SETBACKS AND TOP OF SLAB/FLOOR
ELEVATION CERTIFICATE
The purpose of this certificate is to insure that the structure is located properly on site per the approved
drawings. This certificate also verifies the top of slab/floor elevation noted on the approved drawings.
After the top of slab/floor elevation is verified to match the elevation specified on the approved
drawings, the contractor and inspector can measure the height of the structure to the top of slab/floor to
verify that it is equal or less than the dimension shown on building sections and elevations.
This form must be filled out by a registered surveyor or civil engineer authorized to perform surveys.
The survey must be done after the concrete forms are in place or preferable after the concrete slab is
poured or raised floor is built, but prior to starting wall framing.
Engineer/Surveyor's Name Dane P. McDougall
License # 9297
Engineer/Surveyor's Address 6 Orchard Rd Suite 200 Lake Forest CA 92630
Job Address 1244 Irvine Avenue - TR 18135 - Units 1-9
Setbacks: Sketch a site plan and specify surveyed setbacks (use back page).
* Top of slab/floor elevation: Va ries
* If slab/floor elevation varies, sketch a plan or section through slab on the back page and specify the
elevations. Use same datum used in the survey of record.
I certify that the setbacks are 0, are not ❑, per City approved plans. Describe any deviations
from plans:
I certify that top of slab/floor elevation(s) is 0, is not ❑, per City approved drawings. Describe
any deviations from plans:
11/05/2020
Date
Engineer/Surveyor's stamp and signature
Forms/SetbacksandTopofSlabElevationcert.
L.S. 9297
P:\M\MELA-001\dwg\Xrefs\Z-CERT.dwg, 1115120204:02:59 PM, CKnight,
FORM CERT, PH 1
1
L 7, J
icy
I
=' 21622 — — — ---- _
I
�j— —
RM
ro
87.
FORM PP rt
A,C'
'1508
r
'FORM AP 21509
Imo— 8_7.90 FORM
OOM7577-11, —
C
P r X0.96
M>n�
m
. _-IL
21611
,—FORM M —21510
87.89 FORM 4P i1
lt� i L 8789 i✓1
R, 4Ewe aRm,..
FORM A - I
8].89
?V L/
AP
M-11525
1-1 RM PP
L'
1 21528
iJ 87.98I�
iFOR ] 9
COX
(�A�
/,
f
—T
OA
i 1 t
21521
FORM AP�
'
2152)
r i -FORM AP
21524
LBB.01 L—_
... --
-_
21519
r88.01
r-
FORM
88 M AP
—
— = FORM PP
1
L 7, J
icy
I
=' 21622 — — — ---- _
I
�j— —
RM
ro
87.
FORM PP rt
A,C'
'1508
r
'FORM AP 21509
Imo— 8_7.90 FORM
OOM7577-11, —
C
P r X0.96
M>n�
m
. _-IL
21611
,—FORM M —21510
87.89 FORM 4P i1
lt� i L 8789 i✓1
R, 4Ewe aRm,..
FORM A - I
8].89
?V L/
AP
Sob Nt,..bcZi .. 6Y2 R t
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newoortbeachca.gov ( (949) 644-3200
Structural Observation Report
Project Address:
12-24 WiWiLot./ AN.
Repott Oate:
II- -2aLt2 ��---
CNH Inspector Name (CNe Permit N:
A2019_319
Building Owner Name;
Owner's Mailing Address (N different repo site);
Owner's Telephone N: CNB Plan Check M:
Full Nene of Structural Observer (SO)
SO E+nal Address-
SO Telephone N-. SO License r Reg. e.
ViHAI -RS
KvSUAc &0VIUI(aQoVf:Corn
9l 9413503 Cc -(202 0
PLEASE INDICATE STRUCTURAL ELEMENTS AND CDNNPCTIANR nstRwavcn r.e . i---ig--ki- u----%
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
INDICATE LOCATION(S)
_ DATE
Floor/Roo
OBSERVED
OBSERVED
10 Converleonal
❑ Concrete ,�%
❑ Steel
❑ Concrete
Fw s6Slab
❑ Mat Foundation,
❑ me s
❑ Cc e
❑ Steel eck
Prestressed Concrete
_ 3
❑ .Caisson, PUes,
❑ W of Manuf.
