CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 NewportBeach, CA 92658-8915
www.newoortbeachca.gov 1 (949) 644-3200
CASE NO.:
❑ REQUEST FOR MODIFICATION TO PROVISIONS
OF TITLE 9 (FIRE CODE) OR TITLE 1$ (BUILDING CODE)
OF THE NEWPORT BEACH MUNICIPAL CODE
(See Reverse for Basis for Approval) (Fee $291)
❑X REQUEST FOR ALTERNATE MATERIAL
OR METHOD OF CONSTRUCTION
(See Reverse for Basis for Approval (Fee $291)
For above requests, complete Sections 1, 2 & 3
below by printing in ink or typing.
ro
FOR STAFF USE ONLY T
Plan Check # Cq 97-741 # of Stories 2:
Occupancy Classification
R 3 "
Use of Building S700
# of Units
ProjectStatus p/a�Ckec/G
Construction Type lie,
!Rh r
Verified try
No. of Items
Fee due im 4Li /
DISTRIBUTION:
❑ Owner
❑ Plan Check
❑ Petitioner.
❑ Inspector
❑ Fire
❑ Other
7 JOB ADDRESS: PETITIONER:
SITE ADDRESS: 2707 Lighthouse Lane Petitioner Brian Wood c/o CJ Light Assoc.
Kyle Nelson rto be emhnc�toi enaine.d
Owner 1401 Quail St., #120
Address 2707 Lighthouse Lane Address (PWtlone
CDM, CA Zip 92629 NB, CA zip 92626
Daytime Phone ( j Daytime Phone (714 ) 803-9533
Email: brian@cilight.net
2 REOUEST: Submit blare if necessary to illustrate reouest. Additional sheets or data may be attached.
2019 CRC Section R703.7.2.1
Position Project Manager
uY,
Petitioner's ga-i6b6d
Signature CA Professional Lic: # 22334 Date: 09-30-21
FOR STAFF USE ONLY
DEPARTMENT ACTION: In accordance with: ❑ CBC 104.11/CFC 104.9 ❑ CBC 104.10/CFC 104.8
(Alternate materials & methods) (CBC Modification)
❑ Concurrence from Fire Code Official is required. ❑ Approved ❑ Disapproved ❑ Written Comments Attached
By: Date
❑ Request (DOES) (DOES NOT) lessen any fire protection requirements.
❑ Request (DOES) (DOES NOT) lessen the structural integrity
The Request is: Granted ❑ Dented (See reverse for appeal information)
❑ Granted (Ratification required)
Conditions of Approval
SignaturePositiorOFiMF Pt RI nImr, ACarnlALata I 2
Print Name
APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse)
(Signature, statement of owner or applicant, statement of reasons for appeal and fling fees are required.) ro
CASHIER RECEIPT NUMBER: 000 t 17 %94
FobnsMotlH 07/01/21
Guidelines for Approval of Alternate Materials. Design and Methods of Construction
Basis For Approval
For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification
or a request for alternate material or method of construction, he/she must determine that special, individual reasons
.exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The
resulting condition must be in conformance with the spirit and purpose of the Code provisions involved and that such
modification does not lessen fire protection, structural integrity or occupant safety. The applicant mustprovide ,
sufficient information with this application to allow the above evaluation to be made.
H
Requirements for Submittals
The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the
applicable data listed below:. -
• State specific code provisions. for which alternative is requested and why request is being submitted.
• Describe by code. section those provisions for which alternative is desired.
• Compare the proposed alternative versus the code requirements in terms of structural strength, suitability,
effectiveness, fire resistance, safety and health impacts affecting the building or user of the building.
• Demonstrate that the proposed alternative is compatible with balance of code requirements.
• When applicable, specify how authoritative. consensus document(s) are used to substantiate proposal.
(Reference draft ICC Building Performance Code Commentary Section 1.4.2.3 for background information).
• Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended
use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods.
• Specify when and where special inspection and testing are required and the standards of acceptance for
demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on the job site.
• Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate. method
to ensure continued compliance.
• State how and where alternate proposal is incorporated within construction plans and prepare plan amendments
as necessary. The design professional has the responsibility to .coordinate all construction documents and
ensure compatibility between documents.
