Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutF2020-0224 - CalcsRESIDENTIAL FIRE SYSTEMS, INC.
8085 EAST CRYSTAL DRIVE
ANAHEIM, CA. 92807
F//.nn O r O.A ^�
(�
/ HYDRAULIC CALCULATIONS
'i/IQI�I
�`QG
2 Ito 9 E OVe cofty1f
FOR
WEDGE HOUSE
SECOND FLOOR
2HD CALC AT LIVING ROOM
FILE NUMBER: 13960
DATE: APR 22, 2020
-DESIGN DATA -
OCCUPANCY CLASSIFICATION: NFPA 13D, 2016
EDITION
DENSITY:
0.05 gpm/sq, ft.
AREA OF APPLICATION:
512.0 sq. ft.
COVERAGE PER SPRINKLER:
256.0 sq. ft. max.
NUMBER OF SPRINKLERS CALCULATED:-
2 sprinklers
--- --
TOTAL SPRINKLER WATER FLOW REQUIRED: 26.6 gpm
TOTAL WATER REQUIRED (including hose): 31.6 qpm
FLOW AND PRESSURE (@ BOR): 26.6 qpm @ 30.2
psi
REQUIRED PRESSURE (@ SRC): 96.0 psi
SPRINKLER ORIFICE SIZE:
7/16 inch
NAME OF CONTRACTOR: RESIDENTIAL FIRE SYSTEMS, INC
DESIGN/LAYOUT BY: RUBI G.
AUTHORITY HAVING JURISDICTION: CITY OF NEWPORT BEACH
CONTRACTOR CERTIFICATION NUMBER: 786965
CALCULATIONS BY HASS COMPUTER PROGRAM ,
HRS SYSTEMS, INC.
__.._SPRINKLER
SYSTEM
-_
HYDRAULIC
ANALYSIS- -
-. _- .Page 2
_ _
CALC.SDF
NEWPORT BEACH\FIRE SPRINKLERS\CALLS\INITIAL\2HD
AT SOURCE
0.0 GPM
DATE: 4/22/2020,
HOSE STREAM
GPM
OTHER
JOB TITLE: '
.0
26.6 GPM
TOTAL
DISCHARGE FROM
WATER SUPPLY DATA
NODE
ANALYSIS DATA
NODE TYPE -
P(PSI) DSURE
RESID.
FLOW
TAG ELEVATION
TAL
SOURCE STATIC
@
PRESS.
@ DEMAND
PRESS.
NODE PRESS.
PRESS.
(GPM)
PSI)
(GPM)
(PSI)
TAG (PSI)
(PSI)
8.2
- - -
2
20.0
66.0
20.0
1500.0
66.0
31.6
46.0
SRC
- - -
4
20.0
_ _
_
14.2
AGGREGATE FLOW ANALYSIS:
31.6 GPM
TOTAL
FLOW AT SOURCE
ALLOWANCE
AT SOURCE
0.0 GPM
TOTAL
HOSE STREAM
GPM
OTHER
HOSE STREAM ALLOWANCES
.0
26.6 GPM
TOTAL
DISCHARGE FROM
ACTIVE SPRINKLERS
NODE
ANALYSIS DATA
NODE TYPE -
P(PSI) DSURE
I(GPM)
NODE
TAG ELEVATION
(FT)
20.0
K= 4.90
7.0
13.0
1
8.2
- - -
2
20.0
K= 9.90
7.7
13.6
3
20.0
_ _
10.7
- - -
4
20.0
_ _
_
14.2
- - -
5
20.0
- _ _
15.0
- - -
6
20.0
- - -
15.1
- - -
7
20.0-
- -
1155. 1
- - -
8
20.0
- - -
.1
- - -
9
20.0
- - -
21.4
- - -
10
10.0
- - -
21.4
- - -
11
10.0
- - -
21.0
- - -
12
10.0
- - -
20.0
- - -
13
10.0
- - -
19.7
- - -
14
10.0
- - -
21.7
- - -
TR
10.0
_ _ - _
24.4
FS
5.0
_ _ -- _
27.4
_ _ _
FSI
5.0
- -
-
30.2
_ - _
BR
2.0
2.0
- - -
HOSE STREAM
333.
5.0
U1
-
33.0
U2
-2.0
- - -
- -
34.2
- - -
U3
-3.0
- -
38.2
- - -
-3.0
-4.0
SOURCE
46.0
31.6
SRC
SPRINKLER SYSTEM HYDRAULIC ANALYSIS...___ Page 3
9,: 4/22/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\2HD CALC.SDF
JB TITLE:
/PIPE DATA
PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS.
END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM.
NODES (FT) (K) (PSI) (GPM) FL/FT (PSI)
Pipe: 1 -13.0 1.101 PL 15.33 PF 1.2
1 20.0 4.9 7.0 13.0 4.4 150 FTG 2F3E PE 0.0
2 20.0 0.0 8.2 0.0 0.031 TL 38.33 PV
Pipe: 2 - - 13.6 1.101 PL .1.58 PF 0.5
2 20.0 0.0 8.2 0.0. 4.6 - 150 FTG 2FET -PE 0.0
3 20.0 4.9 7.7 13.6 0.033 TL 15.58 PV
Pipe: 3 -26.6 1.101 PL 13.00 PF 2.5
2 20.0 0.0 8.2 0.0 9.0 150 FTG 2FT2R PE 0.0
4 20.0 0.0 10.7 0.0 0.115 TL 22.00 PV
Pipe: 4 -26.6 1.101 PL 7.00 PF 3.5
4 .20.0 0.0 10.7 0.0 9.0 150 FTG 2F3E PE 0.0
5 20.0 0.0 14.2 0.0 0.115 TL 30.00 PV
Pipe: 5 -9.2 1.101 PL 15.33 PF 0.8
5 20.0 0.0 14.2 0.0 3.1 150 FTG 3E2T2R PE 0.0
6 20.0 0.0 15.0 0.0 0.016 TL 48.33 PV
Pipe: 6 -17.4 1.101 PL 15.00 PF 0.9
5 20.0 0.0 14.2 0.0 5.9 150 FTG 2FR PE 0.0
7 20.0 0.0 15.1 0.0 0.052 TL 18.00 PV
Pipe: 7 0.0 1.101 PL 6.16 PF 0.0
7 20.0 0.0 15.1 0.0 0.0 150 FTG 2F2ETR PE 0.0
8 20.0 0.0 15.1 0.0 0.000 TL 28.16 PV
Pipe: 8 -17.4 1.394 PL 30.00 PF 1.6
7 20.0 0.0 15.1 0.0 3.7 150 FTG 4F6ET3R PE 0.0
9 20.0 0.0 16.7 0.0 0.017 TL 95.00 PV
Pipe: 9 -17.4 1.394 PL 10.00 PF 0.3
9 20.0 0.0 16.7 0.0 3.7 150 FTG E PE 4.3
10 10.0 0.0 21.4 0.0 0.017 TL 18.00 PV
Pipe: 10 -5.7 1.394 PL 14.00 PF 0.1
10 10.0 0.0 21.4 0.0 1.2 150 FTG 2FTR PE 0.0
11 10.0 0.0 21.4 0.0 0.002 TL 25.00 PV
Pipe: 11 9.2 1.394 PL 22.50 PF 0.4
11 10.0 0.0 21.4 0.0 1.9 150 FTG 2F4E2TR PE 0.0
12 10.0 0.0 21.0. 0.0 0,005 TL 71.50 PV
Pipe: 12 9.2 1.101 PL 17.33 PF 1.0
12 10.0 0.0 21.0 0.0 3.1 150 FTG 2F5ET3R PE 0.0
13 10.0 0.0 20.0 0.0 0.016 TL 62.33 PV
SPRINKLERS
SYSTEM HYDRAULIC ANALYSIS-
--
Page 4
DATE:
4/22/2020,
NEWPORT
BEACH\FIRE
SPRINKLERS\CALCS\INITIAL\2HD
CALC.SDF
JOB
TITLE:
PIPE
TAG
Q(GPM)
DIA(IN) LENGTH
PRESS.
END
ELEV.
NOZ.
PT
DISC.
VEL(FPS)
HW(C)
(FT)
SUM.
NODES
(FT)
(K)
(PSI)
(GPM)
FL/FT
(PSI)
Pipe:
13
9.2
1.101
PL
3.33
PF
0.4
13
10.0
0.0
20.0
0.0
3.1
150
FTG
2ET
PE
0.0
14
10.0
0.0
19.7
0.0
0.016
TL
22.33
PV
Pipe:
14
9.2.
1.101
PL
10.00
PF
0.4
14
10.0
0.0
19.7
0.0
3.1
150
FTG
ET
PE -4.3
6
20.0
0.0
15.0
0.0.
0.016
TL
22.00
PV
Pipe:
15
-11.7
1.394
PL
21.25
PF
0.4
10
10.0
0.0
21.4
0.0
2.5
150
FTG
2F3T2R
PE
0.0
TR
10.0
0.0
21.7
0.0
0.008
TL
45.25
PV
Pipe:
16
14.9
1.394
PL
9.66
PF
0.3
TR
10.0
0.0
21.7
0.0
3.1
150
FTG
ETR
PE
0.0
11
10.0
0.0
21.4
0.0
0.013
TL
24.66
PV
Pipe:
100
-26.6
1.394
PL
5.00
PF
0.5.
TR
10.0
0.0
21.7
0.0
5.6
150
FTG
ER
PE
2.2
FS
5.0
0.0
24.4
0.0
0.037
TL
14.00
PV
Pipe:
101
FIXED
PRESSURE
LOSS
DEVICE
FBI
5.0
0.0
27.4
0.0
3.0
psi,
26.6
gpm
FS
5.0
0.0
24.4
0.0
Pipe:
102
-26.6
1.101
PL
4.00
PF
1.5
FSl
5.0
0.0
27.4
0.0
9.0
150
FTG
RC
PE
1.3
BR
2.0
0.0
30.2
0.0
0.115
TL
13.00
PV
Pipe:
103
-26.6
1.055
PL
3.00
PF
0.9
BR
2.0
0.0
30.2
0.0
9.8
150
FTG
E
PE
0.0
U1
2.0
H.S.
31.0
5.0
0.142
TL
6.00
PV
Pipe:
104
-31.6
1.985
PL
4.00
PF
0.2
Ul
2.0
H.S.
31.0
5.0
3.3
150
FTG
ET
PE
1.7
U2
-2.0
0.0
33.0
0.0
0.009
TL
22.00
PV
Pipe:
105
-31.6
2.003
PL
63.75
PF
0.8
U2
-2.0
0.0
33.0
0.0
3.2
150
FTG
3E
PE
0.4
U3
-3.0
0.0
34.2
0.0
0.009
TL
96.75
PV
Pipe:
106
FIXED
PRESSURE
LOSS
DEVICE
U4
-3.0
0.0
38.2
0.0
4.0
psi,
31.6
gpm
U3
-3.0
0.0
34.2
0.0
Pipe:
107
-31,6
0.995
PL
8.25
PF
7.3
U4
-3.0
0.0
38.2
0.0
13.0
150
FTG
TX
PE
0.4
SRC
-4.0
SRCE
46.0
(N/A)
0.259
TL
28.25
PV
SPRINKLER.. SYSTEM. HYDRAULIC .ANALYSIS ---
DATE: 4/22/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\2HD CALC.SDF
JOB TITLE:
NOTES (HASS):
(1) Calculations were performed by the HASS 8.8 computer program
in accordance with NFPA13 (2016)
under license no. 38061304 granted by
HRS Systems, Inc.
208 Southside Square
Petersburg, TN 37144
(931) 659-9760
(2) The system has been calculated to provide an average
imbalance at each node of 0.003 gpm and a maximum
imbalance at any node of 0.065 gpm. ;
(3)Total pressure at each node is used in balancing the system.
Maximum water velocity is 13.0 ft/sec at pipe 107.
(4) Items listed in bold print on the cover sheet
are automatically transferred from the calculation report.
(5) Available pressure at source node SRC under full flow conditions is
65.94 psi with a flow of 40.58 gpm.