0onry
❑
Grad Seams
r Panels
❑ Other,
011ier:
CT Other
Other:
O ITEMS CHECKED ABOVE, ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
D J 'Kari ryy
)3UtLpreJG ) UNIT � I'�
COLUMN AA1� �.Q,i v� -_�
No A'" TH. M DFSc'kVAflaN
N Olyt('n (i(-tr�r[Nc/-S
O REPORT CONTINUED ON ATTACHED PAGES,
C1 FINAL STRUCTURAL OBSERVATION REPORT:
The structure giesetallyy compiles with the approved
construction documents, and all observed deficiencies were corrected.
' I =re ttutt the fosawing statements are true to the best of my knowledge:
1., t am the Ikensed design professional retained by the owner to be in responsible
CharQs ad the aWartral observation;
2.., 11, Or arloalir 80er4ed design professional whom I have designated above and is under
:mlf,ibt6 Idterge, havepei{omred the required site visna St each s(gniticant
�... +cooisw=donataga ta've* tlnt the structure .'t In ger—ml conformance with rhe
r e documents,
,$. 1 �xtip$l defldentlse which I have documented must be corrected, prior to
> fti, Pt the stns Systems by the City of Newport peach, Building
WL r
STAMP OF STRUCTURAL OBSERVER
Wy fR911f110091 to FOR BUalla1G NISPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEMRORT BEACH.
3,5 NL -,bU 1, �5IG%
6W PO
��� CITY OF NEWPORT BEACH
u r COMMUNITY DEVELOPMENT DEPARTMENT
011 " P BUILDING DIVISION
��.`ORN 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.gov 1 (949) 644-3200
Structural Observation Report
Project Address:
Report Date:
CNB Inspector Name:
CNB Permit #:
L3-+ 4JIrjSLcw Lg^)E
I -L-2-2,02,0
❑ Conventional
Fcotin s & ab
X2fff-35ri0t
Building Owner Name:
Owner's Mailing Address (if different from site);
Owner's Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone #:
SO License / Reg. #:
BBS/L 1gmMART
BAMMAk2PG0uV1SGJ?oe-Cory1
Q4.q:?S'2I&12
COS -2030
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check aoolicable boxesl
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
❑ Conventional
Fcotin s & ab
❑ Concrete
❑ Steel
❑ Concrete
9UI L01rJ(n 1
(2-2-Lojo
❑ Mat Fo dation,
Prestres d Concrete
❑Mason❑
Concre
El Steel Deck
UNITS 1-3
11' C ons, Piles,
ode Beams
C1 dor Manuf.
ear Panels
❑ M onry
R Wood
S CoN� FCa-JRJM(A1Ino
Other:
Other:
❑ ther:
❑Other:
❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
10 S 1?V -D S Ecorib 1"L.7J2
S;1rPT0IV6
ON BUILD
I IJN I TS 1-
!va
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division.
F)4.51,C4 Jzrrcirclgi
s m No. C0527
* Exp. 12/31/20
N
C V
VFO<
STAMP OF STRUCTURAL OI
STRUCTURAL OBSERVATION DOES NOT WANE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CRY OF NEWPORT BEACH.
Famultim¢wrWUhs,:nailonli.Pon3fw�tlons
Protect Address:
12-3-4 n/SLO =rw
Report Date: a- r CNsp toT'F�,p�nex
FRAMES
Building Owner Name:
Owners Mailing Address (if drflerent fromxs(te) `per's Telep o ' v
`
l'.la
SHEAR
Full Name of Structural Observer (SD):.
SO E maiLAddress a 'i s`< _ ,` 8O: ("P.�tey (ope
O�SR1lIp
BASIL Amni kRy
90whif1GOuVii
(Floor/Roof)
F ,OBS g
,a
°r"kY'xn- w"'t,
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONSiDR9ERVED !cheek A6-A6hoxe§)u."'vr
FOUNDATIONS
WALLS
FRAMES
DIAPHRAGMS
1IIDICATE LSX�A ON($) E
w ,�,,TE
SHEAR
RYED ' a
O�SR1lIp
(Floor/Roof)
F ,OBS g
,a
❑ Conventional
❑ Concrete
❑ Steel
❑ Concrete
Footin s& ab
w9,U1L�„_
31 1 .,
❑Mat Fo anon,
❑Mason
Con to
❑ SteePDeck r
Prestros d Concrete/.I;M�
�J7e•.fh " Nnt .
n
❑ C `sons, Piles,
OW
dor Manul-
sonry
;!a
t7& Wood`AMR-
adaBeams
ear Panels
,.�,�.,.,,.a�.
