HomeMy WebLinkAboutPV2022-161 - CalcsPV202°2-� iw/ i
M Monnonr
z
Date: 05/20/2022
Job Number: 7256
Prepared for: Sun Solar Energy Solutions, 4085 E La Palma Ave. Suite B Anaheim, CA 92807
Project.: Katkin Residence , 2500 Marino Dr, Newport Beach, CA, 92663
The following calculations are for the structural engineering design of the photovoltaic panels and are
valid only for the structural info referenced in the stamped plan set. The verification of such info is the
responsibility of others. After review, I certify that the roof structure has sufficient structural capacity for
the applied PV loads. All PV mounting equipment shall be designed and installed per manufacturer's
approved installation specifications.
Engineerinc.io
303 N Glenoaks Blvd Suite 200
Burbank, CA 91502
(747) 333 - 5991
new@engineerinc.io
Exp. -Date : 03/31/2024
Date Certified and
Signed: 05/20/2022
YR rta
y ne
NOISI/1la ONIa'llne
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 1 (747)333.5991 1 new@engineerinc.io
Solar Module Details
Module Type Sunpower
Module Quantity - 30
Module Model Number 425 watt
Design Criteria
Code: 2019 California Building Code ASCE 7-16
Live Load (pat) 20
Ult Wind Speed (mph) 120
Exposure Cat C
Ground Snow (pat) 20
Structure Geometry
Eave Height, he (ft)
15 to 20ft
Pitch of main roof (deg)
26
Building Length; L (ft)
85
Building Width, B (ft)
60
Roof Area (Module Area) ft2
5100.00
NOTE: attachments should be installed in a staggered configuratiion to properly destributor loading.
Roof Properties
Roof Geometry type
,,.,... Roof Type
Roof Pitch (deg)
Gable Roof
Truss
26
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 1 (747)333-5991 1- new@engineerinc.io
Roofing Type
Sheathing Type
Wood species
Wood Fb (psf)
Wood Fv (psf)
Wood E (psf)
Purlin C/C Spacing (in)
Rafter C/C. Spacing (in.)
Purlin
Section Thickness, b.(in.)
Section Depth, d (in.)
Rafter
Comp Shingles
1/2" OSB Board
No. 2, Douglas Fir -Larch
900
180
1600000
12
24
2
4
Section Thickness, b (in.) 2
Section Depth, d.(in.) 6
Maximum Rafter Span (ft) 11
Factors
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 1 (747)333-5991 1 new@engineerinc.io
�s„
Dead Load(psf)
Comp Shingles
3.00 psf
1/2" OSB Board
2.00 psf
Insulation
2.00 psf
Total Roof 1DL
7 psf
No. 2, Douglas Fir -Larch 131.00IWO
Solar Panel DL 13.00
psf
Roof 1
Roof Dist DL
7.00 psf
M Roof Dist DL
8704.74
Def Roof Disb DL
3.30
PV unl Dist DL
3.00 psf
M PV uni Dist DL
39.02
Def PV uni Dist DL
0.01
Total Uni DL
11.00 psf
M Total DL
8743.76
Def Total DL
3.31
Snow Load(psf)
Ground Snow Load, pg 20
Importance Factor, Ic 1
Thermal Factor, Ct 1
Exposure Factor, Ce 1
Flat roof snow, pF 20
Slope Factor, Cs 1
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 1 (747)333-5991 1 new@engineerinc.io
Sloped Row Snow, ps 20
Uni Dist_S
20.00
M uni Dist s
302.50
Def uni Dist_S
0.11
Wind Load
Ultimate Wind Speed
120
- Directionality Factor,kd
0.85
Topographic factor
1..00
Velocity pressure exposure factor,kz
0.88
Ground Elevation Factor,ke
1.04
Side Wall Width
60
Median Roof Height
88.23
Velocity pressure,qz
27.57
External Pressure Up,GCp_7
-0.46
External Pressure Up,GCp 2
-0.6
External -Pressure -Up,GCp 3
-1.3
External Pressure Down,GCp
0.04
Design Pressure Up,p 1
-10.60
Design Pressure Up,p_2
-13.83
Design Pressure Up,p 3
-29.96
Design Pressure Up,p
0.92
Uni_Dist_W_up -
-29.96
M uni Dist W up
-453.15
Def_uni_Dist_W_up
-0.17
Uni Dist W down
0.92
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 1 (747)333-5991 1 new@engineerinc.io
C�1NC
M_uni_Dist_W_down 13.92
Def uni_Dist W_down 10.01
Lag Screw Uplift Check (ASD)
5/16" Lag Screw Withdrawl value
205.00 Win
Lag Screw Penetration
2.50 in
Roof1 0.6D+0.6W(up z1)
3792.072 > 512.5
Roof1 0.6D+0.6W(up z2)
3790.134 > 512.5
Framing Check (ASD):
Roof1 uni 1.OD+0.6W
8752.11 > 1020.94