(6) PIPE FITTINGS TABLE
User Pipe Table Name: STANDARD.PIP
PAGE: F
MATERIAL: CPVC
HWC: 150
Diameter
Equivalent
Fitting Lengths
in Feet
(in)
F
E T
R K
C
G
45
El Tee RunT Kplg
ChkVly
Gate
11.101
1.00
7.00 5.00
1.00 1.00
8.00
2.00
1.394
2.00
S.00 6.00
1.00 1.00
11.00
3.00
2.003
2.00
11.00 10.00
1.00 1.00
17.00
.3.00
PAGE: K
MATERIAL: CT -K
HWC: 150
Diameter
Equivalent
Fitting Lengths
in Feet
(in)
E
T F
R K
C
G
N X
Ell
Tee 45 -Ell TeeRun Kouplg
ChkVly
GatVly
NPTee AngVly
0.995
2.00
6.00 1.00
2.00 0.00
6.00
0.00
6.00 14.00
PAGE: L
MATERIAL: CT -L
HWC: 150
Diameter
Equivalent
Fitting Lengths
in Feet
-----------
--
(in)
E
T F
R K
C
G
N
Ell
Tee 45 -Ell TeeRun Kouplg
ChkVly
GatVly
NPTee
1.985
6.00
12.00 2.00
4.00 0.50
14.00
1.00
12.00
- - - -- SPRINKLER SYSTEM HYDRAULIC ANALYSIS-- -...... Page 6 -
DATE: 4/22/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\2HD CALC.SDF
JOB TITLE:
PAGE: M
MATERIAL: CT -M
HWC: 150
Diameter
Equivalent
Fitting
Lengths
in Feet
(in)
E T F
R
K
C G N
Ell Tee 45 -Ell
TeeRun
Kouplg
ChkVly GatVly NPTee
1.055
3.00 7.00 1.00
2.00
0.00
8.00 0.00 7.00
-- - SPRINKLER. SYSTEM HYDRAULIC_ANALYSIS _Page.7
DATE: 4/22/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\2HD CALC.SDF
JOB TITLE:
c
c
c
u
F
M
i
0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 rl
p� r 1p N d' M N r1 O
01C4m0 41 as W W MMM W
N
u
T
0
N
m N
+� G
rl +�
UI Fa
a ro
G
o
w
m .,1
v 41
H U
H 'd
O OJ
SA 'O
W
UI N
N N
J
ttl ro
N
O
0 0 0
+1 G
ro
� � G
a o 0
O P.
rd -0
S j N
O ro
.a k ro
Ga N A
v ro
N u
m ro
U
d
H a4
C
a)
N N
C 31
a
ro -H
0
m
rtl C
q O
rl N
N
0
O
z
-- - --- -- --- - - SPRINKLER SYSTEM HYDRAULIC_ ANALYSIS Page 6 _.. '.
DATE: 4/22/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\2HD CALC.SDF
JOB TITLE:
WATER SUPPLY CURVE
72+
I
I
660\
I \
I \
I \
60+ \\ -
I \
I \
I \
54+ \\
I \
I \
I \
P 48+ \
R X \\
E \
S \
S 42+ \
U \\
R \
E \
36+ \
( I \
P \\
S \
I 30+ \
I \
I \\
I \
24+ \
I \
I \
* <-20.0 psi @ 1500 gpm
18+ Flow Test Point
I
I
12+ LEGEND "
X = Required Water Supply "
46.00 psi @ 31.6 gpm
6+ "
0 = Available Water Supply "
65.96 psi @ 31.6 gpm
I "
-+---*----------------------------------------------------------
400
---+-----+------+-------+-----+-------+-----------+400 600 800 1000 1200 1400 1600 1800 2000
FLOW (GPM)
.RESIDENTIAL FIRE .SYSTEMS., .INC.. _. _..
8085 EAST CRYSTAL DRIVE
ANAHEIM, CA. 92807
HYDRAULIC CALCULATIONS
FOR
WEDGE HOUSE
SECOND FLOOR
1HD CALC AT BEDROOM 2
FILE NUMBER: 13460
DATE: APR 22, 2020
-DESIGN DATA-
.00CUPANCY CLASSIFICATION: - NFPA 13D, 2016 EDITION
DENSITY: 0.05 gpm/sq. £t.
AREA OF APPLICATION: 400.0 sq. ft.
COVERAGE: PER SPRINKLER: 400.0 sq. ft. max.
NUMBER OF SPRINKLERS CALCULATED: 1 sprinklers
TOTAL SPRINKLER WATER FLOW REQUIRED: 21.0 gpm
TOTAL WATER REQUIRED (including hose): 26.0 gpm
FLOW AND PRESSURE (@ BOR): 21.0 gpm @ 34.2 psi
REQUIRED PRESSURE (@ SRC): 47.2 psi
SPRINKLER ORIFICE SIZE: 7/16 inch
NAME OF CONTRACTOR: RESIDENTIAL FIRE SYSTEMS, INC
DESIGN/LAYOUT BY: RUBI G.
AUTHORITY HAVING JURISDICTION: CITY OF NEWPORT BEACH
CONTRACTOR CERTIFICATION NUMBER: 786965
CALCULATIONS BY HASS COMPUTER PROGRAM ,
HRS SYSTEMS, INC.
-- --
---------
SPRINKLER
SYSTEM
HYDRAULIC
ANALYSIS
I___. - Page - 2 ----.-
DATE:
4/22/2020,
NEWPORT BEACH\FIRE
SPRINKLERS\CALCS\INITIAL\lHD
CALC.SDF
JOB TITLE:
GPM
TOTAL
DISCHARGE FROM
ACTIVE SPRINKLERS
21.0
WATER
SUPPLY DATA
NODE ANALYSIS DATA
SOURCE
STATIC
RESID.
FLOW
AVAIL.
TOTAL
REQ'D
NODE
PRESS.
PRESS. @
1
PRESS.
@ DEMAND
PRESS.
TAG
(PSI)
(PSI)
(GPM)
(PSI)
(GPM)
(PSI)
SRC
66.0
20.0
1500.0
66.0
26.0
47.2
AGGREGATE FLOW ANALYSIS:
TOTAL
FLOW AT SOURCE
26.0
GPM
TOTAL
HOSE STREAM ALLOWANCE AT SOURCE
0.0
GPM
OTHER
HOSE STREAM ALLOWANCES
5.0
GPM
TOTAL
DISCHARGE FROM
ACTIVE SPRINKLERS
21.0
GPM
NODE ANALYSIS DATA
NODE TAG ELEVATION
NODE TYPE
PRESSURE
DISCHARGE
(FT)
(PSI)..,.
..:.(GPM)
1
20.0
- - - -
20.6
- - -
2
20.0
- - - -
20.6
- - -
3
20.0
- - - -
20.6
- - -
4
20.0
- - - -
20.6
- - -
5
20.0
- - - -
20.6
- - -
6
20.0
- - - -
21.0
- - -
7
20.0
- - - -
20.5
- - -
8
20.0
K= 4.90
18.4
21.0
9
20.0
- - - -
21.7
- - -
10
10.0
- - - -
26.2
- - -
11
10.0
- - - -
26.3
- - -
12
10.0
- - - -
26.1
- - -
13
10.0
- - - -
25.6
- - -
14
10.0
- - - -
25.5
- - -
TR
10.0
- - - -
26.5
- - -
FS
5.0
- - - -
29.0
- - -
FS1
5.0
- - - -
32.0
- - -
BR
2.0
- - - -
34.2
- - -
Ul
2.0
HOSE STREAM
34.8
5.0
U2
-2.0
- - - -
36.6
- - -
U3
-3.0
- - - -
37.7
- - -
U4
-3.0
- - - -
41.7
- - -
SRC
-4.0
SOURCE
47.2
26.0
--
SPRINKLER SYSTEM .HYDRAULIC ANALYSIS..._.. __...-._ _Page 3
DATE: 4/22/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\1HD CALC.SDF
JOB TITLE:
PIPE DATA
PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS.
END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM.
NODES (FT) (K) (PSI) (GPM) FL/FT (PSI)
Pipe: 1 0.0 1.101 PL 15.33 PF 0.0
1 20.0 0.0 20.6 0.0 0.0 150 FTG 2F3E PE 0.0
2 20.0 0.0 20.6 0.0 0.000 TL 38.33 PV
Pipe: 2 0.0 1.101 PL 1.58 PF 0.0
2 20.0 0.0 20.6 0.0 0.0 150 FTG 2FET PE 0.0
3 20.0 0.0 .20.6 0.0 0.000 TL 15.58 PV
Pipe: 3 0.0 1.101 PL 13.00 PF 0.0
2 20.0 0.0 20.6 0.0 0.0 150 FTG 2FT2R PE 0.0
4 20.0 0.0 20.6 0.0 0.000 TL 22.00 PV
Pipe: 4 0.0 1.101 PL 7.00 PF 0.0
4 20.0 0.0 20.6 0.0 0.0 150 FTG 2F3E PE 0.0
5- 20.0 0._0 20.6 0..0 0.000. TL_ 30..00 PV _
Pipe: 5 -6.1� 1.101 PL 15.33 PF 0.4
5 20.0 0.0 20.6 0.0 2.0 150 FTG 3E2T2R PE 0.0
6 20.0 0.0 21.0 0.0 0.007 TL 48.33 PV
Pipe: 6 6.1 1.101 PL 15.00 PF 0.1
5 20.0 0.0 20.6 0.0 2.0 150 FTG 2FR PE 0.0
7 20.0 0.0 20.5 0.0 0.007 TL 18.00 PV
Pipe: 7 21.0 1.101 PL 6.16 PF 2.1
7 20.0 0.0 20.5 0.0 7.1 150 FTG 2F2ETR PE 0.0
8 20.0 4.9 18.4 21.0 0.074 TL 28.16 PV
Pipe: 8 -14.9 1.394 PL 30.00 PF 1.2
7 20.0 0.0 20.5 0.0 3.1 150 FTG 4F6ET3R PE 0.0
9 20.0 0.0 21.7 0.0 0.013 TL 95.00 PV
Pipe: 9 -14.9 1.394 PL 10.00 PF 0.2
9 20.0 0.0 21.7 0.0 3.1 150 FTG E PE 4.3
10 10.0 0.0 26.2 0.0 0.013 TL 18.00 PV
Pipe: 10 -5.5 1.394 PL 14.00 PF 0.0
10 10.0 0.0 26.2 0.0 1.2 150 FTG 2FTR PE 0.0
11 10.0 0.0 26.3 0.0 0.002 TL 25.00 PV
Pipe: 11 6.1. 1.394 PL 22.50 PF 0.2
11 10.0 0.0 26.3 0.0 1.3 150 FTG 2F4E2TR PE 0.0
12 10.0 0.0 26.1 0.0 :.0.002 TL. 71.50 PV
Pipe: 12 6.1 1.101 PL 17.33 PF 0.5
12 10.0 0.0 26.1 0.0 2.0 150 FTG 2F5ET3R PE 0.0
13 10.0 0.0 25.6 0.0 0.007 TL 62.33 PV
--- ---SPRINKLER SYSTEM HYDRAULIC ANALYSIS- _- page A ---
DATE: 4/22/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALLS\INITIAL\1HD CALC.SDF
JOB TITLE:
PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS.
END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM.
NODES (FT) (K) (PSI) (GPM) FL/FT (PSI)
Pipe: 13 6.1 1.101 PL 3.33 PF 0.2
13 10.0 0.0 25.6 0.0 2.0 150 FTG 2ET PE 0.0
14 10.0 0.0 25.5 0.0 0.007 TL 22.33 PV
Pipe: 14 6.1, 1.101 PL 10.00 PF 0.2
14 10.0 0.0 25.5 0.0 2.0: 150 FTG ET PE -4.3
6, 20.0 0.0 21.0 0.0 0.007 TL 22.00 PV
Pipe: 15 -9.4.. 1.394 PL 21.25 PF 0.2
10 10.0 0.0 26.2 0.0 2.0 150 FTG 2F3T2R PE 0.0
TR 10.0 0.0 26.5 0.0 0.005 TL 45.25 PV
Pipe: 16 11.6 1.394 PL 9.66 PF 0.2
TR 10.0 0.0 26.5 0.0 2.4 150 FTG ETR PE 0.0
11 10.0 0.0 26.3 0.0 0.008 TL 24.66 PV
Pipe: 100, -21.0. 1.394 PL 5.00 PF 0.3
TR 10.0 0.0 26.5 0.0 4.4 150 FTG ER PE 2.2
FS - 5.0 0.0 29.0 0.0 0.024 TL 14.00 PV
Pipe: 101 FIXED PRESSURE LOSS DEVICE
FS1 5.0 0.0 32.0 0.0 3.0 psi, 21.0 gpm
FS 5.0 0.0 29.0 0.0
Pipe: 102 -21.0 1.101 PL 4.00 PF 1.0
FS1 5.0 0.0 32.0 0.0 7.1 150 FTG RC PE 1.3
BR 2.0 0.0 34.2 0.0 0.074 TL 13.00 PV
Pipe: 103 -21.0 1.055 PL 3.00 PF 0.5
BR 2.0 0.0 34.2 0.0 7.7 150 FTG E PE 0.0
U1 2.0 H.S. 34.8 5.0 0.092 TL 6.00 PV
Pipe: 104 -26.0 1.985 PL 4.00 PF 0.1
Ul 2.0 H.S. 34.8 5.0 2.7 150 FTG ET PE 1.7
U2 -2.0 0.0 36.6 0.0 0.006 TL 22.00 PV
Pipe: 105 -26.0 2.003 PL 63.75 PF 0.6
U2 -2.0 0.0 36.6 0.0 2.6 150 FTG 3E PE 0.4
U3 -3.0 0.0 37.7 0.0 0.006 TL 96.75 PV
Pipe: 106 FIXED PRESSURE LOSS DEVICE
U4 -3.0 0.0 41.7 0.0 4.0 psi, 26.0 gpm
U3 -3.0 0.0 37.7 0.0
Pipe:- 107 -26.0 0.995 PL 8.25 PF 5.1
U4 -3.0 0.0 41.7 0.0 10.7 150 FTG TX PE 0.4
SRC -4.0 SRCE 47.2 (N/A) 0.181 TL 28.25 PV
- SPRINKLER SYSTEM HYDRAULIC. ANALYSIS ___Page 5- _ --
/22/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\1HD CALC.SDF
:TLE:
�S (HASS):
'(1) Calculations wereerformed b%
P } the HASS 8.8 computer program
in accordance with NFPA13 (2016)
under license no. 38061304 granted by
HRS Systems, Inc.