Other:
Other.
Other:
❑ Other:
❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
F t '
09&GedGD ThIRD Lpr-R Sh rNfN c>ir4 JUjLD11v(,,UNITS
1-3
No bc-FICIC-ricte-S
❑ REPORT. CONTINUED ON ATTAOHED..P1GES="
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents, and all observed deficiencies were corrected:
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. 1, or another licensed design professional whom I have designated above and Is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division.
0"4.511ztd712M4.A/
STAMP
Qp OFES&O
QPWAZgEL
No. 0052030 M
Exp. 12/31/20
CIYItiOQ?
rFOF CA��F
rRUCTURAL OBSERVER
HE CITY OF NEWPORT BEACH.
STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF
PrzmdS�n au,aloi ur.ai „n0..rym51 ovu.in n,
-yob rvu--�bu' 6529!
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.gov 1 (949) 644-3200
Structural Observation Report
Project Address:
Report Date:
CNB Inspector Name:
CNB Permit #c
113-1- w (,4A11=-
2 -10 -'Ll
X2,01-3995
Building Owner Name:
Owner's Mailing Address ('d different from site);
Owner's Telephone #:
CNB Pian Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone #:
SO License / Reg. #:.
OL AIMM,4 Q T
ROkip,C.
al Lot C1 5 l6tZ
Go52.0 O
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED !check annlirahfe hnna_cl' `
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
INDICATE LOCATION(S)
DATE
(Floor/Roof)
OBSERVED
OBSERVED
❑ Conventional
❑ Concrete
❑ Steel
❑ Concrete
Foofin s &
V lrj1
1-gip—Lf
❑ Mat Fou at!on,
❑ Masonry
❑ Concr a
❑Steelck
Prestress Concrete
UN I i (—
❑ Ca ons, Piles,
R Wood or Manuf.
❑ M Dory
❑ W od
11
ade Beams
Shear Panels
Other.
❑ Other:
Other:
Other:
❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
AA1s N—AR SAI ,t°TITIa wAiL.( A/VD AnV41;
rJ LL
fol TN Dje7w,4L.L 14T- Tnc OF O S iev-0710ty.
1yo o N=R DU-FlC/-w tC
REPORT CONTINUED ON ATTACHED PAGES , '
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies With the approved construction documents, and all observed deficiencies were corrected.
1 declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner. to be in responsible
AOFESS/
Qp
�p AZ
charge of the structural observation;
�Q FP q� FG
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
co ¢ v m
NC0520Cl0 A m
construction stage to verity that the structure Is in general conformance with the
w
cc rn 0.
approved construction documents;
# Fxp. 12/31/22
3. I understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division.
FC
6459C/
STAMP OF STRUCTURAL OBSERVER
2-10 2J
SIGNATURE OF STRUCTURAL 08 OFRECORD DATE.
STRUCTURAL OBSERVATION DOES NOT WANE ANY.REOUINEYENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
FomultilmauNObmrvaOaMepon&Iwmclbm.:.
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.gov 1 (949) 644-3200
BUILDING HEIGHT CERTIFICATION
Project Street Address: 1244 IRVINE AVE, NEWPORT BEACH
Building Permit Number(s): 2750-2019 BLDG 1, UNITS 1-3 OF TR 18135
As the surveyor of record for the project at the above address, I hereby certify that I have reviewed the
City of Newport Beach approved plan and original topographic survey and based the elevations listed
below on those plans.
Elevations shall include an allowance for roofing material thickness if not yet installed. Provide
each critical ridge and flat roof, or roof deck railing elevations indicated on the approved plans.
Use the format below on the back of this form if additional space is necessary or further
explanation is needed. Provide original copy to the inspector before roof framing inspection.
All elevation points are based on: XO NAVD88 O NGVD29 O Assumed
Please provide the following elevation information for the highest roof ridges, flat roofs, or
parapets/guardrails. Additional elevation points may be requested by the Building Inspector.
RIDGES (3:12 slope or greater)
1. Approved elevation point of ridge is 120.07' and actual elevation point is 120.07'
2. Approved elevation point of ridge is and actual elevation point is
3. Approved elevation point of ridge is and actual elevation point is
FLAT ROOFS, PARAPETS AND GUARDRAILS
1. Approved elevation point of flat roof or parapet is and actual elevation point is
2. Approved elevation point of flat roof or parapet is and actual elevation point is
3. Approved elevation point of flat roof or parapet is and actual elevation point is
I certify that the above height measurements are correct and the above project:
O IS in compliance with the City -approved plans.