Lag Screw Penetration
8976.90 > 1020.94
Roof1 0.6D+0.6W(up z1)
9046.26 > 733.80
Roof1 0.6D+0.6W(up z2)
4974.37 > 1020.94
Seismic Check:
Wood
2x4 Studs @ 16"
Gypsum
M isc(i nsulatioon,etc)
Total wall DL
Total Wall Area (Approx)
Total Wall W
Total Roof DL
Total Roof Area (Approx)
Total Roof W
5.00 psf
2.00 psf
3.00 psf
2.00 psf
12.00 psf
2940.00 ftz
35280 Ibs
7.50 psf
1601.97ft2
12014.775 Ibs
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 1 (747)333-5991 1 new@engineerinc.io
h
l�
PV Panel W 3.00 psf
Area of panel 600.00 ft2
Total Roof W 953.97 Ibs
% increase=(Wadditional)/Wexisting 12.16% OK
The increase in weight as a result of the solar system is less than 10% of the existing structure and therefore no further
seismic analysis is required.
Limits of Scope of Work and Liability
Existing structure is assumed to have been designed and constructed following appropriate codes at
time of erection, and assumed to have appropriate permits. The calculations produced are only for the
roof framing supporting the proposed PV installation referenced in the stamped planset and were
completed according to generally recognized structural analysis standards and procedures, professional
engineering and design experience, opinions and judgements. Existing deficiencies which are unknown
or were not observable during time of inspection are not included in this scope of work. All PV modules,
racking', and mounting equipment shall be designed and installed per manufacturer's approved
installation specifications. The Engineer of Record and Engineerinc assume no responsibility for misuse
or improper installation. This analysis is not stamped for water leakage. Framing was determined based
on information in provided plans and/or photos, along with engineering judgement. Prior to
commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the
stamped plans, calculations, and cart letter (where applicable) and notify the Engineer of Record of any
discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing
that was not addressed in stamped plans, calculations, and cart letter (where applicable) and notify the
Engineer of Record of any concerns prior to starting construction. Prior to the commencement of work,
the contractor shall verify the existing roof and framing conditions. Notify Engineerinc and the engineer of
record of any Discrepancies prior to starting construction. Prior to the commencement of work, the
contractor shall inspect framing for any damage such as water damage, cracked framing, etc. and notify
the E.O.R. if any issues are found.These plans/calculations are stamped for structural code compliance
of the roof framing supporting the proposed PV installation reference only. These plans/calculations are
not stamped for water leakage. PV modules, racking, and attachment components must follow
manufacturer guidelines and requirements.
303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 1 (747)3335991 1 new@engineerinc.io
Batteries will be blockaded from
vehicle impact (Position of batteries
are tucked into corner, not accessable
GARAGE LAYOUT to vehicles)
In compliance with CFC 312
20' Clearance
U
C
U
C
N
N
N
N
-6
u
Y
Y
M M
BUILDING DIVISION
J U N - 1 2022
1. Rooms and areas within dwelling units, basements, and attached garages that are currently protected with an automatic fire sprinkler system AND have a
water -flow device that initiates an audible notification for residential occupants will be considered as having met the intent of the code:
a. Section R314.4 of the 2019 CRC requires that the alarm shall be clearly audible in all bedrooms over background noise levels with all intervening doors closed.
This can be accomplished by interconnecting the interior smoke alarms to the water -flow device on the fire sprinkler system riser.
