HomeMy WebLinkAbout08 - Dredging Disposal Alternatives Analysis by a Private Party: Harbor Commission Recommendation - PowerPointJanuary 25, 2022
Item No. 8
City Council
January 25, 2022
Public Works
Department
Current Dredge Project & 2021 Dredge
Document Name: DredgingBoundaries2021
Ea! , HERE, G arm in, O Op enSt—tMap contributors, and the G IS user mm m unty
- :7
417 833 Ulaclalrner:
=oery rsasartabe e'art blas Deer.made lD assm thea= aq of the
Feet da3 provided. Kme.,ef. Iris Cry Cr Mevlparl Beach a'IrlRE
errobyees and agents dadzirn any and W msWMRy nom or
rdatleg to any resLlta obtained In Fuse.
LEGEND
15 EXISTING GROUND MAJOR
CONTOUR (5)
EXISTING GROUND MINOR
CONTOUR (1)
\ 30 PROPOSED MAJOR CONTOUR (5)
` PROPOSED MINOR CONTOUR (1')
\ / PROPOSED LIMITS OF GRADING
\`\ PROPOSED 5 -FT DEPTH
EXCAVATION LIMITS
-------------- BREAKLINE
\ _ I
11ID
PROPOSED RETAINING WALL
1
205'
4 VOLUME SUMMARY
5
EXCAVATION AREA = 152,582 SQ FT
30
5 -FT DEPTH EXCAVATION = 28,256 CY
zs
STOCKPILE = 78,000 CY
NET = 106,256 CY
-----
10m20214 NOTES
371' WATER ELEV:
0.2FT
�bR. 1. HORIZONTAL COORDINATES BASED ON NSRS 2011
CALIFORNIA STATE PLANES, ZONE VI, US FOOT.
REUSE AREA � M / -10 FT RETAINING WALL
1.96 ACRES \ 2. VERTICAL DATUM BASED N NAVD88.
Start of Marine
Protected Area3. ORTHO IMAGERY PER NEARMAP ®, DATED
MPA covers 04128/2021.
area below 4
mean high tide N o so 120
25 FT o or an elevation
of 4.6 -ft - SCALE IN FEET
-�� approximated
by DUrole line I CONCEPTUAL STOCKPILE GRADING,
cr dp
LOWER NEWPORT BAY
NEWPORT BEACH, CALIFORNIA
Geosyntec° FIGURE
consultants
_CT NO: SC1145 OCTOBER 2021
Question and Comments?
Your Public Works Department
Protecting and Providing Quality
Public Improvements and Services
www. newportbeachca.gov/harbordredginq