• The report and design documents shall be dated, signed and stamped by the design professional according to
the plan submittal procedure.
• For alternate methods of design requests, the applicant shall set performance criteria for his design.
Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to
start of design.
Alternative Design Review[Verification
The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to
the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to
make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses
the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant to
the Building Division prior to commencing the review.
• Verify that all applicable information and justifications listed above as requirements for submittals is received and
verify that evaluation and design methods used by designer are appropriate to the alternative proposed.
• Verify products are being used in accordance with their listing conditions as required by recognized listing
agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code
and intended use.
• Evaluate performance of material and possible Flaws that could affect performance of material in its installed
state.
• The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative
materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not
satisfied that the applicant has met the conditions, the request should be denied in writing with the applicable
reason(s).
Inspection/Field Verification
The alternate proposal as approved in the construction documents must be verified by inspection, and, where
necessary, testing as follows:
• To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the
manufacturer's .and engineer's installation procedures, inspectors should check product labeling, certification,
quality assurance processes, and testing, as applicable.
• When appropriate, an approved third party quality assurance inspection and testing service may be required for
continuous and complex inspection and testing activities. This is intended to verify that construction complies
with the code and the approved plans..
Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent
may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual
reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to
State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent
to that prescribed by that standards. or that due to legal or physical constraints, compliance with the standards or
providing equivalency would create, an µnregsonap,lerhar hid.
Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You
will be notified in writing of the appeal hearing's. time and date.
WALL FRAMING
(TYPICAL) WEATHER RESISTIVE
BARRIER
(TYPICAL) EXTERIOR PLASTER
TREATED MUDSILL
CORROSION RESISTANT WEEP
FLASHING
d i i • ? HARDSCAPE - SLOPE MINIMUM
d d 2%AWAY FROM BUILDING / TO
• AREA DRAINS. REFER TO
DRAINAGE PLAN
d. 411
CONTINUOUS 12" COPPER / S.S.
FLASHING O/ BITUTHENE (OR
r-- j • 4 EQUIVALENT) MOISTURE
---' d ' BARRIER
4 A
Q .
COMPACTED / NATURAL EARTH
BUILDING FOOTING/
FOUNDATION -REFER TO
4STRUCTURAL DRAWINGS
- 4
EX-WEEP-0004 (W/ SPECIAL FLASHING ADJACENT HARDSCAPE SURFACE)
WEEP 1 WALL BOTTOM
4BVICxB1E
91PYCM1N1 pUwW69
INN
'{
Ip.
nV
wvixEPPE6lanui wwm
oN
N`INNNTm°�a,E
TOP RNL-MATCH
r-wsNxG%EAunuBIE.
yyyw
WwIXEIt
mlcummloRFwnn
MPROPRNTE STYLEM
SELECTED
Irenue
fF
r�
x:
E> REDFYxmwYMEXr
2W, Wax4i
mFwimuuCCu
R
w. •XM'RMXwO
W
NWML
E,
RRACIIEFM2t Sv y
eEwW1EBECYI
niPF�WIHFfNt®
RCafauwwloy tulx
:
v' 4 NLIUSBLVM I%p) 3
gn
""NmxR r"I
¢
IrtM+xaP
2 BMS3%,OREpVPL, AT A 2
y�B aw•nC. MAz m
b
z3
MDMMOE NN.YP
mwPPaxrasxlNauW.
BPn
aca®
P[SIIL'G. `�
RNLIMIgAWc
wn uwEwnaNr.
...� .....:;.
3 ��
BAW8IER68PAGEDTO
II
E
EDMD �N�M °.
fMIWMFARNKKT�I wO
L�
NLINADfpmMGBWI
NWUFaPER
:•' :....u. ii i'.n
'
�.�.:•S.:e•:ll �
MEEf CDDEREpVIRFMENTe��
I
II.VXIN°NFMBPNS
..:: :. �'_f
M9TCXPPPROPRNTE
RmrkRoeFwrvwO
AT PERIMETER OF STAIR ATWALL
--"
aveNreuPxamwAl.
mRuorvwwumlxs
' � •.'•;I I��}
b
,nRpnYrl
FnuuxE-Rvmroro
� W �
mwemRuwwnxm
�X EFMNw
:.::
xww0pwra
amLetuPAE%
,i. ,f...: •.::�;
WPENPNRMiOm
TOPLNS
RWFIPCIM
BIXJCNPUWNMXW
No y
N
p ryWOMuITO'
INAYYF.
