seashore Drive, located directly below West Newport Park. The lot is rectangular in shape, topographically flat, and is currently developed with a residential duplex. The existing duplex will be demolished and replaced with the construction of a new duplex. The neighborhood is predominantly developed with two-story residences and an occasional three-story residence, as demonstrated in the oblique aerial image provided in Attachment No. ZA 2. The proposed design, bulk, and scale of the development is consistent with applicable development standards of the zoning district and the expected future development of the neighborhood. On April 14, 2020, the City Council adopted two ordinances to amend Title 20 (Zoning Code) and Title 21 (Local Coastal Program Implementation Plan) of the Newport Beach Municipal Code (NBMC) revising Setback Map No. S-1A to adjust the required setbacks for the subject property. In conjunction with the amendments, this action revoked Variance No. VA0012 and Modification No. MD2343 previously authorized for the site permitting setback encroachments for the existing duplex. The amendments established the current setbacks and buildable area applicable to project, which was found to be consistent with other properties in the vicinity. The proposed duplex and accessory structures conform to all applicable development standards, including floor area limit, setbacks, height, and off-street parking as evidenced by the project plans and illustrated in Table 1 below. Table 1 Development Standards Development Standard Standard Proposed Setbacks (min.) Front (Seashore Drive) 0 feet 0 feet Sides 4 feet 4 feet Rear (Alley) 5 feet 5 feet Allowable Floor Area (max.) 5,244 square feet 5,095 square feet Open Space (min.) 394 square feet 394 square feet Parking (min.) 4-car spaces 4-car spaces Height (max.) 24-foot flat roof 29-foot sloped roof 24-foot flat roof elements 29-foot sloped roof 2 Stein Residence (PA2021-249) Zoning Administrator, January 13, 2022 Page 3 Tmplt: 07/25/19 Hazards The project site is separated from the shoreline by a public alley and a block of residential development. The site is not protected by a bulkhead or other protective device. The finish floor elevation of the proposed duplex is 13.25 feet based on the North American Vertical Datum of 1988 (NAVD88), which complies with the minimum 9.0-foot (NAVD88) elevation standard for new structures. Due to the higher finish floor and the intervening development, impacts from sea level rise are not anticipated at this time for the 75-year economic life of the proposed improvements. The property is in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of a building permit. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. Water Quality Pursuant to Section 21.35.030 (Construction Pollution Prevention Plan) of the NBMC, a Construction Pollution Prevention Plan (CPPP) is required to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived from construction chemicals and materials. A CPPP has been provided and construction plans and activities will be required to adhere to the CPPP. Pursuant to Section 21.35.050 (Water Quality and Hydrology Plan) of the NBMC, due to the proximity of the development to the shoreline and the development containing more than 75 percent of impervious surface area, a preliminary Water Quality and Hydrology Plan (WQHP) is required. The preliminary WQHP will be polluted runoff and hydrologic site characterization, a sizing standard for BMPs, use of an LID approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. Construction plans will be reviewed for compliance with the approved WQHP prior to building permit issuance. Public Access and Views The project site is located within West Newport, between the nearest public road paralleling the sea or shoreline and the sea or shoreline. Implementation Plan 3 Stein Residence (PA2021-249) Zoning Administrator, January 13, 2022 Page 4 Tmplt: 07/25/19 Section 21.30A.040 requires that the provision of public access bear a reasonable impact and be proportional to the impact. In this case, the project replaces an existing residential duplex located on an R-2 lot with a new residential duplex. The project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. Vertical access to the coast is available on either side of the project site via the Walnut Street and Lugonia Street ends. Lateral access is provided on the beach and through the West Ocean Front Alleyway. The project does not include any features that would obstruct access along these routes. The project site is located adjacent to a Coastal Viewpoint as identified in the Coastal Land Use Plan. The nearest designated coastal viewpoint is approximately 40 feet away from the project site, at the West Newport Park. The project site is directly viewshed. The building design features large glass windows throughout, frameless glass guardrails, and uses modern lines and architectural treatments which provide for visual interest. T standards will prevent new impacts to views of the coast as the new residence will maintain a building envelope consistent with the existing neighborhood pattern of development. ENVIRONMENTAL REVIEW This project is exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment. Class 3 exempts the demolition of up to three single-family residences and additions of up to 10,000 square feet to existing structures. The proposed project consists of the demolition of a duplex residence and the construction of a new 4,325-square-foot, three- story duplex with an attached parking for four cars. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. 4 Stein Residence (PA2021-249) Zoning Administrator, January 13, 2022 Page 5 Tmplt: 07/25/19 PUBLIC NOTICE Notice of this public hearing was published in the Daily Pilot, mailed to all owners and residential occupants of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways), including the applicant, and posted on the subject property at least 10 days before the scheduled hearing, consistent with the provisions of the Municipal Code. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the City website. APPEAL PERIOD: This action shall become final and effective 14 days following the date the Resolution is adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 (Local Coastal Implementation Plan) of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the 13120, and Section 30603 of the Coastal Act. For additional information on filing an appeal, contact the Planning Division at 949-644-3200. Prepared by: BMZ/pda Attachments: ZA 1 Draft Resolution ZA 2 Vicinity Map and Oblique Aerial ZA 3 Project Plans 5 Attachment No. ZA 1 Draft Resolution 6 05-14-19 RESOLUTION NO. ZA2022-### A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH, CALIFORNIA, APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2021-064 TO DEMOLISH AN EXISTING RESIDENTIAL DUPLEX AND CONSTRUCT A NEW THREE (3)-STORY RESIDENTIAL DUPLEX WITH ATTACHED PARKING FOR FOUR (4) CARS LOCATED AT 6501 AND 6503 SEASHORE DRIVE (PA2021-249) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Eric Aust (Applicant), with respect to property located at 6501 and 6503 Seashore Drive and legally described as Lot 8, Block E, in Seashore Colony Tract, requesting approval of a coastal development permit. 