Loading...
HomeMy WebLinkAbout1669 - RECOMMEND APPROVAL OF GPA AND CA TO KOLL CENTER PC (PC-15)RESOLUTION NO. 1669 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH RECOMMENDING APPROVAL OF GENERAL PLAN AMENDMENT NO. 2004 -006 TO INCREASE THE DEVELOPMENT ALLOCATION OF KOLL CENTER NEWPORT OFFICE SITE B OF AIRPORT AREA (STATISTICAL AREA L4) BY 1,750 SQUARE FEET AND CODE AMENDMENT NO. 2005 -006 TO INCREASE THE DEVELOPMENT ALLOCATION FOR PROFESSIONAL AND BUSINESS OFFICES OF SITE B IN THE KOLL CENTER PLANNED COMMUNITY DISTRICT (PC -15) BY 1,367 NET SQUARE FEET (PA2004 -231) WHEREAS, an application was filed by Master Development Corporation with respect to property located at 4200 Von Karman Avenue, and legally described as Parcel 3 of Parcel map No. 82 -713 map filed in Book 181, Pages 13 through 19, proposing to amend the Statistical Area L4 (Koll Center Newport Office Site B) of the Land Use Element to increase the development allocation by 1,750 gross square feet and the Koll Center Planned Community Text (PC -15) by 1,367 net square feet in order to accommodate the construction of 3,080 square foot office building. The applicant proposes to replace the existing one -story 1,330 square foot with a new 2 -story 3,080 square foot office building. WHEREAS, at the June 9, 2005 meeting, the Planning Commission received public comments and continued the application to July 7, 2005. The continuance was necessary for the applicant to resolve several outstanding issues with the Koll Company. WHEREAS, a public hearing was held on July 7, 2005, in the City Hall Council Chambers, 3300 Newport Boulevard, Newport Beach, California. A notice of time, place and purpose of the meeting was given in accordance with the Municipal Code. Evidence, both written and oral, was presented to and considered by the Planning Commission at this meeting. WHEREAS, the property is designated Administrative, Professional, & Financial Commercial by the General Plan Land Use Element. The City has adopted Planned Community District Regulations (PC -15 Koll Center) that establish development standards and use regulations to implement the General Plan. The property is presently improved with a one -story 1,330 square foot professional office building. NOW THEREFORE, THE PLANNING COMMISSION HEREBY RESOLVES AS FOLLOWS: Section No. 1. The Planning Commission makes the following findings: 1. As part of the development and implementation of the Newport Beach General Plan, the Land Use Element has been prepared which, sets forth objectives, supporting policies and limitations for development in the City of Newport Beach and designates the general distribution and general location and extent of the uses of land and building intensities in a number of ways, including commercial floor area limitations. Planning Commission Resolution No. _ Page 2 of 9 2. The General Plan provides for a sufficient diversity of land uses so that schools, employment, recreation areas, public facilities, churches and neighborhood shopping centers are in close proximity to each resident of the community. The proposed amendment does not impact the diversity of land uses but only modestly increases the intensity of existing uses. 3. The Land Use Element of the General Plan allows for the redevelopment of older or underutilized properties to preserve the value of property by allowing for some modest growth, while maintaining acceptable levels of traffic service. The project consists of an increase in the development allocation of 1,750 gross square feet, which will not result in an increase in traffic levels beyond the projected capacity and levels of service of the circulation system as the project is anticipated to generate 19 additional daily trips, with 2 — A.M. peak hour trips and 2 - P.M. peak hour trips, which are insignificant increases. 4. The City's General Plan indicates that the City shall maintain suitable and adequate standards for landscaping, sign control, site and building design, parking and undergrounding of utilities to ensure that the quality character of residential neighborhoods are maintained and that commercial and office projects are aesthetically pleasing and compatible with surrounding land uses. The City implements this policy through the Koll Center Planned Community Text. Other than the modest increase in intensity, the project meets all applicable development standards. The project has also been designed to be physically compatible with the existing and surrounding professional office and commercial developments. 