NOTE: Ess shall be protected from vehicle
impact per California Fire Code 1206.11.7.
NOTE: Home includes fire sprinklers.
NOTE: ESS listed and labeled for use in
accordance with UL 9540A.
NOTE: Individual units shall be separated
for each other by at least 6 inches per UL
9540A Testing
NOTE:A 36-inchwide pathway
shall be provided to the emergency
escape and rescue opening.
Roof access is not located in areas that
require placement of ground ladders over
exterior wall openings CRC R331.4.1.
NOTE: Conduit will run through attic
NOTE: ESS shall be located not less than T from
doors and windows directly entering dwelling unit_
CRC R327.4.3
NOTE:
WORKSPACE IN FRONT OF SOLAR
EQUIPMENT SHALL BE MINIMUM 3'
ESS located inside the building
NOTE: Home includes fire sprinklers in garage
where batteries are stored batteries will be
mounted to garage wall.
Batteries will be blockaded from
vehicle impact (Position of batteries
are tucked into corner, not accessable
GARAGE LAYOUT to vehicles)
In compliance with CFC 312
20' Clearance
U
U
N
A
N
N
N
N
Ti
u
Y
Y
3
3
1. Rooms and areas within dwelling units, basements, and attached garages that are currently protected with an automatic fire sprinkler system AND have a
water -flow device that initiates an audible notification for residential occupants will be considered as having met the intent of the code:
a. Section R314.4 of the 2019 CRC requires that the alarm shall be clearly audible in all bedrooms over background noise levels with all intervening doors closed.
This can be accomplished by interconnecting the interior smoke alarms to the water -flow device on the fire sprinkler system riser.
NOTE: Ess shall be protected from vehicle
impact per California Fire Code 1206.11.7.
NOTE: Home includes fire sprinklers.
NOTE: ESS listed and labeled for use in
accordance with UL 9540A.
NOTE: Individual units shall be separated
for each other by at least 6 inches per UL
9540A Testing
NOTE:A 36-inchwide pathway
shall be provided to the emergency
escape and rescue opening.
Roof access is not located in areas that
require placement of ground ladders over
exterior wall openings CRC R331.4.1.
NOTE: Conduit will run through attic
NOTE: ESS shall be located not less than T from
doors and windows directly entering dwelling unit.
CRC R327.4.3
NOTE:
WORKSPACE IN FRONT OF SOLAR
EQUIPMENT SHALL BE MINIMUM 3'
ESS located inside the building
NOTE: Home includes fire sprinklers in garage
where batteries are stored batteries will be
mounted to garage wall.
Batteries will be blockaded from
vehicle impact (Position of batteries
are tucked into corner, not accessable
GARAGE LAYOUT to vehicles)
In compliance with CFC 312
20' Clearance
C
N
N
U
Y
3
in
1. Rooms and areas within dwelling units, basements, and attached garages that are currently protected with an automatic fire sprinkler system AND have a
water -flow device that initiates an audible notification for residential occupants will be considered as having met the intent of the code:
a. Section R314.4 of the 2019 CRC requires that the alarm shall be clearly audible in all bedrooms over background noise levels with all intervening doors closed.
This can be accomplished by interconnecting the interior smoke alarms to the water -flow device on the fire sprinkler system riser.
NOTE: Ess shall be protected from vehicle
impact per California Fire Code 1206.11.7.
NOTE: Home includes fire sprinklers.
NOTE: ESS listed and labeled for use in
accordance with UL 9540A.
NOTE: Individual units shall be separated
for each other by at least 6 inches per UL
9540A Testing
NOTE:A 36-inchwide pathway
shall be provided to the emergency
escape and rescue opening.
Roof access is not located in areas that
require placement of ground ladders over
exterior wall openings CRC R331.4.1.
NOTE: Conduit will run through attic
NOTE: ESS shall be located not less than T from
doors and windows directly entering dwelling unit.
CRC R327.4.3
NOTE:
WORKSPACE IN FRONT OF SOLAR
EQUIPMENT SHALL BE MINIMUM 3'
ESS located inside the building
NOTE: Home includes fire sprinklers in garage
where batteries are stored batteries will be
mounted to garage wall.