HomeMy WebLinkAboutX2021-3418 - MiscX20z1-3 IS Lts19
� �J�11e- 0 A
FILE NO.: Torres
DATE: 04/27/2021
PROJECT:
Structural Engin@eriri i6hlri$ por remodeling and
�g nh
Coro Mar, CA.
room addition-lo6atedin-t�6CiiY'df a- el
SUBJECT:
Structural Calculations
Owner:
Melvin Torre'
s1061
4518 Wayne Road' � „���
Corolla Del Mar, CA OA25"/ � �81 1
r
'O��,.tNTERWEST
GR PUP
If<!IS
ARCHITECT
Denise Xagorarakis b'csigns
Designer:
�,,. Y r
Costa Mesa, CA 92626 s^%� 0-;,�
mrsxaa(a).me.com r
r,
BUILDING
MD oMuela'ng a��EWED s COMPLIANCREVE
FIC REVIEW
INCEWOH
designeStructur:
24482 �OCAECTAIDOPTEDR ESPNAAND
HEE
Viejo, CA 28y; S
STATED SCOPE pF ELATED
THIS
Morzdt@gmai COmMission
INTERWEST
CO DATE:
TI G GROUP ✓/
/
CODE:
2019 CBC
ENGINEER of
RECORD:
r �
1 , (_-�
\ err•.. - -
3anivrr�r
a
3ui i0 s31011o,
>Ii�a,�ISNoO;
a
a s3a c.
N w,wv �Nu
I L/H13�1�HU
1: �'I iir I^IIOd ONY SPId - -
03i iahl d0 s.,d Sdx] lira is' lON S30N �SNVId 3S3Hi
1N3W1aVd30 ONICTnO NOV38180dM3N 10 ,U
/12/2020
U.S. Sets Ic Design Maps
OSH PD
4518 Wayne Rd, Corona Del Mar, CA 92625, USA
Latitude, Longitude: 33.5912876,-117.8587532
0 IP60r
creSr
m e<n
�a
aZook Harold B whoa
w
oc �twona p fat o
a nPR
a
�a5o1
C�7iaha �\,�a
yo
F
Go
gle
Map data 02021
Deft
4/12/2021, 4:26:16 PM
Design
Code Reference Document
ASCE7-16
Risk Category
II
Site Class
D - Default (See Section 11.4.3)
j Type
Value...
Description
Ss
1.342
MCER ground motion. (for 0.2 second period)
St
0.475
MCER ground motion. (for 1.Os period)
',- SMs
1.61
Site -modified spectral acceleration value
SMI
null -See Section 11.4.8
Site -modified spectral acceleration value
SDe
1.073
Numeric seismic design value at 0.2 second SA
SD1
null -See Section 11.4.8
Numeric seismic design value at 1.0 second SA
Type
Value
Description
SDC
null See Section 11..8
Seis Ic design category
Fa
1.2
Site a plification factor at 0.2 second
! Fv
null See Section 11..8
Stte a plification factor at 1.0 second
-, PGA
0.585
MCED peak ground acceleration
FPGA
1.2
Site a plification factor at PGA '..
PGAM
0.702
Site odified peak ground acceleration
�I TL
8
Long -period transition period In seconds
SsRT
1.342
Probabilistic risk -targeted ground motion. (0.2 second)
SsUH
1.474
Factored uniform -hazard (2% probability of exceedance in 50 years) spectral acceleration
SsD
2.645
Factored deterministic acceleration value. (0.2 second)
j, S1RT
0.475
Probabilistic risk -targeted ground motion. (1.0 second)
S1 UH
0.515
Factored uniform -hazard (2°k probability of exceedance in 50 years) spectral acceleration.
S1D
0.825
Factored deterministic acceleration value. (1.0 second) '..
PGAd
1.064
Factored deterministic acceleration value. (Peak Ground Acceleration)
CRs
0.91
Mapped value of the risk coefficient at short periods
., CR1
0.922
Mapped value of the risk coefficient at a period of 1 s
hftps://seis lemaps.org 1/2
4/12/2021
U.S. Seismic Design Maps
DISCLAIMER
While the informatlon presented on this website is believed to be correct, SEAOC /OyS,HPD and its sponsors and contributors assume no responsibility or
liability for its accuracy. The material presented in this web application should not be used or relied upon for any speck application without competent examination
and verification of Its accuracy, suitability and applicability by engineers or other licensed professionals. SEAOC / OSHPD do not Intend that the use of this
information replace the sound Judgment of such competent professionals, having experience and knowledge in the field of practice, nor to substitute for the
standard of care required of such professionals in interpreting and applying the results of the seismic data provided by this website. Users of the information from
this website assume all liability arising from such use. Use of the output of this website does not Imply approval by the governing building code bodies responsible
for building code approval and interpretation for the building site described by latitudeAongitude location in the search results of this website.