208 Southside Square
Petersburg, TN 37144
(931) 659-9760
(2) The system has been calculated to provide an average
imbalance at each node of 0.001 gpm .and a maximum
imbalance at any node of 0.006 gpm.
(3) Total pressure at each node is used in balancing the system.
Maximum water velocity is 10.7 ft/sec at pipe 107.
(4) Items listed in bold print on the cover sheet
are automatically transferred from the calculation report.
(5) Available pressure at source node SRC under full flow conditions is
65.96 psi with a flow of 32.21 gpm.
(6) PIPE FITTINGS TABLE
User Pipe Table Name: STANDARD.PIP
PAGE: F
MATERIAL: CPVC
HWC: 150
Diameter
Equivalent Fitting Lengths
in Feet
(in)
F
E
T R K
C
G
45
E1
Tee RunT Kplg
ChkVly
Gate
1.101
1.00
7.00
5.00 1.00 1.00
8.00
2.00
1.394
2.00
8.00
6.00 1.00 1.00
11.00
3.00
2.003
2.00
11.00
10.00 1.00 1.00
17.00
3.00
PAGE: K
MATERIAL: CT -K
HWC: 150
Diameter
Equivalent
Fitting Lengths
in Feet
(in)
E
T
F R K
C
G
N X
Ell
Tee 45
-Ell TeeRun Kouplg ChkVly GatVly
NPTee AngVly
0.995
2.00
6.00
1.00 2.00 0.00
6.00
0.00
6.00 14.00
PAGE: L
MATERIAL: CT -L
HWC: 150
Diameter
Equivalent
Fitting Lengths in Feet
-----_.-- --
(in)
E
T
F R K
C
G
N
-
Ell
Tee 45
-Ell TeeRun Kouplg ChkVly GatVly
NPTee
1.985
6.00
12.00
2.00 4.00 0.50
14.00
1.00
12.00
SPRINKLER SYSTEM HYDRAULIC ANALYSIS ---- ------Page-6
DATE: 4/22/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\1HD CALC.SDF
JOB TITLE:
PAGE: M MATERIAL: CT -M HWC: 150
Diameter Equivalent Fitting Lengths in Feet
(in) E T F R K C G N
Ell Tee 45 -Ell TeeRun Kouplg ChkVly GatVly NPTee
1.055 3.00 7.00 1.00 2.00 0.00 8.00 0.00 7.00
' SPRINKLER SYSTEM HYDRAULIC. ANALYSIS Page 7 _. _..._ ..
DATE: 4/22/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\1HD CALC.SDF
JOB TIT"
I
O O O O C m N O O
O
a w a a w N N a a w a m.
SPRI
KLER
RAULIC ANALYSIS
DATE: 4/22/2020, NEWPORT NBEACH\FIREMSPRIDNKLERS\CALLS\INITIAL\1HD CALC.geF
- -Page 8
JOB TITLE: '
WATER SUPPLY CURVE
72+
I
I
660\
I \
I \
I \
60+
I \
I \
I \
54+ \\
I \
I \
I \
P 48+ \
R X
E \
S \
S 42+ \
U \\
R
E
36+
( I \
P \\
S
I 30+ \
I \
I \\
24+ \
I \
I \
18+ x-20.0 psi @ 1500 gpm
Flow Test Point
I
12+ LEGEND
I „
X = Required Water Supply
147.20 psi @ 26.0 gpm
6+
0 = Available Water Supply
65.97 psi @ 26.0 gpm
I„
0++-+---+----+-----+------
400 600 800 1000 1200 +-----------+
1400 1600 1800 2000
FLOW (GPM)
RESIDENTIAL FIRE SYSTEMS, .INC.
8085 EAST CRYSTAL. DRIVE.
ANAHEIM, CA. 92807
HYDRAULIC CALCULATIONS
/ FOR
WEDGE HOUSE
SECOND FLOOR
2HD CALC AT LIVING ROOM
FILE NUMBER: 13460
DATE: MAY 27, 2020
-DESIGN DATA -
OCCUPANCY CLASSIFICATION: NFPA 13D, 2016 EDITION
DENSITY: 0.05 gpm/sq. ft.
AREA OF APPLICATION: 512.0 sq. ft.
COVERAGE PER SPRINKLER: 256.0 sq. £t. max.
NUMBER OF SPRINKLERS CALCULATED: 2 sprinklers
TOTAL SPRINKLER WATER FLOW REQUIRED: 26.4 qpm
TOTAL WATER REQUIRED (including hose): 31.4 gpm
FLOW AND PRESSURE (@ BOR): 26.4 qpm @ 32.6 psi
REQUIRED PRESSURE (@ SRC): 48.3 psi
SPRINKLER ORIFICE SIZE: 7/16 inch
NAME OF CONTRACTOR: RESIDENTIAL FIRE SYSTEMS, INC
DESIGN/LAYOUT BY: RUBI G.
AUTHORITY HAVING JURISDICTION: CITY OF NEWPORT BEACH
CONTRACTOR CERTIFICATION NUMBER: 786965
CALCULATIONS BY HASS COMPUTER PROGRAM ,
HRS SYSTEMS, INC.
AGGREGATE FLOW ANALYSIS:
TOTAL
FLOW AT SOURCE
SPRINKLER
SYSTEM
- __-DR
HYDRAULIC
ANALYSIS
Page 2
4
DATE:
5/27/2020, NEWPORT BEACH\FIRE
HOSE STREAM ALLOWANCES
SPRINKLERS\CALCS\INITIAL\2HD
CALC.SDF
JOB TITLE:
DISCHARGE FROM ACTIVE SPRINKLERS
26.4
GPM
20.0
K= 4.90
7.0
WATER
SUPPLY DATA
20.0
- - - -
7.9
- - -
3
SOURCE
STATIC
RESID.
FLOW
AVAIL.
TOTAL
REQ'D
NODE
PRESS.
PRESS.
@
PRESS.
@ DEMAND
PRESS.
TAG
(PSI)
(PSI)
(GPM)
(PSI)
(GPM)
(PSI)
SRC
66.0
20.0
1500.0
66.0
31.4
48.3
AGGREGATE FLOW ANALYSIS:
TOTAL
FLOW AT SOURCE
31.4
GPM
TOTAL
HOSE STREAM ALLOWANCE AT SOURCE
0.0
GPM
OTHER
HOSE STREAM ALLOWANCES
5.0
GPM
TOTAL
DISCHARGE FROM ACTIVE SPRINKLERS
26.4
GPM
NODE
ANALYSIS DATA
NODE
TAG ELEVATION
NODE TYPE
PRESSURE
DISCHARGE
(FT)
(PSI)
(GPM)
1
20.0
K= 4.90
7.0
13.0
2
20.0
- - - -
7.9
- - -
3
20.0
K= 4.90
7.4
13.4
4
20.0
- - - -
10.4
- - -
5
20.0
- - - -
15.7
- - -
6
20.0
- - - -
16.4
- - -
7
20.0
- - - -
16.7
- - -
8
20.0
- - - -
16.7
- - -
9
20.0
- - - -
18.3
- - -
10
10.0
- - - -
22.9
- - -
11
10.0
- - - - -
23.3
- - -
12
10.0
- - - -
23.0
- - -
13
10.0
- - - -
21.3
- - -
14
10.0
- - - -
21.1
- - -
TR
10.0
- - - -
24.2
- - -
FS
5.0
- - - -
26.8
- - -
FS1
5.0
- - - -
29.8
- - -
BR
2.0
- - - -
32.6
- - -
U1
2.0
HOSE STREAM
33.4
5.0
U2
-2.0
- - - -
35.3
- - -
U3
-3.0
- - - -
36.6
- - -
U4
-3.0
- - - -
40.6
- - -
SRC
-4.0
SOURCE.
48.3
31.4
SPRINKLER SYSTEM HYDRAULIC ANALYSIS page 3
,27/2020 NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL.\2HD, CALC.SDF
/fLE:
�'E DATA
/PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS.
END ELEV. NOZ. PT DISC. VEL(FPS)HW(C) (FT) SUM.
NODES (FT) (K) (PSI) (GPM) FL/FT (PSI)
Pipe: 1 -13.0 1.101 PL 13.00 PF 0.9
1 20.0 4.9 7.0 13.0 4.4 150 FTG 2F2E PE 0.0
2 20.0 0.0 7.9 0.0 0.031 TL 29.00 PV
Pipe: 2 13.4 1.101 PL 1.00 PF 0.5
2 '-20.0 0.0 7.9 0.0 4.5 150 FIG 2FET. PE 0.0
3 20.0 4.9 7.4 13..4. 0.032 TL 15.00 PV
Pipe: 3 -26.4 1.101 PL 13.08 PF 2.5
2 20.0 0.0 7.9 0.0 8.9 150 FTG 2FT2R PE 0.0
4 20.0 0.0 10.4 0.0 0.113 TL 22.08 PV
Pipe: 4 -26.4 1.101 PL 9.16 PF 5.2
4 20.0 0.0 10.4 0.0 8.9 150 FTG 2F5E PE 0.0
5 20.0 0.0 15.7 0,.0, 0.113. TL 46.16 PV
Pipe: 5 -9.1 1.101 PL 14.42 PF 0.7
5 20.0 0.0 15.7 0.0 3.1 150 FTG 2E3TR PE 0.0
6 20.0 0.0 16.4 0.0 0.016 TL 44.42 PV
Pipe: 6 -17.2 1.101 PL 15.25 PF 1.0
5 20.0 0.0 15.7 0.0 5.8 150 FTG 2F3R PE 0.0
7 20.0 0.0 16.7 0.0 0.052 TL 20.25 PV
Pipe: 7 0.0 1.101 PL 5.08 PF 0.0
7 20.0 0.0 16.7 0.0 0.0 150 FTG 2FET PE 0.0
8 20.0 0.0 16.7 0.0 0.000 TL 19.08 PV
Pipe: 8 -17.2 1.394 PL 30.50 PF 1.6
7 20.0 0.0 16.7 0.0 3.6 150 FTG 4F5E3TR PE 0.0
9 20.0 0.0 18.3 0.0 0.016 TL 97.50 PV
Pipe: 9 -17.2 1.394 PL 10.00 PF 0.3
9 20.0 0.0 18.3 0.0 3.6 150 FTG T PE 4.3
10 10.0 0.0 22.9 0.0 0.016 TL 16.00 PV
Pipe: 10 -17.2 1.394 PL 14.00 PF 0.4
10 10.0 0.0 22.9 0.0 3.6 150 FTG 2FTR PE 0.0
11 10.0 0.0 23.3 0.0 0.016 TL 25.00 PV
Pipe: li 9.1 .1.394 PL 23.50 PF 0.4
11 10.0 0.0 23.3 0.0 1.9 150 FTG 2F4E2TR PE 0.0
12 10.0 0.0 23.0 0.0 0.005 TL 72.50 PV
Pipe: 12 9.1 1.101 PL 45.00 PF 1.6
12 10.0 0.0 23.0 0.0 3.1 150 FTG 6F5E3TR PE 0.0
13 10.0 0.0 21.3 0.0 0.016 TL 102.00 PV
SPRINKLER SYSTEM HYDRAULIC ANALYSIS. Page 9.
DATE: 5/27/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\2HD CALC.SDF
JOB TITLE:
PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. \�
A
END ELEV. NOZ. PT DISC. VEL (FPS) SUM.
