A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF NEWPORT BEACH APPROVING THE FINAL
ARCHITECTURAL AND LANDSCAPING PLANS FOR THE
MARINER'S POINTE PROJECT LOCATED AT 100 -300 WEST
COAST HIGHWAY AND FINDING CHANGES IN DESIGN TO BE
IN SUBSTANTIAL CONFORMANCE WITH THE DESIGN
APPROVED BY SITE DEVELOPMENT REVIEW SR2010 -001
AND USE PERMIT NO. UP2010 -024 (PA2010 -114)
THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. On August 9, 2011, the City Council adopted Resolution No. 2011 -86 approving the
Mariner's Pointe project, a 19,905- square -foot commercial building and a three -level
parking structure on a 0.76 -acre site located 100 -300 West Coast Highway, and legally
described as Lots 1, 2, 3A 5, and 6 of Tract No. 1210; and
2. In compliance with Condition No. 4 of City Council Resolution No. 2011 -86, the applicant,
VBAS Corporation, has submitted final architectural plans for review and approval by the
Planning Commission; and
3. In compliance with Condition No. 20 of City Council Resolution No. 2011 -86, the
applicant has submitted final landscaping plans for review and approval by the Planning
Commission; and
4. The applicant has proposed revisions to the approved conceptual building design, which
include minor increases in height to various tower elements of the parking structure
and the addition and expansion of rooftop mechanical equipment enclosures; and
5. A public meeting was held by the Planning Commission on June 7, 2012, in the City Hall
Council Chambers, 3300 Newport Boulevard, Newport Beach, California. A notice of
time, place and purpose of the meeting was given in accordance with the Newport
Beach Municipal Code. Evidence, both written and oral, was presented to, and
considered by, the Planning Commission at this meeting; and
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. A Mitigated Negative Declaration (SCH No. No. 2011041038) was prepared for the
project in accordance with the implementing guidelines of the California Environmental
Quality Act (CEQA). The document was made available for public review and
comment during a 30 -day review period beginning on April 11, 2011, and ending on
May 11, 2011, and subsequently approved by the City Council on August 9, 2011. A
subsequent mitigated negative declaration for the project is not required to be
prepared pursuant to CEQA Guidelines Section 15162 because the proposed
Planning Commission Resolution No. 1878
Pape 2 of 4
revisions to project design are minor and do not constitute "substantial changes" to the
project that would involve new significant environmental effects or result in additional
mitigation measures.
SECTION 3. REQUIRED FINDINGS.
1. Pursuant to Condition of Approval No. 4, the Planning Commission must find that the final
architectural plans incorporate the architectural elements and high level of detail that were
illustrated in the approved conceptual plans. The following facts in support of such finding
are set forth:
Facts in Support of Finding:
A. Although minor adjustments have been made to the building elevations, the
proposed final plans implement the principal architectural elements and high level
of detail that was illustrated in the approved conceptual plans, including the
balconies, tower features, awnings, ornamental windows and railings, cornices and
moldings, stone veneer, ornamental lighting fixtures, and variation in building
elevations.
B. To reduce the overall mass of the building and to enhance its visual quality, the
design utilizes several vertical and horizontal offsets, includes variation in height
through the use of entry and corner tower elements, and utilizes multiple materials
and colors.
C. Additional architectural enhancements have also been added; for example, the
openings within the main tower element of the parking structure have been covered
with decorative metal screen that will conceal vehicles accessing the parking
structure ramps and interior lighting. It also provides an additional layer to the wall
plane with accent lighting to increase visual interest.
D. The final plans also maintain the clean roof design with all mechanical equipment
screened from view within equipment enclosures to enhance the aesthetics of the
roof as viewed by the residences above. The flat portions of the roof are proposed
to be constructed with materials that meet required "cool roofs" standards for
energy efficiency, but will be tan in color to reduce glare.