2. The Applicant proposes to demolish an existing duplex and construct a new three (3)-story, 4,325-square-foot duplex with two (2) attached 385-square-foot, two (2)-car garages. The project also includes additional appurtenances such as site walls, fences, patios, landscaping, and drainage devices. All improvements will occur within the confines of the private property. The design complies with all development standards including height, setbacks, and floor area limit, and no deviations are requested. 3. The subject property is categorized RT (Two Unit Residential) by the General Plan Land Use Element and is located within the R-2 (Two-Unit Residential) Zoning District. 4. The subject property is located within the coastal zone. The Coastal Land Use Plan category is RT-E (Two Unit Residential) - (30.0 - 39.9 DU/AC) and it is located within the R-2 (Two-Unit Residential) Coastal Zone District. 5. A public hearing was held on January 13, 2022, online via Zoom. A notice of time, place and purpose of the hearing was given in accordance with the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to, and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures), because it has no potential to have a significant effect on the environment. 2. Class 3 exempts the demolition of up to three (3) single-family residences and additions of up to 10,000 square feet to existing structures. The proposed project consists of the 7 Zoning Administrator Resolution No. ZA2022-### Page 2 of 9 02-03-2020 demolition of a residential duplex and the construction of a new 5,095-square-foot, three (3)-story duplex with attached parking for four (4) cars. 3. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision) of the NBMC, the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. On April 14, 2020, the City Council adopted two ordinances to amend Title 20 (Zoning Code) and Title 21 (Local Coastal Program Implementation Plan) revising Setback Map No. S-1A to adjust the required setbacks for the subject property (PA2019-216). In conjunction with the amendments, this action revoked Variance No. VA0012 and Modification No. MD2343 previously authorized for the site permitting setback encroachments for the existing duplex. The amendments established the current setbacks and buildable area applicable to project, which was found to be consistent with other properties in the vicinity. 2. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 5,244 square feet and the proposed floor area is 5,095 square feet. b. The proposed development provides the minimum required setbacks, which are 0 feet along the front property line abutting Seashore Drive, 4 feet along each side property line and 5 feet along the rear property line abutting the alley. c. The highest guardrail is less than 24 feet from existing grade and the highest ridge is no more than 29 feet from existing grade, which comply with the maximum height requirements. d. The project includes enclosed and covered parking for a total of four (4) vehicles, complying with the minimum two (2)-car space parking per unit requirement for residential duplexes. 8 Zoning Administrator Resolution No. ZA2022-### Page 3 of 9 02-03-2020 3. The neighborhood is predominantly developed with two (2)-story residences and an occasional three (3)-story, single-family residence. The proposed design, bulk, and scale of the development is consistent with applicable development standards of the zoning district and the expected future development of the neighborhood. 4. The finish floor elevation of the proposed duplex residence is 13.25 feet based on the North American Vertical Datum of 1988 (NAVD 88), which complies with the minimum 9.0-foot (NAVD 88) elevation standard for new structures. Impacts from sea level rise are not anticipated at this time for the 75-year economic life of the proposed improvements. 5. The property is in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. 6. Pursuant to Section 21.35.030 (Construction Pollution Prevention Plan) of the NBMC, a Construction Erosion Control Plan was provided to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived by construction chemicals and materials. The project design also addresses water quality through the inclusion of a post-construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event runoff on-site. Any water not retained on- storm drain system. 7. Pursuant to NBMC Section 21.35.050, due to the proximity of the development to the shoreline and the development containing more than 75 percent of impervious surface area, a Water Quality and Hydrology Plan (WQHP) is required. The WQHP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, use of an LID approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. 8. Proposed landscaping will comply Implementation Plan Section 21.30.075. A condition of approval is included that requires drought-tolerant species. Prior to issuance of building permits, the final landscape plans will be reviewed to verify invasive species are not planted 9. The project site is located adjacent to a Coastal Viewpoint as identified in the Coastal Land Use Plan. The nearest designated coastal viewpoint is approximately 40 feet away from the project site, at the West Newport Park. The project site is directly across from the The building design features large glass windows throughout, frameless glass guardrails, and uses modern lines and architectural treatments which provide for visual interest. T compliance with height and setback development standards will prevent new impacts to 9 Zoning Administrator Resolution No. ZA2022-### Page 4 of 9 02-03-2020 views of the coast as the new residence will maintain a building envelope consistent with the existing neighborhood pattern of development. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Fact in Support of Finding: 1. The project site is located within West Newport, between the nearest public road paralleling the sea or shoreline and the sea or shoreline. Implementation Plan Section 21.30A.040 requires that the provision of public access bear a reasonable relationship between the In this case, the project replaces an existing residential duplex located on an R-2 lot with a new residential duplex. The project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. 