FL/FT (FT) (PSI) �
NODES (FT) (K) (PSI) (GPM) -- - -
Pipe: 13 9.1 1.101 PL 3.33 PF 0.2 �l
13 10.0 0.0 21.3 0.0 3.1 150 FTG ET PE 0.0 I
14 10.0 0.0 21.1 0.0 0.016 TL 15.33 PV )
Pipe: 14 9.1. 1.101 PL 10.00 PF 0.4
14 10.0 0.0 21.1 0.0 3.1 150 FTG 2E PE -4.3
6 20.0 0.0 16.4 0.0 0.016 TL 24.00 PV
Pipe: 16
-26.4 1.394 PL 9.66 PF 0.9
11 10.0 0.0 23.3 0.0 5.5 150 0.036 TL 24E 66 PV
TR RE 0.0
TR 10.0 0.0 24.2 0.0
Pipe: 100
-26.4 1.394 PL 5.00 PF 0.4
TR 10.0 0.0 29.2 0.0 5.5 150 FTG TR PE 2.2
FS 5.0 0.0 26.8 0.0 0.036 TL 12.00 PV
Pipe: 1.01 .FIXED PRESSURE LOSS DEVICE
FS1 5.0 0.0 29.8 0.0 3.0 psi, 26.4 gpm
FS 5.0 0.0 26.6 0.0
Pipe: 102 -26.4 1.101 PL 4.00 PF 1.5
FSI 5.0 0.0 29.6 0.0 8.9 150 0.119 TL RC PF 13.00 PV
1.3
BR 2.0 0.0 32.6 0.0
Pipe: 103
-26.4 1.055 PL 3.00 PF 0.8
gg 2.0 0.0 32.6 0.0 9.7 150 FTG E BE 0:0
U1 2.0 H.S. 33.4 5.0 0.140 TL 6.00 PV
Pipe: 104
-31.4 1.985 PL 4.00 PF 0.2
U1 2.0 H.S. 33.9 5.0 3.3 150 FTG ET PE 1.7
02 -2.0 0.0 35.3 0.0 0.009 TL 22.00 PV
Pipe: 105
-31.4 2.003 PL 63.75 PF 0.8
U2 -2.0 0.0 35.3 0.0 3.2 150 FTG 3E PE 0.4
U3 -3.0 0.0 36.6 0.0 0.008 TL 96.75 PV
Pipe: 106 FIXED PRESSURE LOSS DEVICE
U4 -3.0 0.0 40.6 0.0 4.0 psi, 31.4 gpm
U3 -3.0 0.0 36.6 0.0
Pipe: 107 -31.4 0.995 PL 8.25 PF 7.2
U4 -3.0 0.0 40.6 0.0 12.9 150 0.256 TL TX BE 28.25 PV 0.4
SRC -4.0 SRCE 48.3 (N/A)
_ SPRINKLER SYSTEM HYDRAULIC ANALYSIS
-2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\2HD CALC.SDF
,'(HASS)
•(1) Calculations were performed by the HASS 8.8 computer program
in accordance with NFPA13 (2016)
under license no. 38061304 granted by
HRS Systems, Inc.
208 Southside Square
Petersburg, TN 37144
(931) 659-9760
(2) The system has been calculated to providean average
imbalance at each node of 0.001 gp
um
imbalance at any node of 0.010gpm-
(3) Total pressure at each node is used in balancing the system.
Maximum water velocity is 12.9 ft/sec at pipe 107.
(4) Items listed in bold print on the cover sheet
are automatically transferred from the calculation report.
(5) Available pressure at source node SRC under full flow conditions is
65.95 psi with a flow of 38.83 gpm•
(6) PIPE FITTINGS TABLE
User Pipe Table Name: STANDARD.PIP
PAGE: F
MATERIAL: CPVC HWC: 150
Lengths
in Feet
Diameter
Equivalent Fitting
G
(in)
F E T R K
E1 Tee RunT Kplg
ChkVly
Gate
95
1.00 7.00 5.00 1.00 1.00
8.00
2.00
1.101
8.00 6.00 1.00 1.00
11.00
3.00
1.394
2.00
11.00 10.00 1.00 1.00
17.00
3.00
2.003
2.00
PAGE: K
MATERIAL: CT -K HWC: 150
Lengths
in Feet
Diameter
Equivalent Fitting
C
G
N X
(in)
E T F R K
45 -Ell TeeRun Kouplg
ChkVly GatVly
NPTee AngV v
Ell Tee
2.00 0.00 6.00
0.00
6.00 14.00
0.995
2.00 6.00 1.00
PAGE: L
MATERIAL: CT -L HWC: 150
Lengths
-in--Feet
Diameter
Equivalent Fitting
G
N
(in)
E T F R X
95-E11 TeeRun Kouplg
ChkVly
GatVly
N2Tee
E11 Tee
4.00 0.50
19.00
1.00
12.00
1.985
6.00 12.00 2.00
SPRINKLER SYSTEM HYDRAULIC ANALYSIS
DATE: 5/27/2020, NEWBEACH\FIRE SPRINKLERS\CALCS\INITIAL\2HD CALC.SDFPage 6
JOB TITLE:
PAGE: M MATERIAL: CT -M HWC: 150
Diameter Equivalent Fitting Lengths in Feet
(in) E T F R K C G
Ell Tee 45 -Ell TeeRun Koupig ChkVly GatVly NPTee
1.055 3.00 7.00 1.00 2.00 0.00 8.00 0.00 - 7.00
SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page
?0, NEWPORT. BEACH\FIRE SPRINKLERS\CALCS\INITIAL\2HD CALC.SDF7
o 0 o r
0 0 •
w C o 0 0 o m
M N ti O N
�a� �w wawm� maw am-�
- _-- Page 8 6
SPRINKLER SYSTEM HYDRAULIC ANALYSIS ---.
DATE: 5/27/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\2HD CALC.SDF - - --
JOB TITLE: - -
WATER SUPPLY CURVE
72+
I
I
I
660\ \
I \
I \
I \
60+ \\ -
I \
I \
I \
54+ \\
I \
I \
I \
P 48X \
R \\
E \
S \
S 42+ \
U \\
R \
E \
36+ \
( I \
P \\
S \
130+ \
I \
I \\
I \
24+ \
I \
* <-20.0 psi @ 1500 gpm
Flow Test Point
18+
I
12+ LEGEND
X = Required Water Supply -.- -----
48.26 psi @ 31.4 gpm -- --
6+
0 = Available Water Supply
65.96 psi @ 31.4 gpm
+------+--------+--------
+---------+-----------+
0++-+---+----+----- 2000
O(GPM)
400 600 800 1000 1200 F1400 1600 1800
RESIDENTIAL FIRE SYSTEMS, INC.
8085 EAST CRYSTAL DRIVE
ANAHEIM, CA. 92807
HYDRAULIC CALCULATIONS
FOR
WEDGE HOUSE
SECOND FLOOR
1HD CALC AT BEDROOM 2
FILE NUMBER: 13460
DATE: MAY 27, 2020
-DESIGN DATA -
OCCUPANCY CLASSIFICATION: NFPA 13D, 2016 EDITION
DENSITY: 0.05 gpm/sq. ft.
AREA OF APPLICATION: 400.0 sq. £t.
COVERAGE PER SPRINKLER: 400.0 -sq. £t. max.
NUMBER OF SPRINKLERS CALCULATED: 1 sprinklers
TOTAL SPRINKLER WATER FLOW REQUIRED: 21.0 gpm
TOTAL WATER REQUIRED (including hose): 26.0 gpm
FLOW AND PRESSURE (@ BOR): 21.0
gpm @ 39.2 psi
REQUIRED PRESSURE (@ SRC): 47.1 psi
SPRINKLER ORIFICE SIZE: 7/16 inch
NAME OF CONTRACTOR: RESIDENTIAL FIRE SYSTEMS, INC
DESIGN/LAYOUT BY: RUBI G.
AUTHORITY HAVING JURISDICTION: CITY OF NEWPORT BEACH
CONTRACTOR CERTIFICATION NUMBER: 786965
CALCULATIONS BY HASS COMPUTER PROGRAM ,
HRS SYSTEMS, INC.
-
DATE:..
SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2..
5./27/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\1HD CALC.SDF _.
JOB TITLE:
GPM
TOTAL
FLOW AT SOURCE
0.0
-
WATER
SUPPLY DATA
(FT)
OTHER
-
D.0
SOURCE STATIC
NODE PRESS.
TAG (PSI)
RESID.
PRESS.
(PSI)
FLOW
@
(GPM)
AVAIL.
PRESS -.-:.@.DEMAND
(PSI)
TOTAL
- (GPM)
PRESD.
(PSI)
SRC
66.0
20.0
1500.0
66.0
26.0
47.1
AGGREGATE FLOW ANALYSIS:
NODE
ANALYSIS DATA
26.0
GPM
TOTAL
FLOW AT SOURCE
0.0
GPM
TOTAL
HOSE STREAM ALLOWANCE AT SOURCE
(FT)
OTHER
HOSE STREAM ALLOWANCES
D.0
GPM
TOTAL
DISCHARGE FROM ACTIVE SPRINKLERS
21.0
GPM
NODE
ANALYSIS DATA
TYPE
PRESSURE
DISCHARGE
NODE
TAG ELEVATION
NODE
(PSI)
(GPM).
(FT)
1
20.0
- - - -
19.9
-
20.0
- - - -
19.9
- -
2
-
19.9
- - -
3
20.0
- - -
-
4
20.0
- - - -
19.9
- -
5
20.0
- - - -
19.9
- - -
-
6
20.0
- - - -
20.3
- -
7
20.0
- - - -
19.8
18.4
- - -
21.0
8
20.0
K= 4.90
9
20.0
- - - -
21.0
10
10.0
- - - -
25.5
- - -
11
10.0
- - - -
25.9
- - -
12
10.0
- - - -
25.7
- - -
13
10.0
- - - -
24.9
- - -
-
14
10.0
- - - -
24.8
- -
-
TR
10.0
- - - -
26.4
- -
FS
5.0
- - - -
28.9
- - -
FSI
5.0
- - - -
31.9
- - -
BR
2.0
- - - -
34.2
- - -
5.0
U1
2.0
HOSE STREAM
34.7
U2
-2.0
- - - -
36.6
- - -
U3
-3.0
- - - -
37.6
- - -
-3.0
- - - -
41.6
- - -
U4
SOURCE
47.1
26.0
SRC
-4.0
SPRINKLER. SYSTEM HYDRAULIC ANALYSIS Page
/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\lHD CALC.SDF3
dTA
iTAG
END Q(GPM) DIA(IN) LENGTH PRESS.
ELEV
NODES
M. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM.
(FT) (K) (PSI) (GPM)
FL/FT (PSI)
Pipe: 1 0.0 1.101 PL 13.00 PF 0.0
1 20.0 0.0 19.9 0.0 0.0 150 FTG 2F2E PE 0.0
2 20.0 0.0 19.9 0.0
0.000 TL 29.00 PV
Pipe: 2. 0.0 1.101 PL 1.00 PF 0.0
2 20:0 0.0 19.9 0.0 0.0 150 FTG 2FET HE 0.0
3.. 20.0 0.0 19.9 0.0
0.000 TL 15.00 -PV
2
Pipe: 3 0.0 1.101 PL 13.08 PF 0.0
20.0 0.0 19.9 0.0 0.0 150 FTG 2FT2R PE 0.0
4 20.0 0.0 19.9 0.0
0.000 TL 22.08 PV
4
Pipe: 4 0.0 1.101 PL 9.16 PF 0.0 5 20.0 0.0 19..9 0.0 0.0 150 FTG 2F5E PE 0.0
20.0 0.0 19.9 0.0
--.. ..0.000 TL .96,16 PV
Pipe: 5
5 -6.1 1.101 PL 14.42 PF 0.3
20.0 0.0 19.9 0.0 2.1 150 FTG 2E3TR PE 0.0
6 20.0 0.0 20.3 0.0
0.008 TL 49.42 PV
Pipe. 6 6.1 1.101 PL 15.25 PF 0.2
5 20.0 0.0 19.9 0.0 2.1
7 150 FTG 2F3R PE 0.0
20.0 0.0 19.8 0.0
0-.008 TL 20.25 PV
7
Pipe: 7 21.0 1.101 PL 5.08 PF 1.4
20.0 0.0 19.8 0.0 7.1
8 20.0 4.9 18.4 21.0 150 FTG 2FET HE 0.0
0.079 TL 19.0$ pV '
7
Pipe: 8 -14.9 1.394 PL 30.50 PF 1.2
20.0 0.0 19.8 0.0 3.1
9 150 FTG 9F5E3TR PE 0.0
20.0 0.0 21.0 0.0 0.013 TL 97.50 PV
Pipe: 9
9 -14.9 1.394 PL 10.00 PF 0.2
20.0 0.0 21.0 0.0 3.1 150 FTG
10 10.0 0.0 25.50.0 T PE 4.3
0.013 TL 16.00 PV
10
Pipe: 10 -14.9 1.394 PL 14.00 PF 0.3
10.0 0.0 25.5 0.0 3.1 150 FTG 2FTR PE 0.0
11 10.0 0.0 25.9 0.0
- 0.013 TL 25.00 PV
Pipe: 11
394 PL 23.50
11 10.0 0.0 25.9 0.0 1.3 1.150 FTG 2F4E2TRPFPE 0 0.0
12 10.0 0.0 25.7 0.0
0.002 TL 72.50 PV
12
Pipe: 12 6.1 1.101 PL 45.00 PF 10.0 0.0 25.7 0.8
0.0 2.1 150 FTG 6F5E3TR PE 0.0
13 10.0 0.0 24.9 0.0 0.008 TL 102.00 PV I
SPRINKLER SYSTEM HYDRAULIC ANALYSIS
Page -4-
DATE:
NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\1HD CALC.SDF _
-5/27 /2020, _
JOB TITLE: "
PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS
END ELEV. NOZ. PT DISC. VEL (FPS) FL/FT (FT) SUM(PSI).
NODES (FT) (K) (PSI) (GPM) -.
6.1 1.101 PL 3.33 PF 0.1-.