NOTER UIMM DEFNLIN4 FOR
CODE RE-0UIflEMENTe.
IpRR6FA l01p]FMVILF.
N:xu.�Pcc1`t'I`RnE
PLAN
PxnuCFVRmTwFwRW'
wwo'aLAEPFm.POCR�Or`w"`a
wPRO°arRwnwAPnoc'�wIwFOPFa
HAMDRAIL
Dm.W
WEEP SCREED n 17
FASCIATOWALL W 9
ROOF TO SIDE WALL
5
TYPICAL RIDGE I HIP
NNIpRYeN00WAwVAeaW1LCPCOXBIPW wABFCLLtlIIa:
R•PB
\J .�
Ip-PF36lro
A
VFMPIP61fM O11 RA
.IRYEnRM,wNW„Da
CpBpyEp�tyllYM0YETIEIFAOE��IIEIPEN..NYLXEFWN�10
IiRF,IGBwP.uu• aE.rowPp
Pp1E,RAn
WNLFPAWX3
PIXRCEIEVIN
4.
is
MARWPPEENnui BNWER
°LLNOannEFE WJINYFHVPIDVFPFGLLYFRCMMEIFI➢IX°rt
LN N PE O
WM09 IafNrteRAV,k
�
��roE1TERIORCIAYOIXp
��'w.�,mNrc�:l
.PECdw9LATOX9
mlVl oTVNN WEER
WT
R�Ma°NawLtaEa°w xuWEue PMl FuartoFmure. xu'MwWBmPUB Maxw
mEM�E�KE
D±PAO
wuR RIN WNNNNNN
vxw vNLEv
a
I.P%T6 NLaNB1EPWIWa. XYGpNIbW1l BE1%VINp06aaECIWYt
n/axxaNOEANnwORON°ixN
NNIFMIENEFNI.fYXFMNP
e¢nwMEEn NN°nN
1PFAYwwC6u
N taNiR°rIDEWPYlFN,N IIII VWYnIX JI.
OFRWFW 6
NWIl1A MIN
API b7 N
uAIbLVRM4a
Np1ICI �
YNVETERBPIRPE
BEPEFp
PtaMM WTIENLS YMNTNTEe�O
- ¢RiOMOXRF&SLYrt EECK
fUCIaNG
IX1E'OYLW�O
N
.WEYFUBXIXO
i NMnMR°PN6aMFORAEDaYME
£
Z°j
gp 0P ENxgli•S.YP
IFATBMp
g1C
y
mm a
0.1PFA06 WfrtW PYLATn1EOPEY&OEOF
BN MOFAMVLBGEBYM
_
IYnW ROfffYYWEm
b
EF
IBTNL xnuanDiNwwi
u...Glw.°>rertlxRmNPFeeixlm
EwnaF 5
'
i A5 Fi `:
IwwW EPEavLN
NappprtuyvuamieEiOPwn
°
wMn�PuimwumpmwceX
uLEv
. W.IPLnxa
i1EHN%PMcwluCpw
W.ELSIMRumuCplam
GF
N
Oma'NBeaROW
�fOPI
sIMmINNIN x�ro°
Wwuvnxw T
4
�amR°OI
ucN
.. .. .,.
RXWI®OPME
wwm` uloWinµe1L
WR .naF
°IFEE'BnwuaeRFtl'Pwar"u.ml nRM°I
_NOm'ua'.Tlw
PBI rnmGr
amumuPN
wwm
RT1gIOP°EEuwIHaiTiMW EiudwlcieBloIE D
wwPwNls.
�maEGuwuR.T
_
a
lum NNNiNN ms
a
me
WEEP SCREED
vRoxa 18
HANDRAIL GUARDRAIL NWE 14
PIPE PENETRATION •i> 10
ROOF TO HEAD WALL
6
TYPICAL VALLEY WEX1 2
`I
a1RYE1,MMDR,WwO,
N p a,N RNNEP
mlcummwnPYw,N
..
rtM EDR %P RFN
rY.
