Loading...
HomeMy WebLinkAboutF2019-0142 - Miscvum-0l,1ti CITY OF NEWPORT BEACH CONIlKUNM DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newi)ortbeachca.gov 1 (949) 644-3200 FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION CHECKLIST YES NO 1. Riser Construction and Location Approval a. Drain valve ❑ 15 TY b. Backflow device (single check) ❑ c. Bell activation device ❑ d. Inspector's test valve ❑ e. Riser sized per approved plans 2. Pressure Test CC� a. System tested at operating pressure for 2 hours ❑ E� b. Pressure gauge installed ❑ 3. Sprinkler Heads shall not be installed in the fittings prior to the fittings being cemented in Place (temporary test plugs) a. Installation and spacing of temporary test plugs '� ❑ 4. Piping a. Material installed per plan ® ❑ b. Hangers per codes/prevent upward movement ❑ c. All CPVC piping shall be installed by persons who have been ❑ certified by the manufacturer for installation of CPVC piping d. Piping protected from damage ❑ 5. Bell a. Wiring installed per code} El b. Boxes installed at proper locations ❑ NOTE: CPVC plastic pipe in the garage shall not be exposed. Sprinklers that are listed as "Quick Response" or "ResidentiaP must be used. CORRECTIONS AND NOTES: FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED:n ^ PERMIT#. !0I —0l NZ BY: `G . ^ DATE: Farms\Fre Sprinkler NMA 13O 6yetem - Rough lnspec ian Checklist 08/11/2016