Pipe: 10.0 0.0 24.9 0.0 2.1 150 FTG ET PE 0.0
13
14 10.0 0.0 29.8 0.0 0.008 TL 15.33 PV
Pipe: 14 6.1 1.101 PL 10.00 PF 0.2
0 2150 2E pE
14 10.0 0.0 29.8 0..1; 0.008 TL G -9.3
24.00 PV
6 20.0 0.0 20.3 0.0
-21.0 1.394 PL 9.66 PF 0.6
Pipe: 16
11 10.0 0.0 25.9 0.0 4.4 0.024 TL 24E 66 PV 0.0
TR 10.0 0.0 26.4 0.0
-21.0 1.394 PL 5.00 PF 0.3
Pipe: 100
TR 10.0 0.0 26.4 0.0 4.4 150 0.024 TL 12.00 PV 2.2
FS 5.0 0.0 28.9 0.0
FIXED PRESSURE LOSS. DEVICE
Pipe: 101 - -
FBI
5.0 0.0 31.9 0.0 3.0 psi, 21.0 gpm
FS 5.0 0.0 28.9 0.0
Pipe: 102 -21.0`1 1.101 PL 4.00 PF 1.0
RC PE
FS1 -5.0 0.0 31.9 0.0 7 1 0.074 TL150 FTG 13.00 PV 1.3
BR 2.0 0.0 34.2 0.0
-21.0 1.055 PL 3.00 PF 0.5
Pipe: 103 FT
BR 2.0 0.0 34.2 0.0 7.7 0.0902 TLG 6.00 PV
U1 0•
2.0 H.S. 34.7 5.0
-26.0 1.985 PL 4.00 PF 0.1
Pipe: 104ET PE150
U1 2.0 H.S. 34.7 5.0 2.7 0.006 TL 22.00 PV 1.7
U2 -2.0 0.0 36.6 0.0
-26.0 2.003 PL 63.75 PF 0.6
Pipe: 1053E PE
U2 -2.0 0.0 36.6 0.0 2.6 150 0.006 TL 96.75 PV 0 4
U3 -3.0 0.0 37.6 0.0
Pipe: 106 FIXED PRESSURE LOSS DEVICE
U4
-3.0 0.0 41.6 0.0 4.0 psi, 26.0 gpm
U3 -3.0 0.0 37.6 0.0
Pipe: 107 -26.0 0.995 PL 8.25 PF 5.1
TX PE
-- U4 -3.0 0.0 41.6 0.0 10.7 0.1801 FI 28.25 PV 0.4
SRC -4.0 SRCE 47.1 (N/A)
Page
SPRINKLER SYSTEM HYDRAULIC ANALYSIS -
2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\lHD CALC.SDF
,LkASS) :
Calculations were performed by the HASS 8.8 computer program
in accordance with NFPA13 (201
under license no. 38061304 Igranted by
Inc. HRS Systems,
208 Southside Square
Petersburg, TN 37144
(931) 659-9760
(2) The system has been calculated. to provide an average
imbalance at each node of 0.001 gpm and amaximum
imbalance at any node of 0.012,: 'gPm•
(3) Total pressure at each node is used in balancing the system.
Maximum water velocity is 10.7 ft/sec at pipe 107.
(4) Items listed in bold print on the cover sheet
are automatically transferred from the calculation report.
(5) Available pressure at source node SRC under full flow conditions is
65.96 psi with a flow of 32.25 gpm.
(6) PIPE FITTINGS TABLE
User Pipe Table Name: STANDARD.PIP
PAGE: F MATERIAL: CPVC HWC: 150Lengths in Feet
Diameter Equivalent Fitting K C G
F E T R
(in) El Tee RunT Kplg ChkV1v Gate
45
1..00 5.00 1.00 1.00 8.00 2.0
00 7
1.101 6.00 1.00 1.00 11.00 3.00
1.394 2.00 8.00
2.003 2.00 11.00 10.00 1.00 1.00 17.00 3.00
PAGE: K MATERIAL: CT -K HWC: 150
Equivalent Fitting Lengths in Feet N X
Diameter R K C G
E T F
(in) ChkVly GatV 1v NPTee AngV v
Ell Tee 45 -Ell TeeRun Kouplg 6.00 0.00 6.00 14.00
0.995 2.00 6.00 1.00 2.00 0.00
PAGE: L MATERIAL: CT -L
HWC: 150
Diameter Equivalent Fitting LengKhs in Feet G N
T F R
(in) E Tee 45 -Ell TeeRun Kouplg ChkVjv 14.0 GatVly NPTee
E11
1.985 6.00 12.00 2.00 4.00 0.50 14.00 1.00 12.00
SPRINKLER_SYSTEM HYDRAULIC ANALYSIS
DATE: 5/27/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\1HD CALC.age SDFB
JOB TITLE:
PAGE: M MATERIAL: CT -M HWC: 150
Diameter Equivalent Fittin
(in) E T F g Lengths in Feet -
Ell R K C G
Tee 45 -Ell, TeeRun Kouplg ChkVly GatVly N
1.055 3.00 7.00 1.00 2.00
NP
0.00 .8.00 0.00 7.00
SPRINKLER SYSTEM HYDRAULIC ANALYSIS_
-/27/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL.\1HD CALPaSDF7
TLE:
I
o 0 0
0 0 o r
M N H O N
��Cacvw w �
SPRINKLER SYSTEM HYDRAULIC ANALYSIS-
Page - 8 -
DATE: 5/27/2020, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\INITIAL\1HD CALC.SDF
JOB TITLE:
WATER SUPPLY CURVE
72+
I
I
I
660\
I \
I \
I \
60+ \\
I \
I \
I \
54+ \\
I \
I \
I \
P 48+ \
R % \\
E \
S \
S 42+ \
U \\
R I \
E I \
36+ \
( I \
P \\
S \
I 30+ \
I \
I \
I \
24+ \
I \
I * <-20.0 Psi @ 1500 gpm
I Flow Test Point
18+
I
I
12+ LEGEND
I
g = Required Water Supply -_-
I
47.13 psi @ 26.0 4Pm -
6+ „
0 = Available Water Supply _
65.97 psi @ 26.0 gpm
+---------+-----------+
O 1
0++-+---+----+-----
+-- +--------+------600 1800 2000
400 600 800 1000 1200 FLOW (GPM)16
RESIDENTIAL FIRE SYSTEMS, INC.
8085 EAST CRYSTAL DRIVE
ANAHEIM, CA. 92807
HYDRAULIC CALCULATIONS
FOR
WEDGE HOUSE
SECOND FLOOR
2HD CALC AT LIVING ROOM
FILE NUMBER: 13460
DATE: JAN 21, 2021
-DESIGN DATA -
OCCUPANCY CLASSIFICATION:
NFPA 13D, 2016 EDITION
0.05 qpm/sq.ft..
DENSITY:
AREA OF APPLICATION:
512.0 sq. ft.
COVERAGE PER SPRINKLER:
256.0 sq. £t. max.
NUMBER OF SPRINKLERS CALCULATED:
2 sprinklers
TOTAL SPRINKLER WATER FLOW REQUIRED:
26.4 gpm
TOTAL WATER REQUIRED (including hose):
31.4 gpm
FLOW AND PRESSURE (@ BOR):
26.4 gpm @ 32.6 psi
REQUIRED PRESSURE (@ SRC):
50.0 psi
SPRINKLER ORIFICE SIZE:
7/16 inch
NAME OF CONTRACTOR: RESIDENTIAL FIRE SYSTEMS,
INC
DESIGN/LAYOUT BY: RUBI G.
AUTHORITY HAVING JURISDICTION: CITY OF
NEWPORT BEACH
CONTRACTOR CERTIFICATION NUMBER: 786965
CALCULATIONS BY HASS COMPUTER PROGRAM ,
HRS SYSTEMS, INC.
`kv`k -0101
SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2
DATE: 1/21/2021, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\DELTA 3\2HD CALC.SDF
JOB TITLE:
WATER SUPPLY DATA
SOURCE STATIC RESID. FLOW AVAIL. TOTAL REQ'D
NODE PRESS. PRESS. @ PRESS. @ DEMAND PRESS.
TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI)
SRC 66.0 20.0 1500.0 66.0 31.4 50.0
AGGREGATE FLOW ANALYSIS:
TOTAL
FLOW AT SOURCE
31.4
GPM
TOTAL
HOSE STREAM ALLOWANCE AT SOURCE
0.0
GPM
OTHER
HOSE STREAM ALLOWANCES
5.0
GPM
TOTAL
DISCHARGE FROM ACTIVE SPRINKLERS
26.4
GPM
NODE
ANALYSIS DATA
NODE
TAG ELEVATION
NODE TYPE
PRESSURE
DISCHARGE
(FT)
(PSI)
(GPM)
1
20.0
K= 4.90
7.0
13.0
2
20.0
- - - -
7.9
- - -
3
20.0
K= 4.90
7.4
13.4
4
20.0
- - - -
10.4
- - -
5
20.0
- - - -
15.7
- - -
6
20.0
- - - -
16.4
- - -
7
20.0
- - - -
16.7
- - -
8
20.0
- - - -
16.7
- - -
9
20.0
- - - -
18.3
- - -
10
10.0
- - - -
22.9
- - -
11
10.0
- - - -
23.3
- - -
11A
10.0
- - - -
23.3
- - -
11B
10.0
- - - -
23.3
- - -
11C
10.0
- - - -
23.3
- - -
11D
10.0
- - - -
23.3
- - -
12
10.0
- - - -
22.9
- - -
13
10.0
- - - -
21.3
- - -
14
10.0
- - - -
21.1
- - -
TR
10.0
- - - -
24.2
- - -
FS
5.0
- - - -
26.8
- - -
FSl
5.0
-
- - -
29.8
- - -
BR
2.0
- - - -
32.6
- - -
U1
2.0
HOSE STREAM
34.6
5.0
U2
-2.0
- - - -
36.9
- - -
U3
-3.0
- - - -
38.3
- - -
U4
-3.0
- - - -
42.3
- - -
SRC
-4.0
SOURCE
50.0
31.4
SPRINKLER SYSTEM HYDRAULIC ANALYSIS
Page 3
DATE: 1/21/2021, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\DELTA 3\2HD CALC.SDF
JOB TITLE:
PIPE DATA
PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS.
END ELEV. NOZ. PT DISC. VEL (FPS) FW�SUM.
(FT)
NODES (FT) (K) (PSI) (GPM) FT (PSI)
-13.0 1.101 PL 13.00 PF 0.9
Pipe: 1
1 20.0 4.9 7.0 13.0 4.4 0.030 G 0.0
TL29.00 PV
2 20.0 0.0 7.9 0.0
13-.4 1.101 PL 1.00 PF 0.5
Pipe: 20.0 0.0 7.9 0.0 9.5 150 FTG 2FET PE 0.0
20.032 TL 15.00 PV
3 20.0 4.9 7.4 13.4
-26.4 1.101 PL 13.08 PF 2.5
Pipe: 20.0 0.0 7.9 0.0 8.9 150 FTG 2FT2R PE 0.0
2 0.113 TL 22.08 PV
q 20.0 0.0 10.4 0.0
-26.4 1.101 PL 9.16 PF 5.2
Pipe: 20.0 0.0 10.4 0.0 8.9 150 FTG 215E PE 0.0
4
5 20.0 0.0 15.7 0.0 0.113 TL 46.16 PV
-9.1 1.101 PL 14.42 PF 0.7
Pipe: 20 0 0.0 15.7 0.0 3.1 150 FTG 2E3TR PE 0.0
5
6 20.0 0.0 16.9 0.0 0.016 TL 44.42 PV
-17.3 1.101 PL 15.25 PF 1.1
Pipe: 20.0 0.0 15.7 0.0 5.8 150 FTG 2F3R PE
7 20.0 0.0 16.7 0.0 0.0
5 0.052 TL 20.25 PV
Pipe: 7 0.0 1.101 PL 5.08 PF 0.0
ET PE
7 20.0 0.0 16.7 0.0 0.0 150 0.000 TL 19.08 PV 0.0
8 20.0 0.0 16.7 0.0
Pipe: 8 -17.3 1.394 PL 30.50 PF 1.6
7 20.0 0.0 16.7 0.0 3.6 150 0.016 TL 97550TRPVPE
0.0
9 20.0 0.0 18.3 0.0
-17.3 1.394 PL 10.00 PF 0.3
Pipe: 9
9 20.0 0.0 18.3 0.0 3.6 150 0.016 TL 16.00 PV 4 3
10 10.0 0.0 22.9 0.0
-17.3 1.394 PL 14.00 PF 0.4
Pipe: 10
10 10.0 0.0 22.9 0.0 3.6 150 0.016 TL 25.00 PV 0.0
11 10.0 0.0 23.3 0.0
Pipe: 11 9.1 1.394 PL 3.25 PF 0.0
11 10.0 0.0 23.3 0.0 1'9 15 0.000 TL T PE 9.25 PV 0.0
11A 10.0 0.0 23.3 0.0
0.0 1.101 PL 14.00 PF 0.0
Pipe: 11A
11A 10.0 0.0 23.3 0.0 0.0 150 0.000 TL 22.00 PV 0.0
1lB 10.0 0.0 23.3 0.0
SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page
DATE: 1/21/2021, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\DELTA 3\2HD CALC.SDF4
JOB TITLE:
PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS.