5. Charter Section 423 requires all proposed General Plan Amendments to be reviewed to determine if the square footage, peak hour vehicle trip or dwelling unit thresholds have been exceeded and a vote by the public is required. This project has been reviewed in accordance with Council Policy A -18 and a voter approval is not required as the project represents an increase of 2 — A.M. and 2 — P.M. peak hour trips, 1,750 gross square feet of non - residential floor area and zero residential units. These increases, when added with 80% of the increases attributable to two previously approved amendments, result in a total of 21.4 —A.M. peak hour trips and 29.2 — P.M. peak hour trips and a total increase in 3,022 square feet do not cumulatively exceed Charter Section 423 thresholds for a vote. 6. Pursuant to the California Environmental Quality Act, the project has been reviewed, and it has been determined that it is categorically exempt from the requirements of the California Environmental Quality Act under Class 3 (New Construction or Conversion of Small Structures). This class allows for new constructions of up to 10,000 square feet in urbanized areas where all necessary public services and facilities are available and the surrounding area is not environmentally sensitive. Section No. 2. Based on the aforementioned findings, the Planning Commission hereby recommends approval of General Plan Amendment No. 2004 -006 per the revised estimated growth table depicted in Exhibit "A" and Code Amendment No. 2005 -006 per the Planning Commission Resolution No. Page 3 of 9 revised Koll Center Newport Planned Community District regulations depicted in Exhibit "B" subject to the standard code requirements listed in Exhibit "C ". PASSED, APPROVED AND ADOPTED THIS 7th DAY OF JULY 2005. AYES: Eaton, Hawkins, Cole, Toerge Tucker and Henn ABSENT: McDaniel NOES: None BY: &� Michael Te rge, Chairman Barry Eato , Secretary Planning Commission Resolution No. Page 4 of 9 Exhibit "A" The following changes will be made to the Land Use Element and all other provisions of the Land Use Element shall remain unchanged: Airport Area (Statistical Area L4) 1 -2. KCN Office Site B. This site is designated for Administrative, Professional and Financial Commercial land use and is allowed 1,062,648 (1,060,898 + 1,750) sq. ft. Support retail commercial uses are allowed within this allocation. ESTIMATED GROWTH FOR STATISTICAL AREA L4 Residential (in du's) Commercial (in sq. ft.) Existing Gen. Plan Projected Existing Gen. Plan Projected 01/01/1987 Projection Growth 01/01/1987 Projection Growth 1 -1. KCN OS A 0 0 0 889,346 889,346 15,000 1 -2. KCN OS B 0 0 0 1,060,898 1,062,648 1,750 1 -3. KCN OS C 0 0 0 734,641 734,641 0 14. KCN OS D 0 0 0 250,176 250,176 0 1 -5. KCN OS E 0 0 0 27,150 32,500 5,350 1 -6. KCN OS F 0 0 0 31,816 34,500 2,684 1 -7. KCN OS G 0 0 0 81,372 81,372 0 1 -8. KCN OS 1 0 0 0 377,520 442.775 65,255 1 -9. KCN RS 1 0 0 0 52,086 120.000 67,914 1 -10. Court House 0 0 0 69,256 90,000 20,744 2 -1. NP BLK A 0 0 0 349,000 380,362 31,362 2 -2. NPBLK B 0 0 0 10,150 11,950 1,800 2 -3. NP BLK C 0 0 0 211,487 457,880 246,393 2 -4. NP BLK D 0 0 0 274,300 288,264 13,964 2 -5. NP BLK E 0 0 0 834,762 860,884 26,122 2 -6. NP BLK F 0 0 0 225,864 228,214 2,350 2 -7. NP BLK G& H 0 0 0 * 342,641 344,231 1,590 2 -8. NP BLK I 0 0 0 160,578 160.578 0 2 -9. NP BLK J 0 0 0 190,500 228,530 38,030 3 Campus Drive 0 0 0 885,202 1,261,727 376,525 TOTAL 0 0 0 7,058,745 7,960,578 916,833 Population 0 0 0 7,960,578 * Existing square footage as of 0112212002 Revised 07/07/2005 Planning Commission Resolution No. Page 5 of 9 Exhibit "B" The following changes will be made to Part II, Section 1, Group I Professional & Business Offices of the Koll Center Newport Planned Community Development Standards and all other provisions of the PC Text shall remain unchanged. ( *) Proposed KCN P.C. Text Amendment PART II COMMERCIAL Section I. Site Area and Building Area Group I PROFESSIONAL & BUSINESS OFFICES Acreages shown are net buildable land area including landscape setbacks with property lines. (4) A. Building Sites (4) Total Acreage Site A 30.939 acres * Site B 43.703 acres (11) Site C 18.806 acres (10) Site D 19.673 acres Site E 2.371 acres Site F 1.765 acres Site G 5.317 acres (8) 122.574 acres (8)(10)(11) B. Allowable Building Area Office Acreage 30.939 acres 43.703 acres (11) 18.806 acres (10) 19.673 acres 2.371 acres 1.765 acres 5.317 acres (8) 122.574 acres (8)(10)(11) Site A 340,002 square feet (16)(26) Site B 963,949 965,216 square feet (13)(16)( *) Site C 674,800 square feet (10)(15) Site D 240,149 square feet (8)(13) Site E 32,500 square feet (4) Site F 24,300 square feet (4) Site G 45,000 square feet (8) 2-,328-,609 2.321,967 square feet (15)( *) C. Statistical Analysis (4) The following statistics are for information only. Development may include but shall not be limited to the following: Story heights shown are average heights for possible development. The buildings within each parcel may vary. Planning Commission Resolution No. Page 6 of 9 Assumed Parking Criteria: a. One (1) space per 225 square feet of net building area @ 120 cars per acre for Sites C, D, E, F and G. *(3)(4) In addition to 19.399 acres of office use, there is 9.54 acres for hotel and motel and 2.0 acres of lake within Office Site A. Therefore, there are 30.939 acres net within Office Site A. (3)(4)(16) b. One (1) space per 300 square feet of net building area @ 120 cars per acre for Sites A, B and C. (11) 1. Site A Allowable Building Area ..... Site Area a. Building Height Two story development Three story development Four story development Five story development Six story development Seven story development Eight story development Nine story development Ten story development Eleven story development Twelve story development b. Parking 1.133 cars 340,002 square feet (16)(26) ...... 