https://soismicmaps.org 2/2
MDTORRES PAGE: 1 / 11
COUNSLTING PROJECT NO.: Torres PLAN: ADDITION DATE: 4/12/2021
LOAD DEFINITIONS
PLAN ORIENTATION
East-West (X dir)
North -South (Y dir)
LOAD TYPES
D
L
Lr
Sn
W(+)
W(-)
E
E=Eh+/-Ev
Ern =DEh+/-Ev
SPECIFICATIONS AND SCHEDULES
Dead Load
Floor Live Load
Roof Live Load
Snow Load
Wind Load (Bottom and Left)
Wind Load (Top and Right)
Seismic Load
Ev = (0.2 Sds)D
Ev = (0.2 Sds)D
LOAD COMBINATIONS - 2018 IBC ASD REGULAR
N
Y
d
W E
X
Longitudinal
S
D
IBC 18 ASD (1")
D + 0.75L+ 0.75Lr+ 0.45W(-)
IBC 18 ASD (16-13)
D+L
IBC 18 ASD(16-9)
D+0.75L+0.75Sn+0.45W(+)
IBC 18 ASD(16-13)
D+Lr
IBC 18 ASD(16-10)
D + 0.75L + 0.75Sn + 0.45W(-)
IBC 18 ASD(16-13)
D+Sn
IBC 18 ASD(16-10)
D+0.75L+0.75Lr+0.75 x0.7pE
IBC 18 ASD(16-13)
D + 0.75L + 0.75Lr
IBC 18 ASD(16-11)
D+0.75L+0.75Lr-0.75x0.7pE
IBC 18 ASD(16-13)
D+0.75L+0.75Sn
IBC 18 ASD(16-11)
D + 0.75L + 0.75Sn + 0.75 x0.7pE
IBC 18 ASD(16-14)
D+0.6W(+)
IBC 18 ASD(16-12)
D + 0.75L + 0.75Sn - 0.75 x 0.7pE
IBC 18 ASD(16-14)
D + 0.6W(-)
IBC 18 ASD (16-12)
0.61) + 0.6W(+)
IBC 18 ASD (16-15)
D + 0.7pE
IBC 18 ASD (16-12)
0.613 + 0.6W(-)
IBC 18 ASD (16-15)
D - 0.7pE
IBC 18 ASD (16-12)
0.61) + 0.7pE
IBC 18 ASD (16-16)
D + 0.75L + 0.75Lr+ 0.45W(+)
IBC 18 ASD (16-13)
0.61) - 0.7pE
IBC 18 ASD (16-16)
LOAD COMBINATIONS - 2018 IBC ASD DEFLECTION
L IBC 18 ASD T 1604.3 (fd)D + 0.75L + 0.75Lr
Lr IBC 18 ASD T 1604.3 (fd)D + 0.75L + 0.75Sn
Sn IBC 18 ASD T 1604.3 + (Cd)E
(fd)D+ L IBC 18 ASD T 1604.3 - (Cd)E
(fd)D + Lr IBC 18 ASD T 1604.3
LOAD COMBINATIONS - 2018 IBC ASD SPECIAL SEISMIC
0.83(D + 0.7Em) IBC 18 ASD ASCE 12.4.3.1(5)
0.83(D - 0.7Em) IBC 18 ASD ASCE 12.4.3.1(5)
0.83(D + 0.75L + 0.75Lr+ 0.75(0.7Em)) IBC 18 ASD ASCE 12.4.3.1(6)
0.83(D + 0.75L + 0.75Lr - 0.75(0.7Em)) IBC 18 ASD ASCE 12.4.3.1(6)
IBC 18 ASD T 1604.3
IBC 18 ASD T 1604.3
IBC 18 ASD ASCE 12-12.1
IBC 18 ASD ASCE 12-12.1
MDTORRES
COUNSLTING PROJECT NO.: Torres PLAN: ADDITION
PAGE: 2 / 11
DATE: 4/12/2021
0.83(D + 0.75L + 0.75(fs)Sn + 0.75(0.7Em))
0.83(D + 0.75L + 0.75(fs)Sn - 0.75(0.7Em))
0.83(0.6D + 0.7Em)
0.83(0.6D - 0.7Em)
NOTES:
IBC 18 ASD ASCE 12.4.3.1(6)
IBC 18 ASD ASCE 12.4.3.1(6)
IBC 18 ASD ASCE 12.4.3.1(8)
IBC 18 ASD ASCE 12.4.3.1(8)
fd: Dead load reduction factor per IBC 18, table 1604.3 footnotes d & g
Cd: Seismic deflection amplification factor per ASCE 7-16, table 12.2-1
MDTORRES
COUNSLTING PROJECT NO.: Torres PLAN: ADDITION
PAGE: 3/11
DATE: 4/1212021
MATERIAL SPECIFICATIONS
1. Concrete member strength is as noted.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Hardware embedment into concrete is based on fG2500 psi, U.N.O..