END ELEV. NOZ. PT DISC. VEL(FPS) HW(C)
NODES (FT) (K) (PSI) (GPM) FL/FT (FT) SUM.
(PSI)
Pipe: 11B 0.0 1.101 PL 1.00 PF 0.0
11B 10.0 0.0 23.3 0.0 0.0 150 FTG ET PE 0.0
11C 10.0 0.0 23.3 0.0 0.000 TL 13.00 PV
Pipe: 11C 0.0 1.101 PL 10.42 PF 0.0
11B 10.0 0.0 23.3 0.0 0.0 150 FTG ETR PE 0.0
11D 10.0 0.0 23.3 0.0
0.000 TL 23.42 PV
Pipe: 12 9.1 1.394 PL 19.33 PF 0.3
11A 10.0 0.0 23.3 0.0 1.9 150 FTG 2F4E2TR PE 0.0
12 10.0 0.0 22.9 0.0
0.005 TL 68.33 PV
Pipe: 13 9.1 1.101 PL 45.00 PF 1.6
12 10.0 0.0 22.9 0.0 3.1 150 FTG 6F5E3TR PE 0.0
13 10.0 0.0 21.3 0.0
0.016 TL 102.00 PV
Pipe: 19
9.1 1.101 PL 3.33 PF 0,2
13 10.0 0.0 21.3 0.0 3.1 150 FTG ET PE 0.0
14 10.0 0.0 21.1 0.0 0.016 TL 15.33 PV
Pipe: 15 9.1 1.101 PL 10.00 PF 0.4
14 10.0 0.0 21.1 0.0 3.1 150 FTG 2E PE -4.3
6 20.0 0.0 16.4 0.0
0.016 TL 29.00 PV
11
Pipe: 16
-26.4 1.399 PL 9.66 PF 0.9
10.0 0.0 23.3 0.0 5.5 150 FTG ETR PE 0.0
TR 10.0 0.0 24.2 0.0 0.036 TL 24.66 PV
TR
Pipe: 100
-26.9 1.399 PL 5.00 PF 0.9
10.0 0.0 24.2 0.0 5.5 150 FTG TR PE 2.2
FS 5.0 0.0 26.8 0.0 0.036 TL 12.00 PV
Pipe: 101 FIXED PRESSURE LOSS DEVICE
FSI 5.0 0.0 29.8 0.0
FS 5.0 0.0 26.8 0.0 3.0 psi; 26.9 gpm
FS1
Pipe: 102 -26.4 1.101 PL 4.00 PF 1.5
5.0 0.0 29.8 0.0 8.9
BR 150 FTG RC PE 1.3
2.0 0.0 32.6 0.0 0.113 TL 13.00 PV
Pipe: 103
BR -26.4 1.527 PL 52.00 PF 2.0
2.0 0.0 32.6 0.0 4.6 150 FTG 7E PE 0.0
U1 2.0 H.S. 34.6 5.0 0.023 TL 87.00 PV
Pipe: 104
U1 -31.4 1.505 PL 9.00 PF 0.6
2.0 H.S. 34.6 5.0 5.7 150 FTG ET PE 1.7
U2 -2.0 0.0 36.9 0.0 0.034 TL 17.00 PV
Pipe: 105
U2 -31.9 2.003 PL 85.25 PF 1.0
-2.0 0.0 36.9 0.0 3.2 150 FTG 3E PE 0.4
U3 -3.0 0.0 38.3 0.0 0.008 TL 118.25 PV
SPRINKLER SYSTEM HYDRAULIC ANALYSIS
Page 5
DATE: 1/21/2021, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\DELTA 3\2HD CALC.SDF
JOB TITLE:
Q(GPM) DIA(IN) LENGTH PRESS.
PIPE TAG SUM.
END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) (PSI)
NODES (FT) (K) (PSI) (GPM)
FIXED PRESSURE LOSS DEVICE
Pipe: 106 4.0 psi, 31.4 9Pm
04 -3.0 0.0 42.3 0.0
U3 -3.0 0.0 38.3 0.0
-31.4 0.995 PL 8.25 PE 7.2
Pipe: 107 TX PE 0. 150 FTG
U4 -3.0 0.0 42.3 0.0 12.9 0.256 TL 28.25 PV
SRC -4.0 SRCE 50.0 (N/A)
NOTES (HASS) :
(1) Calculations were performed by the HASS 8.8 D computer program
in accordance with NFPA13 (2019)
under license n. Systems, 3,Ir
61304granted by
HRS
208 Southside Square
Petersburg, TN 37144
(931) 659-9760
(2) The system has been calculated to providean average
imbalance at each node of 0.002 gP
imum
imbalance at any node of 0.055 gpm•
(3) Total pressure at each node is used in balancing the system.
Maximum water velocity is 12.9 ft/sec at pipe 107-
(4) Items listed in bold print On the cover sheet
are automatically transferred from the calculation report.
(5) Available pressure at source node SRC under full flow conditions is
65.95 psi with a flow of 37.84 gpm•
(6) PIPE FITTINGS TABLE
User Pipe Table Name: STANDARD.PIP
PAGE: F MATERIAL: CPVC HWC: 150
Diameter Equivalent Fitting LeF 45 E1 Tee RunE T R T ng KpKlg hs in Feet
Diameter
G
(in) ChkVly Gate
1.101 1.00 7.00 5.00 1.00 1.00 8.00 2.00
1.394 2.00 8.00 6.00 1.00 1.00 11.00 3.00.
2.003 2.00 11.00 10.00 1.00 1.00 17.00 3.00
KLER
EYDRAULIC ANALYSIS
DATE: 1/21/2021, NEWPORTNBEACH\FIREM
JOB TITLE:
SPRINKLERS\CALCS\DELTA
3\2HD
Page 6
CALC.SDF
PAGE: K
MATERIAL: CT-K HWC: 150
Diameter
Equivalent Fitting Lengths in
(in)
E T F Feet
0.995
R
Eli Tee 45-Ell TeeRun KOuPlg ChkVly GatVly
2.00
6.00 1.00 2.00 0.00
NPTee
AngVly
6.00 0.00
6.00
14.00
PAGE: L
MATERIAL: CT-L HWC: 150
Diameter
Equivalent Fitting Len
4 in
(in)
(
E T gths Feet
F
1.505
R K C
Eli Tee 45-Ell TeeRun KOuPlg ChkVly GatVly
4.00 9.00
NPTee
2.00 3.00 0.50 10.00 0.00
9.00
PAGE: M
MATERIAL: CT-M HWC: 150
Diameter
Equivalent Fitting Lengths in
(in)
E T F Feet
1.527
R K C G
Ell Tee 45-Ell TeeRun KOuPlg ChkVly GatVly
5.00 9.00
N
NPTee
2.00 3.00 0.50 11.00 0.00
9.00
SPRINKLER SYSTEM HYDRAULIC ANALYSIS
Page 7
DATE: 1/21/2021, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\DELTA 3\2HD CALC.SDF
JOB TIT
E
P.
0
0
0
P
9a0w
04 x w N m z x w 04
r{ N
HYDRAULIC ANALYSIS
DATE: 1/21/2021, NEWPORT SPRINKLER SYSTEM
Page 8
MSPRIINKLERS\CALLS\DELTA 3\2HD CALC.SDF
JOB TITLE:
WATER SUPPLY CURVE
72+
I
I
I
660\
I \
I \
I \
60+
I \
I \
I \
54+
I \
x
P 48+
R
E \
S
S 42+
U \\
R
E
36+
P
S
I 30+ \
I \
I \
I \\
24+
I \
I \
I \
18+ * <-20.0 psi @ 1500 gpm
I Flow Test Point
I
12+ LEGEND
I
I X = Required Water Supply IT
50.01 psi @ 31.4 gpm
6+
0 = Available Water Supply
I 65.96 psi @ 31.4 qpm IT
11
0++-+---+----+-----+------ + ___
400 600 800 1000 1200
1400 1600 1800
FLOW (GPM) 2000
RESIDENTIAL FIRE SYSTEMS, INC.
8085 EAST CRYSTAL DRIVE
ANAHEIM, CA. 92807
HYDRAULIC CALCULATIONS
FOR
WEDGE HOUSE
SECOND FLOOR
1HD CALC AT BEDROOM 2
FILE NUMBER: 13460
DATE: JAN 21, 2021
-DESIGN DATA -
OCCUPANCY CLASSIFICATION:
NFPA 13D, 2016 EDITION
0.05 gpm/sq. ft.
DENSITY:
400.0 sq. ft.
AREA OF APPLICATION:
COVERAGE PER SPRINKLER:
900.0 sq. ft. max.
NUMBER OF SPRINKLERS CALCULATED:
1 sprinklers
TOTAL SPRINKLER WATER FLOW REQUIRED: 21.0 gpm
TOTAL WATER REQUIRED (including hose): 26.0 gpm
FLOW AND PRESSURE (@ BOR):
21.0 gpm @ 34.2 psi
REQUIRED PRESSURE (@ SRC):
98.3 psi
SPRINKLER ORIFICE SIZE:
7/16 inch
NAME OF CONTRACTOR: RESIDENTIAL FIRE SYSTEMS, INC
DESIGN/LAYOUT BY: RUBS G.
AUTHORITY HAVING JURISDICTION: CITY OF NEWPORT BEACH
CONTRACTOR CERTIFICATION NUMBER: 786965
CALCULATIONS BY HASSCOMPUTER
TEMSROGRRAAM
H ,
HYRAULIC ANALYSIS
DATE: 1/21/2021, NEWPORT SPRINKLER SYSTEM
MSPRDPage 2
NKLERS\CALCS\DELTA 3\1HD CALC.SDF
JOB TITLE:
WATER SUPPLY DATA
SOURCE STATIC RESID. FLOW AVAIL.
NODE PRESS. PRESS. @ TOTAL REQ'D
TAG (PSI)PRESS. @ DEMAND PRESS.
(PSI) (GPM) (PSI) (GPM) (PSI)
SRC 66.0 20.0 1500.0
66.0 26.0 98.3
AGGREGATE FLOW ANALYSIS:
TOTAL FLOW AT SOURCE
TOTAL HOSE STREAM ALLOWANCE AT SOURCE 26.0 GPM
OTHER HOSE STREAM ALLOWANCES 5.0 GPM
0.0 GPM
TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 21.0 GPM
NODE
ANALYSIS DATA
NODE
TAG ELEVATION
NODE TYPE
(FT)
PRESSURE
DISCHARGE
(PSI)
(GPM)
1
20.0
-
2
20.0
- _ -
19.9
_ _ -
3
20.0
_ - - -
19.9
_ - -
4
20.0
- - -
19.9
_ - -
5
20.0
- - -
19.9
_ - -
6
20.0
- - -
19.9
_ _ _
7
20.0
- - -
20.3
_ _ -
8
20.0
- - -
19.8
_ _ -
9
20.0
K= 4.90
18.4
21.0
10
10.0
- - - -
-
21.0
- - -
11
10.0
- - -
-
25.5
- - -
11A
10.0
- - -
25.9
_ _ -
11B
10.0
_ - - -
25.8
- _ -
11C
10.0
- - -
25.8
_ _ -
11D
10.0
- - -
25.8
_ _ -
12
10.0
-- -
25.8
_ - -
13
10.0
- - -
25.7
_ _ _
1410.0
- - -
24.9
_ - -
TR
10.0
- - -
24.8
_ - -
FS
5.0
- - -
26.4
- - -
FSI
5.0
- _ _
_
28.9
_ - -
BR
2.0
- - -
31.9
- - -
U1
2.0-
- -
34.2
- - -
U2
-2.0
HOSE STREAM
355
.
5.0
U3
-3.0
_ - - -
37.6
- - -
U4
-3.0
- - -
38.8
- - -
SRC_4.0
SOURCE
42.8
_ _ _
48.3
26.0
SPRINKLER SYSTEM HYDRAULIC ANALYSIS
Page 3
DATE: 1/21/2021, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\DELTA 3\1HD CALC.SDF
JOB TITLE:
PIPE DATA LENGTH PRESS.
Q(GPM) DSA (IN) (FT) SUM.
PIPE TAG DISC. VEL(FPS) HW(C) (SSI)
END ELEV. NOZ. PT (PSI) (GPM) FL/FT
NODES (FT) (K) 13.00 PF 0.0
0,0 1.101 PL 2F2E PE 0.0
Pipe: 1 19.9 0.0 0.0 150 FTG
1 20.0 0.0 0.000 TL 29.00 PV
20.0 0.0 19.9 0.0
0.0 2 2 150 FT 1.00 PF 0.0
.0 0.0 0.000 T1.101 PLL 2FET PE 0.0
2 20.0 0-0 0
Pipe: 19.9 15.00 PV
20.0 0.0 19.9
0.0
3 1
0.0 1.101 PL 3.08 PF 0.0
Pipe: 3
20.0 0.0 19.9 0.0 0.0 150 FTG 2FT2R PE 0.0
2 0.000 TL 22.08 PV
4
20.0 0.0 19.9 0.0
0.0 1.101 PL 9.16 PF 0.0
0,0
Pipe: 4 19 9 0.0 0.0 150 FTG 2F5E PE
q 20.0 0.0 0.000 TL 46.16 PV
20.0 0.0 19.9 0.0
5144
-6.1 1.101 PL .2 PF 0.3
0,0
pipe: 5 .9 0.0 2.1 150 FTG 2E3TR PE
5 20.0 0.0 19 0.008 TL 44.42 PV
20.0 0.0 20.3 0.0
6 21 1.101 PL 150 FTG 15.25 PF 0.2
Pipe: 6
0.0 .2F3R PE 0.0
5
20.0 0.0 19.9 0.008 TL 20.25 PV 7 20.0 0.0 lg,g 0.0 1.4
21.0 1.101 PL 5.08 PF
Pipe: 7 7.1
19.8 150 FTG 19F08 PE PV
7
0.0 0.