19.399 acres "(3)(4)(16) Land Coverage (16) .............. 3.90 acres .............. 2.60 acres .............. 1.95 acres .............. 1.56 acres .............. 1.30 acres .............. 1.11 acres .............. 0.97 acres .............. 0.87 acres .............. 0.78 acres .............. 0.71 acres .............. 0.65 acres Land Coverage ............... 9.44 acres (11)(16) C. Landscaped Open Space (4) (11) (16) Two story development ........... Three story development ........... Four story development ........... Five story development ........... Six story development ........... Seven story development ........... Eight story development ........... Nine story development ........... Ten story development ........... Eleven story development ........... Twelve story development ........... Land Coverage 6.06 acres 7.36 acres 8.01 acres 8.40 acres 8.66 acres 8.85 acres 8.99 acres 9.09 acres 9.18 acres 9.25 acres 9.31 acres 2. Site B Allowable Building Area Site Area Planning Commission Resolution No. Page 7 of 9 ..... 963,949 965,216 square feet (13)(16)( *) .........43.703 acres (4) (11) a. Building Height Two story development Three story development Four story development Five story development Six story development Seven story development Eight story development Nine story development Ten story development Eleven story development Twelve story development Land Coverage (16)( *) ....... 41- 0611.08 acres .........7 -38 7.39 acres a a3 5.54 acres .........4.43 acres .........3-69 3.69 acres 36 3.17 acres ....... 2.77 acres .........2.46 acres .........2-24 2.22 acres .........2.01 acres ......... 4- 841.85 acres b. Parking Land Coverage (11)(13)(16)( *) 3 3,218 cars ...........26.77 26.82 acres C. Landscaped Open Space (11) Land Coverage (11)(13)(16)( *) Two story development ...............5 -.P 5.80 acres Three story development ...............9555 9.49 acres Four story development ...............41 40 11.34 acres Five story development ...............425912.45 acres Six story development ............... 13.24 13.19 acres Seven story development ...............13 13.71 acres Eight story development ...............44 1614.11 acres Nine story development ...............44 4714.42 acres Ten story development ...............4472 14.66 acres Eleven story development ...............449214.87 acres Twelve story development ...............450515.03 acres 3. Site C (10) Allowable Building Area ......... 674,800 square feet (15) (17)* Site Area ......... 18.806 acres (4) a Building Height Two story development Three story development Four story development Five story development Six story development Seven story development Eight story development Land Coverage (15) ............... 7.75 acres ............... 5.16 acres ............... 3.87 acres ............... 3.10 acres ............... 2.58 acres ............... 2.21 acres ............... 1.94 acres Planning Commission Resolution No. Page 8 of 9 Nine story development ............... 1.72 acres Ten story development ............... 1.55 acres Eleven story development ............... 1.41 acres Twelve story development ............... 1.29 acres Planning Commission Resolution No. Page 9 of 9 Exhibit "C" STANDARD CODE REQUIREMENTS 1. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 2. The applicant is required to obtain all applicable permits from the City Building and Fire Departments. The construction plans must comply with the most recent, City- adopted version of the California Building Code including but not limited to the provisions of access stairways and bathrooms. 3. A Fire Department connection shall be required and located at Von Karman Avenue if providing automatic fire extinguishing system. 4. Public fire hydrant shall be provided within 150 feet and same side of street as Fire Department connection. 5. The submitted plans shall include the existing utilities, bicycle and pedestrian easements within and adjacent to the development site. 6. The detailed curb access ramps reconstruction work required along Von Karman Avenue at Parking Access Road shall be shown on the submitted plans. 7. The final on -site parking, vehicular and pedestrian circulation systems shall be reviewed and approved by the City Traffic Engineer. 8. All improvements shall be constructed as required by Ordinance and the Public Works Department. 9. The proposed new sidewalk alignment shall be such that extraordinary efforts will not be required of wheelchair users when they wish to travel over the existing "turf mound" located between the parking lot and Access Road. 10. A water meter and a sewer cleanout shall be installed for the new building. 11. An encroachment permit shall be required for any work activities within the public right -of- way.