HomeMy WebLinkAboutREV22-0385 - Misc3-Tv?vzZ
PROJECT TIC FI 453 Joey
PROJECTNO. S21-0215
�•
• • ITEM Cover
I'r1 :W*
Zy t2-20LI/RCezt-03f,
SHEETNO.
DATE 3/3/2022
ENGINEER DM
5
Project For:
Steiner Studio
17800 Mitchell North
Irvine, CA
92614
Structural Calculations
For
TIC FI 453 Joey
453 Newport Center Dr.
Newport Beach, CA 92660
Supplemental Calculations
3/3/2022
BRANDOW &JOHNSTON STRUCTURAL & CIVILENGINEERS j LOS ANGELES NEWPORTBEACH
PROJECT TIC
.1 FI 453 Joey I SHEET NO. I
PROJECT NO. S21-0215 I DATE 03/03/2022
ITEM Description
EST. INS ENGINEER DM I
Calculation Description
These calculations are justification for WT splice detail 4/S1.2.
Detail was added in response to an RFI.
RRANDOWBJOHNSTON STRUCTURAL+ CIVIL ENGINEERS LOSANGELES NEWPORTBEACH
PROJECT 'TI c.. FI
PROJECT NO, t, l i' 02
a ITEM I.ii'_.-
EST. 1949
SHEET NO.
GATE
ENGINEERt^'
EIRANDOW&JOHNSTON STRUCTURAL+ CIVIL ENGINEERS LOS ANGELES NEWPORT BEACH
SHEET NO.
DATE 3/3/2022
ENGINEER DM
Structural Calculations
For
TIC FI 453 Joey
453 Newport Center Dr.
Newport Beach, CA 92660
Supplemental Calculations
3/3/2022
Project For:
Steiner Studio
17800 Mitchell North
Irvine, CA
92614
ERANOOW & JOHNSTON STRUCTURAL & CIVILENGINEERS I LOS ANGELES NEWPORT BEACH
PROJECT TICFI 453 Joey I SHEET NO. I
PROJEGTNO. s21.I -0215 I GATE 03/03/2022 I
EST. 1945
ITEM Description I ENGINEER DM I
Calculation Description
These calculations are justification for WT splice detail 4/S1.2.
Detail was added in response to an RFI.
GRANGOW a JOHNSTON STRUCTURAL+ CIVIL ENGINEERS LOS ANGELES NEWPORT BEACH
PROJECT T 1 G.- F l ��S �S = C>i.`! _ SHEET NO. _I
PROJECT NO. T I'n2 7 DATE
ITEM E.ei ^Pe:OLE _— J ENGINEER
SHEETNO.
BATE 3/3/2022
ENGINEER DM
Structural Calculations
For
TIC FI 453 Joey
453 Newport Center Dr.
Newport Beach, CA 92660
Supplemental Calculations
3/3/2022
Project For:
Steiner Studio
17800 Mitchell North
Irvine, CA
92614
BRANBOW & JOHNSTON STRUCTURAL & CIVILENGINEERS I LOS ANGELES NEWPORT BEACH
PROJECT TIC FI 453 Joey I SHEET NO. I
PROJECT NO. S21-0215 I GATE 03/03/2022 I
' 1 Descri tion
EST. 1565 ITEM p I ENGINEER DM I
Calculation Descriotion
These calculations are justification for WT splice detail 4/S1.2.
Detail was added in response to an RFI.
RRANDOW&JOHNSTON STRUCTURAL+ CIVIL ENGINEERS LOS ANGELES NEWPORT BEACH
PROJECT _El C- F ) y5"' ' SHEET NO.
PROJECT NO. rL e'f}G.;— _ J DATE J�.
ITEM Lff, VIJ 6F, ENGINEER 471X,
11
RRANDOW &
JOHNSTON
Project For:
Steiner Studio
17800 Mitchell North
Irvine, CA
92614
PROJECT TIC FI 453 Joey
PROJECT NO.
ITEM Cover
Structural Calculations
For
TIC FI 453 Joey
453 Newport Center Dr.
Newport Beach, CA 92660
Supplemental Calculations
3/3/2022
SHEET NO. ____.. ......
GATE 3/3/2022
ENGINEER DM
SRANDOW & JOHNSTON STRUCTURAL & CIVILENGINEERS I LOS ANGELES NEWPORTBEACH
PROJECT TIC FI 453 Joey I SHEET NO. I
PROJECT NO. S21-02
DATE 03/03/2022 I
Descripntion
EST. 169E ITEM Y ENGINEER DM I
Calculation Description
These calculations are justification for WT splice detail 4/S1.2.
Detail was added in response to an RFI.
BRANOOW&JOHNSTON STRUCTURAL+ CIVIL ENGINEERS LOSANGELES NEWPORTBEACH
PROJECT -TIC— F/SAS ;:c7 E:'-! SHEET NO.
PROJECT NO. G E'6L-yr _. ..J DATE _L�[y�C7�.�__J
ITEM LEI ^PL' LF; _ ENGINEER Z2 �--= I