20.0 0.0 0.074 TL
20.0 4.9 18.4 21.0
8
-14.9 1.394 PL 30.50 PF 1.2
Pipe:
8 0 0 3 1 150 FTG 97.50 R PE 0.0
7 20.0 0.0 19.8 0,013 TL 97.50 PV
20.0 0.0 21.0 0.0
9 0 PF 0.2
-19.9 1.394 PL 10.0T PE 4-3
Pipe: 9 0 0 0 3.1 150 FTG
9 20.0 0.0 21 0.013 TL 16.00 PV
10.0 0.0 25.5 0.0
10 1q.00 PF 0.3
0.0 1 3.9 4. 1.394 PL 2FTR PE 0.0
10
pipe: 10 150 FTG
10.0 0.0 25.5 0.013 TL 25.00 PV
9 0.0
11 10.0 0.0 25. 0.0
6.1 1.394 PL 3.25 PF
1.
11 0.0 150 FTG T PE 0.0
Pipe: 25.9 9.25 PV
11 10.0 0.0 0.0 0.002 TL
11A 10.0 0.0 25.8
1.101 PL 14.00 PF 0.0
0.0
pipe: 11A 0 0 0.0 150 FTG
11A 25•8 0.0 2FTR PE 0.0
10.0 0.0 25.8 0.000 TL 22.00 PV
11B 10.0 0.0
DATE: 1/21/2021, NEWPORT SPRINKLER SYSTEM
MSPRIDNKLERS\CALCS\DELTA 3\lHD CALC.SDF
JOB TITLE: RAULIC ANALYSIS Page 4
PIPE TAG
END ELEV. NOZ.PQ(GPM) DIA(IN) LENGTH PRESS.
(FT)
NODES S DISC. VEL(FPS) HW(C)
(K) (PSI) (GPM) (FT) SUM.
Pipe: 11B FL/FT (PSI)
11B 10.0 0.025 0.0 1.101 PL 1.00 PF 0.0
11C .8 0.0 00
10.0 0.0 25.8 0.0 . 150 FTG ET PE 0.0
Pipe: 11C 0.000 TL 13.00 pV
11B 10.0 0.00.0 1.101 PL 10.42 PF
25
11D 10 '8 0.0 0.0 150 0.0
.0 0.0 25.8 0.0 FTG ETR PE 0.0
0.000 TL 23.42 PV
Pipe: 12
11A 10.0 0.025.8 1.3 6.1 1.394 PL 19.33 PF
12 10.0 0.0 25.7 0.0 150 FTG 2F4E2TR PE 0 0.0
0.002 TL 68.33 PV
Pipe: 13
12 10.0 0.0 25.7 6.1 1.101 PL 45.00 PF
13 0.0 2.1 150 FTG 0.8
10.0 0•p 29 9 0 0 6FSE3TR PE 0.0
0.008 TL 102.00 PV
Pipe: 19
13 10.0 0.0 24.9 . 6.1 1.101 PL 3.33 PF
14 0.1
10.0 0.0 24.8 �:O 21 150 FTG ET PE 0.0
Pipe: 15
0.008 TL 15.33 PV
14 10.0 0.0 24.8 6'1 1.101 PL 10.00 PF
6 20.0 0.0 2.1 0.2
0.0 150 FTG 2E PE 20.3 0.0 -4.3
0.008 TL 24.00 pV
Pipe: 16
-21.0 1.394 PL 9.66 PF
11 10.0 0,0 25
0.6
TR 10.0 0.0 26.9 �:O 4.4 150 FTG ETR PE 0.0
Pipe: 100
0.024 TL 24.66 PV
-21.0 1.394 PL 5.00 PF
TR 10.0 0•0
FS 26.9 0.0 9.4 150 FTG 0.3
Pipe: 101 ,
5.0 0.0 28.9 p0 TR PE 2.2
0.024 TL 12.00 PV
FS1 5.0 0.0 31.9 FIXED PRESSURE LOSS DEVICE
FS 5.0 0.0 28.9 0.0 3.0 psi. 21.0 qpm
Pipe: 102
FS1 5.0 0.0 31.9 -21.0 1.101 PL
BR 9.00 PF 1.0
2.0 0.0 00 7'1 150 FTG RC PE
39.2 0.0 1.3
0.074 TL
Pipe: 103 13.00 pV
BR 2.0 0.0 -21.0 1.527 PL 52.00 PF
U1 34'2 0.0 3.7 150 FTG 1.3
2.0 H.S. 35.5 5.0 7E PE 0.0
0.015 TL 87.00 pV
Pipe: 104
Ul 2.0 H.S. 35.5 -26.0 1.505 PL 9.00 PF 0.4
U2 -2.0 0.0 37.6 5.0 4.7 150 FTG ET PE 1.7
Pipe: 105 0.024 TL 17.00 PV
U2 -2.0 0.0 -26.0 2.003 PL 85.25 PF
37.6 0.7
U3 -3.0 0.0 38.8 0.0 2 6 150 FTG 3E PE 0.4
0.006 TL 118.25 pV
SPRINKLER SYSTEM HYDRAULIC ANALYSIS
Page 5
DATE: 1/21/20211 NEWPORT BEACH\FIRE SPRINKLERS\CALCS\DELTA 3\1HD CALC.SDF
JOB TITLE:
Q(GPM) DIA(IN) LENGTH PRESS.
PIPE TAG SUM.
END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) (PSI)
NODES (FT) (K) (PSI) (GPM)
FIXED PRESSURE LOSS DEVICE
Pipe: 106 4.0 psi, 26.0 9P
U4 -3.0 0.0 42.8 0.0 m
U3 -3.0 0.0 38.8 0.0
-26.0 0.995 PL 8.25 PF 5.1
Pipe: 107 TX RE
U4 -3.0 0.0 42.8 0.0 10.7 0.1801 TL 0•
28.25 PV
SRC -4.0 SRCE 48.3 (N/A)
NOTES (HASS):
(1) Calculations were performed by the HASS 8.8 D computer program
in accordance with NFPA13 (2019)
under license no. 38061304 granted by
HRS Systems, Inc.
208 Southside Square
Petersburg, TN 37144
(931) 659-9760
(2) The system has been calculated to providean average
um
imbalance at each node
o ff 00.001gpm.
imbalance at any node
(3) Total pressure at each node is used in balancing the system.
Maximum water velocity is 10.7 £t/sec at pipe 107.
(4) Items listed in bold print on the cover sheet
are automatically transferred from the calculation report.
(s) Available pressure at source node SRC under full flow conditions is
65.96 psi with a flow of 31.71 gpm-
(6) PIPE FITTINGS TABLE
User Pipe Table Name: STANDARD.PIP
PAGE: F MATERIAL: CPVC HWC: 150
Diameter Equivalent Fitting Lengths in Feet G
F F T R
(in) ChkVly Gate
45 E1 Tee RunT Kp100 8.00 2.00
1.101 1.00 7.00 5.00 1.00 1.00 11.00 3.00
1.394 2.00 8.00 6.00 1.00
2.003 2.00 11.00 10.00 1.00 1.00 17.00 3.00
DATE: 1/21/2021, NEWPORT SPRINKLER RAULIC
ANALYSIS
JOB TITLE:
BEACH\FIREMSPRIDNKLERS\CALCS\DELTA
Page 6
3\1HD
CALC.SDF
PAGE: K
MATERIAL: CT-K HWC: 150
Diameter
Equivalent Fitting Lengths in
Feet
0.995
F R K C
Ell Tee 45-Ell TeeRun Kou 1 GVjv
2.00 p Chk6.0 Gat0.0
N X
6.00 1.00 2. 00 0.00
0
NPTee An14.0
6.00 0.00
6.00 14.00
PAGE: L
MATERIAL: CT-L HWC: 150
Diameter
Equivalent Fitting Lengths in
(in)
E T F Feet
1.505
R K
Ell Tee 45-Ell TeeRun Kouplg ChkVly GatVly
4.00
NPTee
9.00 2.00 3.00 0.50 10.00 0.00
9.00
PAGE: M
MATERIAL: CT-M HWC: 150
Diameter
Equivalent Fitting Lengths in
(in)
E T F Feet
1.527
R K C G
Ell Tee 45-Ell TeeRun Kouplg ChkVly GatVly
5.00
N
NPTee
9.00 2.00 3.00 0.50 11.00 0.00
9.00
SPRINKLER SYSTEM HYDRAOLIC ANALYSIS
Page 7
DATE: 1/21/2021, NEWPORT BEACH\FIRE SPRINKLERS\CALCS\DELTA 3\1HD CALC.SDF
JOB TIT
M7
C7 rC P c7 W
a PZ W w m P a W
HYD
ULIC ANALYSIS
KLER
DATE: 1/21/2021, NEWPORTNBEACH\FIRE MSPRINKPage
LERS\CALCS\DELTA 3\1HD CALC.SDF
8
JOB TITLE:
WATER SUPPLY CURVE
72+
I
I
I
660\
I \
I \
I \
60+
I \
I \
I \
54+ \\
I \
I \
I \
P 48X
R \\
E
S
5 42+ \
U
R \
E
36+
( I \
P
S
1 30+
I \
I \
I \
24+
I \
I \
I \
18+ 1-20.0 psi @ 1500 4em
Flow Test Point
I
12+ LEGEND
1p
X = Required Water Supply
I 48.30 psi @ 26.0 qpm
6+
I 0 = Available Water Supply
I 65.97 psi @ 26.0 gpm
I
0++-+---+----+----+------
+------+------
400 600 800 1000 1200 +-----_---+-----------+
1400 1600 1800
FLOW (GPM) 2000
RESIDENTIAL FIRE SYSTEMS, INC.
8085 EAST CRYSTAL DRIVE
ANAHEIM, CA. 92807
HYDRAULIC CALCULATIONS
FOR
WEDGE HOUSE
FIRST FLOOR
2HD CALC AT GARAGE
FILE NUMBER: 13460
DATE: JAN 21, 2021
-DESIGN DATA -
OCCUPANCY CLASSIFICATION:
NFPA 13D, 2016 EDITION
0.05 gpm/sq. ft.
DENSITY:
648.0 sq. ft.
AREA OF APPLICATION:
324.0 sq. £t. max.
COVERAGE PER SPRINKLER:
NUMBER OF SPRINKLERS CALCULATED:
2 sprinklers
TOTAL SPRINKLER WATER FLOW REQUIRED:
34.4 gPm
TOTAL WATER REQUIRED (including hose): 39.3 gPm
34.4 gpm @ 28.8 psi
FLOW AND PRESSURE (@ BOR):
52.1 psi
REQUIRED PRESSURE (@ SRC):
7/16 inch
SPRINKLER ORIFICE SIZE:
NAME OF CONTRACTOR: RESIDENTIAL FIRE SYSTEMS, INC
DESIGN/LAYOUT BY: RUBI G.
AUTHORITY HAVING JURISDICTION: CITY OF NEWPORT BEACH
CONTRACTOR CERTIFICATION NUMBER: 786965
CALCULATIONS BY HASSHRS COMPUTTEMSPROGRAM ,
SYSTEM HYDAULIC
DATE: 1/21/2021RT BEACH\FIRE SPRINKLER
SPRINKLERS\CALCS\DELTA YPage 2
3\2HD CALC-GARAGE.SDF
JOB TITLE:
WATER SUPPLY DATA
SOURCE STATIC RESID. FLOW AVAIL. TOTAL REQ'D
NODE PRESS. PRESS. @
TAG (PSI) (PSI) PRESS. @ DEMAND PRESS.