2. Vertical access to the coast is available on either side of the project site via the Walnut Street and Lugonia Street ends. Lateral access is provided on the beach and through the West Ocean Front Alleyway. The project does not include any features that would obstruct access along these routes. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby finds this project is categorically exempt from the California Environmental Quality Act pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. 2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2021-064, which is attached hereto and incorporated by reference. 3. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local 10 Zoning Administrator Resolution No. ZA2022-### Page 5 of 9 02-03-2020 Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 13TH DAY OF JANUARY, 2022. __________________________ Jaime Murillo, Zoning Administrator 11 Zoning Administrator Resolution No. ZA2022-### Page 6 of 9 02-03-2020 CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Prior to the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, whatsoever which development. This letter shall be scanned into the plan set prior to building permit issuance. 3. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. No demolition or construction materials shall be stored on public property. 4. This approval does not authorize any new or existing improvements (including landscaping) on State tidelands, public beaches, or the public right-of-way. 5. This Coastal Development Permit does not authorize any development seaward of the private property. 6. The Applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of native birds pursuant to MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is 12 Zoning Administrator Resolution No. ZA2022-### Page 7 of 9 02-03-2020 found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 7. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented prior to and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 8. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 9. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stock piles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 10. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 11. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 12. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 13. The Applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Coastal Development Permit. 14. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 15. Prior to the issuance of building permits, the Applicant shall submit a final construction erosion control plan. The plan shall be subject to the review and approval by the Building Division. 16. Prior to the issuance of building permits, the Applicant shall submit a final drainage and grading plan. The plan shall be subject to the review and approval by the Building Division. 13 Zoning Administrator Resolution No. ZA2022-### Page 8 of 9 02-03-2020 17. Prior to issuance of a building permit, a copy of the Resolution, including conditions of plans. 18. Prior to issuance of a building permit, the Applicant shall submit to the Planning Division an additional copy of the approved architectural plans for inclusion in the Coastal Development file. The plans shall be identical to those approved by all City departments for building permit issuance. The approved copy shall include architectural sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the elements approved by this Coastal Development Permit. 19. Prior to issuance of building permits, the final WQMP shall be reviewed and approved by the Building Division. Implementation shall be in compliance with the approved CPPP and WQMP and any changes could require separate review and approval by the Building Division. 20. Prior to the issuance of building permits, the Applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought tolerant plantings, non- invasive plant species and water efficient irrigation design. The plans shall be approved by the Planning Division. 21. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 22. All noise generated by the proposed use shall comply with the provisions of Chapter 10.26 and other applicable noise control requirements of the NBMC. The maximum noise shall be limited to no more than depicted below for the specified time periods unless the ambient noise level is higher: Between the hours of 7:00AM and 10:00PM Between the hours of 10:00PM and 7:00AM Location Interior Exterior Interior Exterior Residential Property 45dBA 55dBA 40dBA 50dBA Residential Property located within 100 feet of a commercial property 45dBA 60dBA 45dBA 50dBA Mixed Use Property 45dBA 60dBA 45dBA 50dBA Commercial Property N/A 65dBA N/A 60dBA 23. Construction activities shall comply with Section 10.28.040 of the Newport Beach Municipal Code, which restricts hours of noise-generating construction activities that produce noise to between the hours of 7 a.m. and 6:30 p.m., Monday through Friday. Noise-generating construction activities are not allowed on Saturdays, Sundays or Holidays. 14 Zoning Administrator Resolution No. ZA2022-### Page 9 of 9 02-03-2020 24. The project shall comply with the construction site fencing and noticing requirements as provided in Chapter 15.60 of the NBMC 25. Prior to the issuance of building permit, the Applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 26. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 27. This Coastal Development Permit No. CD2021-064 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the NBMC, unless an extension is otherwise granted. 28. To the fullest extent permitted by law, Applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including approval of Stein Residence including, but not limited to, Coastal Development Permit No. CD2021-064 (PA2021-249). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by Applicant, City, and/or the parties initiating or bringing such proceeding. The Applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages, which City incurs in enforcing the indemnification provisions set forth in this condition. The Applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. 15 Attachment No. ZA 2 Vicinity Map and Oblique Aerial 16 VICINITY MAP Coastal Development Permit No. CD2021-064 PA2021-249 6501 and 6503 Seashore Drive Subject Property Subject Property 17 Attachment No. ZA 3 Project Plans 18 19 20 21 22 2 STORY BUILDING2 STORY BUILDING2 STORY BUILDING2 STORY BUILDING2 STORY BUILDING2 STORY BUILDING2 STORY BUILDING2 STORY BUILDING2 STORY BUILDINGBUILDING2 STORY BUILDING2 STORY BUILDING23 BUILDING24 25 26 27 28 29 30 31 32 33