OIS NOT in compliance with the City -approved plans (Provide explanation).
Please describe any deviation from the City -approved plans on the back of this form.
Surveyor or Civil Engineer's* signature and seal
(Wet stamp and signature required)
* License number of 33965 or lower
Fo=\Bwlding Height Certification 11/02/16
LAND 01/07/2021
MCD SG Date
s
L.S.
9297
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive 1 P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.gov 1 (949) 644-3200
CIVIL ENGINEER'S CERTIFICATION FORM
From:
C&V Consulting, Inc.
Dane P. McDougall
9830 Irvine Center Drive, Irvine, CA 92618
ATTENTION: GRADING ENGINEER, BUILDING DIVISION
Date:
6/28/2021
GPC No.: 2750-2019 Tract/Subdivision/Lot No.: 1 Rough: _Final: X
Project Names: The Isle at Mariner Shores
Owner/Developer: Intracorp Homes
Type of Project: Notes:
X Tract: 18135 X Drainage Phase 1 Homes: Buildings 1 & 2, Units 1-9
_ Commercial _ Other
Industrial
Yardage for Project: Notes:
_ Cut: Borrow:
Fill: _ Export:
I hereby approve the grading for this project in accordance with my responsibilities under the
City Grading Code. I have inspected the project and hereby certify that all areas exhibit positive
surface flow to public ways or City approved drainage devices. The grading has been
completed: 6/28/2021 in conformance with, Precise Grading with the following
changes to the approved grading pian. Plan #2750-2013
Description of Changes:
Company: C&V Consulting, Inc.
Name: Dane P. McDougall ttOf
SS
(print) (sign)
WC
License No.: C 80705 (RCE/LS) 02
W
C
Forms\Civil Engineers Certification Form 9-13
GeoTek, Inc.
1548 North Maple % t Ccmrx Cal lemia 42878
(9S4710-1160 Office (951)710-1167Fax v ,,&.oteku, ,e,,,..
June 21, 2021
Intracwp SW, LLC Project No. 2343 -CR
895 Dove Street Suite 400
Newport Beach, California 92660
Attention: Mr. Ride Puffer
Bhegs I and 2
The Ide at Mariner Shores — Tract No. 18135
1244 Irvine Avenue
City of Newport Beach, Orange County, California
Reverencer See Appendnr A
Dear Mr. Puffer _.._..
On-, earthil construction for the m4xx building pads has been completed in general
accordance with City of Nmvport Beach &ddeknes and the rekrenced geotechinical reports by
GeoTek, Inc. (GeoTek) The services
.r•
these eardr*Of-k OPerabor's for the
subject i i pads, as requested by
fin "as observed
to be Placed as recommended. A report sumrTtarbEirlg the and
observation s- - performed - .
f thetesting
Post grading
, • o at the
project sft can be
The eject building pads are considered suitable for the intended construction from a
geotechnical viewpoint Corhdusions and recommendations presented in the referenced reports
remain valid and applicable.
GEOTECHNICAL I ENVIRONMENTAL I MATERIALS
INTRACORP SW, LLC Project No. 2343 -CR
Final Geotechnical Services Letter, Tract No. 18135 June 21, 2021
City of Newport Beach. County of Orange. California Page 2
LIMITATIONS
Our findings are based on site conditions observed and the stated sources. Thus, our comments
are professional opinions that are limited to the extent of the available data. These opinions
have been derived in accordance with current City/Courcy standards of practice and no warranty
is expressed or implied. Standards of practice are subject to change with time.
The opportunity to be of service is sincerely appreciated. If you should have any questions,
please do not hesitate to call our office -
Noek C. Toney
PE 84700, Exp. 03/31/22
Project Engineer
C64700 ExPMV2ZZ
CVrajeaA2 i to 235N2343LR towoazrP SW A4wkw's Sw¢ Pmjea Troa Na 18 131 Newport BeadyVF d Service Lm!AZ 43Qt
Feud Gestedcd Serriaa L&A*ng L aid 2 Traa No. 18135-&a
GE®TEK
PROJECT STATUS REPORT CaICERTS, Inc
Effective 07/21/2021 13:04 (Pace 1 of 3)
HERS Provider CaICERTS Inc.
CA Building Energy Efficiency Standards 2016 Residential Compliance goo 2015
Energy Standards Code Year:
2016
Project
Name:
The Isle -Mariner Shore (Mariner Square)
�.