(GPM) (PSI) (GPM)
(PSI)
SRC 66.0 20.0 1500.0
65.9 39.3 52.1
AGGREGATE FLOW ANALYSIS:
TOTAL
FLOW AT SOURCE
TOTAL
OTHER
TOTAL
HOSE STREAM ALLOWANCE AT SOURCE
HOSE STREAM ALLOWANCES
DISCHARGE FROM ACTIVE5.0
SPRINKLERS
39.3
0.0
39.3
GPM
GPM
GPM
GPM
NODE
ANALYSIS DATA
NODE
TAG ELEVATION
NODE TYPE
(FT)
PRESSURE
DISCHARGE
(PSI)
(GPM)
1
20.0
_
2
20.0
- _ -13.3
- - -
3
20.0
- - _ _
13.3
- - -
4
20.0
_ _ -
-
13.3
- _ _
5
20.0
- - -
-
13.3
_ _ _
6
20.0
- - -
13.3
_ _ -
7
20.0
_-
13.2
_ _ -
8
20.0
_- _- _-
_
13.3
_ _ -
9
20.0
_
_
13.3
_ _ _
10
10.0
_
_
13.4
_ _ _
11
10.0
_
-
17.7
_ - _
11A
10.0
- - -
17.8
_ - _
11B
10.0.-
- - -
-
17.3
_ - _
11C
10.0
- - -
13.2
_ _ -
11D
10.0
K= 4.90
12.5
17.4
12
10.0
K= 4.90
-
12.0
17.0
13
10.0
- - -
-
17.3
- - -
14
10.0
- - -
17.5
- - -
TR
10.0
_ - - -
17.5
_ _ -
FS
5.0
- - -
19.2
- - -
FSI
5.0
- - -
22.1
- _ -
BR
2.0
_ _ _
-
25.1
- _ -
Ul
U2
2.0
- - -
HOSE STREAM
28.8
32.0
- - -
-2.0
5.0
U3
-3.0
_
_
34.7
- - -
U4
-3.0
_
-
36.6
- - -
SRC
-9.0
- - -
40.6
- - -
SOURCE
52.1
39.3
SPRINKLER SYSTEM HYDRAULIC ANALYSIS
Page 3
DATE: 1/21/202IRT BEACH\FIRE SPRINKLERS\CALCS\DELTA 3\2HD CALC-GARAGE.SDF
JOB TITLE:
PIPE DATA
Q (GPM) DIA (IN) LENGTH PRESS.
(FT) SUM.
PIPE TAG (PSI)
END ELEV. NOZ. PT DISC. VEL (FPS) HW(C)
NODES (FT) (K) (PSI) (GPM)
0.0 1.101 PL 13.00 PF 0.0
Pipe: 13 0.0 0.0 150 FTG 2F2E PE 0.0
1 20.0 0.0 13. 0.000 TL 29.00 PV
2
20.0 0.0 13.3 0.0
0.0 1.101 PL 1.00 PF 0.0
Pipe:
2 13.3 150 FTG 2FET PE 0.0
2 20.0 0.0 0.0 0.0 0.000 TL 15.00 PV
3
20.0 0.0 13.3 0.0
0.0 1 150 FTG 2FT1 PL P
Pipe: 3 R PE 0.0
13.3
0.0 0.0
4 22.08 PV
2 20.0 0.0 0 0 0.000 TL
20.0 0.0 13.3
0.0 1.101 PL 9.16 PF 0.0
4 Pipe: 20.0 0.0 13.3 0.0 150 FTG 96F16 pV 0.0
5 20.0 0.0 0.0
13.3 0.000 TL
2.7 1.101 PL 14.42 PF 0.1
0.0
pipe: 5 O,g 150 FTG 2E3TR PE
5 20.0 0.0 13.3 0.0 0,002 TL 44.42 PV
6 20.0 0.0 13.2 0.0
_2 ,7 1.101 PL 15.25 PF 0.0
Pipe: 6 13.3 0.0 0.9 150 FTG 2F3R BE 0.0
5 20.0 0.0 0.002 TL 20.25 PV
7
20.0 0.0 13.3 0.0
0.0 1.101 PL 5.08 PF 0.0
7 Pipe 20.0 0.0 13.3 0.0
0.0 0.0 150 FTG 2FET PE 0.0
13.3 0.000 TL 19.08 PV
8 20.0 0.0
_2,7 1.394 PL 30.50 PF 0.1
Pipe: 8 13.3 150 FTG 4F5E3TR PE 0.0
0.0 0.6 97,50 PV
7 20.0 0.0 0 0 0.001 TL
9 20.0 0.0 13.4
_2,7 1.394 PL 10.00 PF 0.0
T PE 4.3
9 Pipe 20.0 0.0 13.4 0.6 150 FTG 16.00 PV
10 10.0 0.0 0.0
17 7 0.001 TL
-2.7 1.394 PL 19.00 PF 0.0
Pipe: 100 0 0,6 150 FTG 2FTR BE 0.0
10.0 0.0 17.7 25.00 PV
10 17.8 0.0 0.001 TL
11 10.0 0.0
31.6 1.394 PL 3.25 PF 0.5
PE 0.0
Pipe: 11 0.0 6.6 150 FTG
11 10.0 0.0 17.8 0 0 0.050 TL 9.25 PV
11A
10.0 0.0 17.3
34.9 1.101 PL 14.00 PF 4•1
Pipe: 11A 11.6 150 FTG 2FTR BE 0.0
11A 10.0 0.0 17.3 0.0 0.185 TL 22.00 PV
11B 10.0 0.0 13.2
DATE: TLE: 021RT BE SPRINKLERS SYSTE HYDRAULIC
ANALYSIS JOB TITLE: Page 4'
�2HD CALC-GARAGE.SDF
PIPE TAG
END ELEV. 4(GPM) DIA(IN) LENGTH
NODES NOZ. PT DISC. VEL(FPS) HW(C) PRESS.
)
(FT) (FT) (K) (PSI) (GPM) SUM.
FL/FT (PSI)
Pipe: 11B
11B 10.0 0.0 13.2 17'4 1.101 PL 1.00 PF
11C 0.0 5.8 150 FTG 0.7
10.0 4.9 12.5 17.4 ET PE 0.0
0.052 TL 13.00 pV
Pipe: 11C
11B 10.0 0.0 13'2 17.0 1.101 PL 10.42 PF
11D 10 0.0 5.7 150 FTG 1.2
.0 9.9 12.0 17.0 ETR PE 0.0
173
0.050 TL 23.42 PV
Pipe: 12
11A 10.0 0.0 -2'7 1.394 PL 19.33 PF
12 10.0 0 0.0 0.6 150 FTG 2F4E2T0.0
.0 17.3 0.0 R PE 0.0
0.001 TL 68.33 pV
; Pipe: 13
12 10.0 0.0 -2'7 1.101 PL 45.00 PF
13 17.3 0.0 0.9 150 FTG 0.2
10.0 0.0 17.5 0.0 6F5E3TR PE 0.0
0.002 TL 102.00 pV
Pipe: 19
13 10.0 17
0.0 -2'7 1.101 PL 3.33 PF
14 .5 0.0 0.9 150 FTG 0.0
10.0 0.0 17.5 0.0 ET PE 0.0
0.002 TL 15.33 pV
Pipe: 15
14 17
10.0 0.0 -2.7 1.101 PL 10.00 pg
6 20.0 .5 0.0 0.9 150 FTG 0.0
0.0 13.2 0.0 2E PE -4.3
0.002 TL 24.00 PV
Pipe: 16
11 10.0 0.0 17.8 -34.4 1.394 PL 9.66 pF
TR 10.0 0.0 19.2 0.0 7 2 1.4
150 FTG ETR PE 0.0
0.059 TL 24.66 PV
Pipe: 100
TR 10.0 0.0 19.2 0.0
-34.4 1.394 PL 5.00 PF
0.7
FS 5.0 0.0 22.1 0.0 7'2 150 FTG TR PE 2.2
0.059 TL 12.00 PV
Pipe: 101
FS1 5.0 0.0 25.1 0.0
FIXED PRESSURE LOSS DEVICE
FS 5.0 0.0 22.1 0.0 3.0 psi. 34.4 qpm
Pipe: 102
FS1 5.0 0.0 25.1 -34.4 1.101 PL 4.00 pF
BR 0.0 11.6 150 FTG 2.9
2.0 0.0 28.8 0.0 RC PE 1.3
0.185 TL 13.00 pV
Pipe: 103
BR 2.0 0.0 28.8 -34.4 1.527 PL 52.00 PF
U1 2.0 H.S. 32.0 5.0 0.0 6.0 150 FTG 7E PE 3.3
0.0
0.038 TL 87.00 PV
Pipe: 109
U1 2.0 H.S. -39.9 1.505 PL 9.00 PF
U2 32.0 5.0 7.1 150 FTG 0.9
-2.0 0.0 34.7 0.0 ET PE 1.7
0.052 TL 17.00 PV
Pipe; 105
U2 -2.0 0.0 34.7 -39.4 2.003 PL 85.25 PF
U3 0.0 4.0 150 FTG 1.5
-3.0 0.0 36.6 0.0 3E PE 0.4
0.013 TL 118.25 pV
' SPRINKLER SYSTEM HYDRAULIC ANALYSIS
Page 5
DATE: 1/21/2021RT BEACH\FIRE SPRINKLERS\CALCS\DELTA 3\2HD CALC-GARAGE.SDF
JOB TITLE:
Q(GPM) DIA(IN) LENGTH PRESS.
PIPE TAG SUM.
END ELEV. NO?. PT DISC. VEL(FPS) HW(C) (FT) (PSI)
NODES (FT) (K) (PSI) (GPM)
FIXED PRESSURE LOSS DEVICE
Pipe: 106 4.0 psi, 39.4 gpm
U4 -3.0 0.0 40.6 0.0
03 -3.0 0.0 36.6 0.0
-39.3 0.995 PL 8.25 PF
PE 1
Pipe: 107 G
0,4
U4 -3.0 0.0 40.6 0.0 16.2 0.390 TL28.25 PV
SRC -4.0 SRCE 52.1 (N/A)
NOTES (HASS):
(1) Calculations were performed by the HASS 8.8 D computer program
in accordance with NFPA13 (2019)
under license no. 38061304 granted by
HRS Systems, Inc.
208 Southside Square
Petersburg, TN 37144
(931) 659-9760
(2) The system has been calculated to provide an average
imbalance at each node of 000001 gpmm and a maximum
imbalance at any node
(3) Total pressure at each node is used in balancing the system.
Maximum water velocity is 16.2 ft/sec at pipe 107.
(4) Items listed in bold print on the cover sheet
are automatically transferred from the calculation report.
(5) Available pressure at source node SRC under full flow conditions is
65.93 psi with a flow of 45.59 gpm•
(6) PIPE FITTINGS TABLE
User Pipe Table Name: STANDARD.PIP
PAGE: F MATERIAL: CPVC HWC: 150
Diameter Equivalent Fitting Lengths in Feet G
F E T R K
(in) 45 E1 Tee RunT Kplg ChkVly Gate
1.101 1.00 7.00 5.00 1.00 1.00 8.00 2.00
1.394 2.00 8.00 6.00 1.00 1.00 11.00 3.00
2.003 2.00 11-0010.00 1.00 1.00 17.00 3.00
DATE: 1/21/2021RT
SPRINKLE
SYSTEM HYDRAULIC SIS
BEACH\FIRE RSPRINKLERS\CALCS\DELTAY
Page 6
JOB TITLE:
3\2HD
CALC-GARAGE.SDF
PAGE: K
MATERIAL: CT-K HWC: 150
Diameter
Equivalent Fitting Lengths in
Feet
T F
0.995
R K C
Ell Tee 95-Ell TeeRun Kou 1 G
2.00 GatVly
N x
NPTee
6.00 1.00 2.00 O.000hkVly
6.00
AngVly
0.00
6.00 19.00
PAGE: L
MATERIAL: CT-L HWC: 150
Diameter
(in)
Equivalent Fitting Lengths in Feet
1.505
E T F R K
Ell C G
Tee 95-Ell TeeRun Kouplg ChkVly GatVly
9.00
N
NPTee
9.00 2.00 3.00 0.50 10.00 0.00
9.00
PAGE: M
MATERIAL: CT-M HWC: 150
Diameter
(in)
Equivalent Fitting Lengths in Feet
1.527
E T F R K C G
Ell Tee 95-Ell TeeRun Kouplg ChkVly Gat
N
5.00 9.00 2.00 3.00 0.50 11.00
NPTee
0.00
9.00
SPRINKLER SYSTEM HYDRAULIC ANALYSIS
Page 7
,/ol/7021RT BEACH\FIRE SPRINKLERS\CALCS\DELTA 3\2HD CALC-GARAGE.SDF
DATE:
JOB TIT
E
LL
tS
0
0
0
N
.1
0
� r �
aawm�noaw -o.N.�._
rl N
/ SPRINKLER SYSTEM HYDRAULIC ANALYSIS
DATE: 1/21/202IRT BEACH\FIRE SPRINKLERS\CALCS\DELTA 3\2HD CALC-GARAGPage
E.SDFB
JOB TITLE:
WATER SUPPLY CURVE
72+
I
I
660\
I \
I \
I \
60+
I \
I \
I \
54+ \
X
I \
I \
P 48+
R
E \
S
S 42+ \
U
R
E I \
36+ \
P
S
I 30+
I \
I \
I \\
24+
I
I \
I \
18+ �
I
I
12+ LEGEND
I
I X = Required Water Supply
1 52.06 psi @ 39.3 qpm
6+
1 0 = Available Water Supply
65.95 psi @ 39.3 gpm
<-20.0 psi @ 1500 gpm
Flow Test Point
—T------------------------------__
---
900 600 800 1000 1200 +-------+-
1400 1600 1800
FLOW (GPM)
2000