0
iPEAiwMupau
FP HI
FLASHING
J611
NNINIIIN. x'q Wl
b
��umwYiDPRmxGT
i PAWCHANNEL
crvwceAWxw
xWImEPavE
FLASHING
N
N..wmoEwlPR�
iw
xB
WEEP SCREED r 19
15
]
ROOF TRANSITION
3
wnumwevE
9LOPET°pRWN
—j
i
/
WICOPPERFXPSIEINGNERb
eR°�nwm�xLixaNRGIaPVE
} . IXIEIYOPFHI6M
/
(tVPopP
r RWFORNN
OWICF4EIpEMCnRUMER
/ i
/ r
OJT
8
mFnimMuusuY
FlwaxxO
/ FLASHY
8
TOBEPIowMDRaN
/ 1 SFPNUTELY
NPFnlnurtwue
:.•.�
ilsnxWa
S'
'C.MW. IpN,ME
aGAA'✓
WALLIPMAPEUFRM
.A
—Y
PNIPMXN :I/ �aN
P
WY,
IREFERTO STRUCNWLLI )
ROOFFRANINO
\
<
I'
RwmwaEvinn LO
a- /
3%MIN6LOPE
WFERroamY=i )
_
NNOTES6
EN`INwaexl ni law.'.
m'
_BEM _ W�Fwwmnn INNNEwI MD
Fes\\
/
III
G�.
. nFIMCntuaE
' EvrreN
wNNISu�ExslpN�INprwvv8W�S
ro
d
wNNR
Rpwo.o OEuwcATllEa..,,...NYE
WPINNVLOGIMXI,NWFBILPB,RMh IXNMBEXIFD Nm TYBVFMY WAIIXNiFA
CMLMOFR4AING
IREFiA iO BTNVCNPALI
NPN VZN MIArt-[00.631MI&IDFMtt WVEpE
.Ad
e,
ISOMETRIC
mxmPFNEmw.lOxauscPwNBxw
PDwn
d;.
b
_ %wPtpFwmwxEreN%m1RR
nEle'EMwtMTaXnwBRDMure MIxRPXn lEwlm,.mnc
%wOwF
EDwENFnLrYa
P'roIX�wui'EP"tWRo".nT°%IFow"o'xnam"xE•�.mwDE"waR'E�EnapFt%naWIwNewm"IwDmPmLrou
I— I---
....
e�rtCNWwPITmUTIRNBYOImxARtmuP/Xp1yEwm
.NRpE FEN"OroL
wwPwE°uro�wv` ar�MElnnD°,wXNeErm'IYxum1w8xAYs"®.
FR%xNEwWnIrE%
eMIxw•,XY<wENEEtE-IXw—Emw.>nuow0°N
to�uFF°.DYD.wIEIXENLDmN�NuuYOrFAIiExBaMBrTwxoN YI.-oENrFRixRrlNrawc
uouY�xL'..
nrow.EnN
"F
�npwG
Y ee
NJ.Im
m
Plcul
V.a,al`PNMTOUND�M,WOecNRR
m..RIXESAJ
NFONAAtnEnpwDuXxI
d a
YB
PPe n3aOENTYX NU XNRG 81NmwM FCR WBi°Lµ4nOipN1 REWXNTEN¢AT
Twl.
NpwW.�T,n
WEEPIWfBOTTOM
20
SIDE WALL DIVERTER • # i6
CHIMNEY FLASHING NEa 12
DRAIN
. 8
ROOF UNDERLAYMENT
•
ww+E 4
I A
C.J. LIGHT
ASSOCIATES
wmrvNuuGlP,upIPFCI
um amlbu•gaM lB%
N..P=.wa,a neb%
Pafl BBI ws
Fm Mfl%I.Illb
U Z I,
Z g 0
Lu H J
O
Lu
LLI 2
J
Z ^
O w
o
J
Lu
Z O
U
DETAILS
CIA N., 2005
S-1.
D.1. 0827-11
D 1.0