Steel Reinforcement is Grade 60 except that No. 3 and No. 4 bars are Grade 40.
Nails are 8d common, 10d common and 16d framing (short), U.N.O..
Hardware is Simpson brand U.N.O..
Solid framing lumber shall conform with the rules of the Western Wood Products
Association. Lumber grades, U.N.O. shall be:
Use
2x4 studs 9 It in height or less:
2x4 studs more than 9' in height:
2x6 studs 9 ft in height or less:
2x6 studs more than V in height:
2x8 & deeper studs:
2x4, 3x4, & 44 plates:
2x6, 3x6, 4x6 & deeper plates:
3x4 & 44 studs & posts:
46 & deeper studs & posts:
6x6 & larger square posts:
6x8 & larger rectangular posts:
2x4 joists & rafters:
2x6 & deeper joists & rafters:
4x6 & deeper beams:
6x8, 8x10, 10x12 and deeper beams:
Grade mark and bending stress
Douglas Fir -Larch Stud
Douglas Fir -Larch Construction or#2
Douglas Fir -Larch Stud
Douglas Fir -Larch Construction or#2
Douglas Fir -Larch #2
Douglas Fir -Larch #2
Douglas Fir -Larch Construction or #2
Douglas Fir -Larch Construction or #2
Douglas Fir -Larch Construction or #2
Douglas Fir -Larch Construction or #1
Douglas Fir -Larch Construction or #1
Douglas Fir -Larch Construction or#2
Douglas Fir -Larch Construction or #2
Douglas Fir -Larch Construction or#2
Douglas Fir -Larch #1
Glued -Laminated beams are 24F-V4 for simple span and 24F-VB for other conditions.
Manufactured lumber is by Truss -Joist MacMillan, U.N.O..
I -Joists are by Truss -Joist MacMillan, U.N.O..
Steel: I -beams are A36, pipe is A53 B, and tube is A500B.
MDTORRES
COUNSLTING PROJECT NO.: Torres PLAN: ADDITION
PAGE: 6 / 11
DATE: 4/12/2021
Level ROOF (Height = 13' Level Height = 13' Plate Height = 9')
(PSL 5 1/4 x 11 7/e PSL 2.0)
®—._._L = 14'—._-.
BM —ROOF 47
(Steel HSS10X6X5/8)
BM_ROOF_45(1)
(Steel HSS10X6X5/8)
—., L = 23- _.—.—.—.y
BM_ROOF_47(1)
MDTORRES
COUNSLTING PROJECT NO.: Torres PLAN: ADDITION
PAGE: 7 / 11
DATE: 4/12/2021
GRAVITY LOADS
ROOF
(Slope 2/12)
Roofing,(D)
10.00 psf
Shtg, 1/2" (15/32") OSB(D)
1.50 psf
Roof, Framing(D)
4.47 psf
Insulation(D)
0.50 psf
Allowance, Roof(D)
0.00 psf
Ceiling Framing(D)
0.00 Psf
Interior, 5/8" Gypsum board(D)
2.80 psf
Mach. & elect. system allowance(D)
0.50 psf
Sprinkler allowance(D)
0.00 psf
Item(D)
0.00 psf
Allowance, Ceiling(D)
0.00 psf
Slope Adj(D)
0.23 psf
Roof Live Load(Lr)
20.00 psf
Total D
20.00 psf
Total Lr
20.00 psf
Total
40.00 psf
INT. WALL
Interior, 1/2" Gypsum board(D)
2.80 psf
Item(D)
0.00 psf
Framing(D)
1.50 psf
Insulation, None(D)
0.40 psf
Interior, 5/8" Gypsum board(D)
2.80 psf
Mach. & elect. system allowance(D)
0.50 psf
Item(D)
0.00 psf
Allowance(D)
0.00 psf
Total D
8.00 psf
Total
8.00 psf
EXT. WALL
Exterior, Stucco, 7/8" o/ 1-15#(D)
9.20 psf
Shtg, 3/8" OSB(D)
1.50 psf
Framing(D)
2.00 psf
Insulation(D)
0.50 psf