E. The lighting plans illustrate that all exterior lighting fixtures have been designed,
shielded, aimed, or located to shield adjacent properties and to avoid excessive
light and glare inconsistent with the project conditions of approval and the outdoor
lighting standards of the Zoning Code. The cupola and tower feature located at the
southeasterly corner of the building includes accent lighting around its perimeter;
however, lighting has been eliminated from the interior and rear of the feature to
avoid unnecessary lighting that could impact the residences above.
Tmplt 11/23/09
Planning Commission Resolution No. 1878
Paae 3 of 4
2. Pursuant to Condition of Approval No. 20, the Planning Commission must find that the
final landscaping plans implement the landscaping improvements that were illustrated in
the approved conceptual plans. The following facts in support of such finding are set forth:
Facts in Support of Finding:
A. The approved conceptual landscape plan included extensive decorative paving, a
280 - square -foot water feature, and approximately 3,700 square feet of planter area
that included a variety of plant materials. Minor revisions have been made to the
final landscaping plan, including revised placement of palm trees, increased
decorative paving in front of Suite R -104, and an enlarged water feature. Planter
area has been reduced to approximately 2,460 square feet due to increased
decorative paving and an enlarged water feature area of 598 square feet.
B. The plan continues to implement the landscape requirements of the Mariner's Mile
Strategic Vision and Design Framework by providing the minimum four - foot -wide
planter area with continuous hedge and palms. Despite the reduction in planter
area, the plans maintain a variation of ornamental groundcover, vines, shrubs, and
trees to help soften and buffer the massing of the parking structure and commercial
building from the surrounding areas and roadways
3. Upon completing the structural drawings for the project, a number of revisions needed to
be made to the approved conceptual building. Pursuant to Condition of Approval No. 1,
the project design changes shall be in substantial conformance with the approved
conceptual plans and pursuant to Condition of Approval No. 4, the Planning Commission
may approve changes. The following facts in support of such finding are set forth:
Facts in Support of Finding:
A. The increased height for the three parking structure tower elements continue to
comply with the maximum 35 -foot height limit for flat roofs and 40 -foot height limit
for sloping roofs that was approved under Site Development Review No. SR2010-
001. These features within the context of the overall design will provide visual
interest as vertical elements that help break up the project massing.
B. The changes in the design of the roof - mounted mechanical equipment screening
enclosures are necessary to accommodate the installation of current and future
mechanical equipment, including silencers to minimize noise and pollution control
units to control odors. Since the equipment will not be under a solid roof, a noise
assessment was prepared for the project by Mestre Greve Associates. In addition
to the mechanical equipment system, the noise assessment analyzed the
cumulative noise that may be generated from the project including the parking
structure activity and outdoor dining activity. The results of the assessment verified
that with the specific mechanical equipment with silencers, the noise generated will
be in compliance with the City's noise standards (NBMC Section 10.26).
Tmplt: 11/23/09
Planning Commission Resolution No. 1878
Page 4 of 4
C. To address the loss of the seven on -site parking spaces, when use permit
applications are submitted for the future restaurant uses, they will be reviewed to
ensure adequate parking is provided based on the proposed net public area.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. Consistent with Condition Nos. 4 and 20 of City Council Resolution No. 2011 -86, the
Planning Commission of the City of Newport Beach hereby approves the final
architectural and landscaping plans for the Mariner's Pointe project.
2. The Planning Commission finds the proposed revisions to the project design are in
substantial conformance with the project approved by Site Development Review No.
SR2010 -001 and Use Permit No. UP2010 -024.
3. This action shall become final and effective fourteen days after the adoption of this
Resolution unless within such time an appeal is filed with the City Clerk in accordance
with the provisions of Title 20 Planning and Zoning, of the Newport Beach Municipal
Code.
PASSED, APPROVED AND ADOPTED THIS 7TH DAY OF JUNE, 2012.
AYES: Ameri, Hillgren, Kramer, and Tucker
NOES: Toerge
ABSTAIN: None
ABSENT: Brown and Myers
BY:
oerge,
Secretary