■ Z
Project Type:
New Construction SFR
Address:
1237 Winslow Lane
City/State/Zip:
Newport Beach / CA / 92660
L
■ �
Enforcement Agency:
City of Newport Beach
■
Permit Number:
2019_3999
Easy to Verify @ calcerts.com
OVERALLSTATUS
COMPLETE
HERS VERIFIABLE MEASURES:
COMPLETE
.r ,;f f �� � YIi N ri
INFORMATION Certficatefof Comphaice Lists
1
(Document Required Enerrgy Features) „i
X
Certificate Type
Compliance
Registered Form
CF1R-PRF-01,
Registered Date
2020-05-22 1,0 :49:42
Registration
57 L
0"�
f 1 �- �` 'r
219-P010253480D=--,000-000-00 00000-000
J °
Number
ONAL CP
Rs r, f
3 '�a
9
ti
tem
s.^..iYu<}nn s" n�
r f f
Fortny Regliftred Date 4 Re Number
v i
lshaiion
t - .3t
'NOW,
CF1R-SRA-01
2021-07-20 17:23:03
219-PO102534BOD-RO1001A
CF1R-SRA-01
2021-07-20 17:23:03
219-PO1025348OD-RO1002A
CF1R-SRA-01
2021-07-20 17:23:03
219-PO1025348OD-RO1003A
CF1R-SRA-01
2021-07-20 17:23:03
219-PO1025348OD-RO1004A
CF1R-SRA-02
2021-07-20 17:23:03
219-PO1025348OD-RO2001A
CFIR-SRA-02
2021-07-20 17:23:03
219-PO1025348OD-RO2002A
CF1R-SRA-02
2021-07-20 17:23:03
219-P01025348OD-RO2003A
CF1R-SRA-02
2021-07-2017:23:03
219-PO1025348OD-RO2004A
(1/)
res
HERS Provider CaICERTS Inc.
CA Building Energy Efficiency Standards 2016 Residential Compliance goo 2015
CITY OF NEWPORT BEACH Phase 1 - Units 1-9
Community Development Department i Building Division
100 Civic Center Dr.1 P.O. Box 1768 1 Newport Beach, CA 92658
www.newportbeachca.gov 1 (949) 644-3200
cALGREEN DOCUMENTATION COMPLIANCE CERTIFICATION
ADDRESS: 1237, 1239, 1241, 1233, 1231, 1229, 1223, 1225, 1227'ERMIT NO.: X2019-3996/3999
ins ow ane
THIS FORM SHALL BE COMPLETED AND SIGNED PRIOR TO REQUEST FOR FINAL BUILDING
INSPECTION. ONE COPY OF THIS FORM SHALL BE SUBMITTED TO THE BUILDING INSPECTOR AT
FINAL INSPECTION AND ONE SHALL BE PROVIDED TO THE BUILDING OWNER AS PART OF THE CAL
GREEN CERTIFICATION PACKAGE.
The following section shall be completed by a person with overall responsibility for the planning and
design portion of the project.
REQUIRED DOCUMENTATIONS PROVIDED TO THE PROPERTY OWNER(S)
13 Franchise Hauler for Construction/Demolition Waste (65% min. reuse of nonhazardous waste)
® VOC Contents Limitation
[3 Formaldehyde Emissions Limitation
M T-24 Energy Certificate of Installations (Env., QII, Lighting, Photovoltaic, Ill Plumb.)
M T-24 Energy Certificate of Verifications or Acceptance( Env., QII, Lighting, Photovoltaic, Mech.,
Plumb., HERS)
12 Operations and Maintenance Manual
MOISTURE CONTENT OF BUILDING MATERIAL (RESIDENTIAL CONSTRUCTION ONLY)
01 1 certify that the moisture content of the wall and floor framing is less than 19 percent as
determined in accordance with Section 4.505.3 of CAL Green prior to being enclosed.
DECLARATION STATEMENT
• 1 certify under penalty of perjury, under the laws of the State of California, the information
provided is true and correct.
• 1 certify that the installed measures, materials, components, or manufactured devices identified
on this certificate conform to all applicable codes and regulations, and the installation is
consistent with the plans and specifications approved by the enforcing agency.
Name: i Responsible Person's Signature:
Emilie Simard
Date Signed:
5/2/22
Forms\CALGreen Documentation Compliance Cert Form 1-2017