Interior, Finish(D)
2.80 psf
Mach. & elect. system allowance(D)
0.00 psf
Item(D)
0.00 psf
Allowance(D)
0.00 Psf
Total D
16.00 psf
Total
16.00 psf
MDTORRES
COUNSLTING PROJECT NO.: Torres PLAN: ADDITION
PAGE: 8 / 11
DATE: 4/12/2021
SEISMIC
SEISMIC LOADS
SEISMIC ANALYSIS PROCEDURE
Equivalent Lateral Farce Analysis ASCE 7-16 sec 12.8
Si = 0.475
Site Class = D Default TL = 8
Ss = 1.342
F. = 1.825 Do = 3.0
SDI = 0.578
F. = 1.2 Cd = 4.0
SDs = 1.074
SDC = D
EAST -WEST (X DIR)
h„=13 1=1
R=6.5
CI=0.02 T=0.137
k=1
Redundancy Factor = 1.3
C,=SDs!(R/1)=0.165
ASCE 7-1612.8-2
C. max1=SDI /(Tx(R/1))for Ti>T=0.649
ASCE 7-1612.8-3
C. max2=SDI xTL/(T2 x(R/I))for Ti<T=37.902
ASCE 7-1612.84
C. minl = 0.044 x S Ds x 1 = 0.047
ASCE 7-16 12.8-5
C.min2=0.5 xSI!(R/I)for Sl>0.6=0.037
ASCE 7-1612.8-6
Use V = 0.165W
NORTH -SOUTH (YDIR)
h„=13 1=1
R=6.5
CI=0.02 T=0.137
k=1
Redundancy Factor = 1.3
C, = SDs / (R / 1) = 0.165
ASCE 7-16 12.8-2
C. max1 =SDI /(Tx(R/1))for TL>T=0.649
ASCE 7-1612.8-3
C,max2=SmxTo/(T' x(R/I))forTo<T=37.902
ASCE 7-16 12.8-4
Cs minl = 0.044 x S DS x 1 = 0.047
ASCE 7-16 12.8-5
C.mint=0.5x SI !(R/I)for Sl>0.6=0.037
ASCE 7-1612.8-6
Use V = 0./65W
MASS DISTRIBUTION: (USE WALL WT IN BOTH DIR)
Level W (Ibs) H (ft) WxH (Ibs-ft) WXH/i(WXH)
Area (sq ft) F (Ibs) FM F/A
ROOF 42800 13 556400 100
1600 7062 0.165 4.41
Total 42800 - 556400 100
1600 7062
project Tmes
by
MD
location
date
4/12/2021
Shear Wall Design(N)------- (4'-0")
0,7pE
Load from Current Level
D
I' T
Current Level Lateral Load, E (Unfactored) =
4.41 psf
Tributary Area A =
300.0 ft2
Redundancy Factor p =
1.3
Applied Uniform Dead Load D =
0.0 plf
Applied Point Dead Load =
0.0 Ibs
at Distance from Leftffop =
0 ft
Applied Point Dead Load =
0.0 Ibs
at Distance from Left/Top =
0 ft
Shear Wall Self Weight W =
16.0 psf
Shear Wall Length L =
4 ft
Shear Wall Height H =
6.00 ft
Capacity
Shear Wall Type Used: =
010
350 plf
Hold Down Used (Left(Top)
jHDU2
13075 Ibs
Hold Down Used (Right/Bottom)
JHDU2
3075lbs
Design Load Combination: 0.61D + 0.7pE
Applied Lateral Force for Shear Wall 0.7pE =
1204 Ibs
Applied Unit Shear of Shear Wall v =
301 plf
OK
Maximal Tension Load TO, (Left(Top) =
1977 Ibs
OK
Maximal Tension Load T1, (Right/Bottom) =
1977 Ibs
OK
Shear Wall Design OK
MDTORRES PAGE: 10111
COUNSLTING PROJECT NO.: Torres PLAN: ADDITION DATE: 4/1212021
SUMMARY
Beam Name Selection
Beam Size
BEAMS
Width/Depth/Area S / I / Wt F� / Fn / E
(in) / (in) / (in') (in3) / (in°) / (plo (psi) / (psi) / (psi)
BM ROOF_47 (PSL) 5 1/4 x 11 7/8 PSL 2.0 5.25 / 11.875 / 65.31 129.3 / 767.51 / 14.15 362.5 / 3516.25 / 2000000
BM ROOF_47(1) (Steel) HSS10X6X5/8 6.00 / 10.00 / 16.40 40.2 / 201 / 59.10
BEAM ANALYSIS
MDTORRES PAGE: 11/11
COUNSLTING PROJECT NO.: Torres PLAN: ADDITION DATE: 4/12/2021