Loading...
HomeMy WebLinkAboutPA2022-0204_20220915_Geotechnical Investigation report dated 05-03-2022consultants GEOTECHNICAL INVESTIGATION FOR PROPOSED SINGLE FAMILY DWELLING LOCATED AT 921-925 VIA LIDO SOUD NEWPORT BEACH, CALIFORNIA Presented to: RD Olson Investments Attn: Bob Olson 520 Newport Center Drive, Suite 600 Newport Beach, CA 92660 c/o: Sinclair Associates Architects Inc. Attn: Robert Sinclair, Architect 10956 Weyburn Avenue #200 Los Angeles, CA 90024 Prepared by: EGA Consultants, Inc. 375-C Monte Vista Avenue Costa Mesa, California 92627 ph (949) 642-9309 fax (949) 642-1290 May 3, 2022 Project No. RS382.1 engineering geotechnical applications 375-C Monte Vista Avenue • Costa Mesa, CA 92627 • (949) 642-9309 • FAX (949) 642-1290 PA2022-0204 consultants engineering geotechnical applications May 3, 2022 Project No. RS382.1 Site: Proposed Residential Development: 921-925 Via Lido Soud Newport Beach, California Executive Summary Based on our geotechnical study of the site, our review of available reports and literature and our experience, it is our opinion that the proposed residential development is feasible from a geotechnical standpoint. There appear to be no significant geotechnical constraints on-site that cannot be mitigated by proper planning, design, and utilization of sound construction practices. The engineering properties of the soil and native materials, and surface drainage offer favorable conditions for site re-development. The following key elements are conclusions confirmed from this investigation: A review of available geologic records indicates that no active faults cross the subject property. The site is located in the seismically active Southern California area, and within 2 kilometers of the Type B Newport-Inglewood Fault. As such, the proposed development shall be designed in accordance with seismic considerations specified in the 2019 California Building Code (CBC) and the City of Newport Beach requirements. Foundation specifications herein include added provisions for potential liquefaction on-site per City policy CBC 1803.11-12. SUMMARY OF RECOMMENDATIONS Design Item Mat Slab Foundation: Mat Slab Bearing Pressure: Footing Bearing Pressure Conventional: Passive Lateral Resistence: Coefficient of Friction: Soil Expansion: Soil Sulfate Content: Building Pad Over-Excavation: Sandy Soil Max. Density: Recommendations min. 12 inches with thickened edges (+ 6 inches) with no. 5 bars @ 12" o.c. each way, top and bottom 800 psf 1,750 psf -building, continuous; 2,250 psf -pad footings 200 psf per foot 0.30 Non-Expansive, Cohesionless Beach Sands Negligible min. 2½ ft. below ex. grade, +6" scarify & treat bottom 107.0 pcf @ 11.0 % Opt. Moisture * Concrete building slabs shall be underlain by 1" to 2" of clean sand underlain by a min. 15 mil thick vapor barrier, with all laps sealed, underlain by 4" of ¾-inch gravel (capillary break). Seismic Values (per CBC 2019, ASCE 7-16 -Equivalent Lateral Force Methods): Site Class Definition (Table 1613.5.2) D Mapped Spectral Response Acceleration at 0.2s Period, S5 1.388 g Mapped Spectral Response Acceleration at 1 s Period, S1 0.493 g Short Period Site Coefficient at 0.2 Period, F • 1.2 Long Period Site Coefficient at 1s Period, Fv 1.8 Adjusted Spectral Response Acceleration at 0.2s Period, SMs 1.665 g Adjusted Spectral Response Acceleration at 1s Period, SM1 0.887 g Design Spectral Response Acceleration at 0.2s Period, S05 1.110 g Design Spectral Response Acceleration at 1 s Period, S01 0.592 g PGAm = 0.729 g Note: EGA Consultants recommends the structural engineer review and confinn associated seismic values for the proposed residential development. 375-C Monte Vista Avenue • Costa Mesa, CA 92627 • (949) 642-9309 • FAX (949) 642-1290 PA2022-0204 consultants engineerinJ!, geotechnical applications RD Olson Investments Attention: Bob Olson May 3, 2022 Project No. RS382.1 520 Newport Center Drive, Suite 600 Newport Beach, CA 92660 c/o: Robert Sinclair, Architect Subject: GEOTECHNICAL INVESTIGATION FOR PROPOSED RESIDENTIAL DEVELOPMENT LOCATED AT 921-925 VIA LIDO SOUD (Lido Island) NEWPORT BEACH, CALIFORNIA Dear Team, In accordance with your request and with the 2019 CBC, we have completed our Geotechnical Investigation of the above referenced site. This investigation was performed to determine the site soil conditions and to provide geotechnical parameters for the proposed re-grading and construction at the subject site. It is our understanding that the proposed re-development shall include the demolition of the existing residence and the construction of a new residential dwelling with associated improvements in its place. This report presents the results of the investigation (including Liquefaction Computations) along with grading and foundation recommendations pertaining to the development of the proposed residential development. This opportunity to be of service is appreciated. If you have any questions, please call. Very truly yours, EGA Consultants, Inc. j)LUJL~ DAVID A. WORTHINGTON , CEG 2124 Principal Engineering GeologisUCEO PAU ___ ..:..Sr. r ED David OTthlngt JOHN F. EGGERS Project Geologist * No.CEG21 cc: (3) Addressee CfRTIRED 1 GINEER/N OlOGIS CAL 375-C Monte Vista Avenue• Cost a Mesa, CA 92627 • (949) 642-9309 • FAX (949) 642-1290 PA2022-0204 GEOTECHNICAL INVESTIGATION May 3, 2022 Project No. RS382.1 FOR PROPOSED RESIDENTIAL DEVELOPMENT LOCATED AT 921-925 VIA LIDO SCUD NEWPORT BEACH, CALIFORNIA INTRODUCTION In response to your request and in accordance with the City of Newport Beach Building Department requirements, we have completed a preliminary geotechnical investigation at the subject site located at 921 -925 Via Lido Soud, in the City of Newport Beach (Lido Isle), State of California (see Site Location Map, Figure 1 ). The purpose of our investigation was to evaluate the existing geotechnical conditions at the subject site and provide recommendations and geotechnical parameters for site re- development, earthwork, and foundation design for the proposed construction. We were also requested to evaluate the potential for on-site geotechnical hazards. This report presents the results of our findings, as well as our conclusions and recommendations. SCOPE OF STUDY The scope of our investigation included the following tasks: • Review of readily available published and unpublished reports; • Geologic reconnaissance and document research; • Excavation and sampling of four (4) exploratory borings to a total depth of 11 feet below existing grade (b.g.); • Continuous Cone Penetration Test (CPT) sounding to a depth of 50½ feet below grade (results of the CPT sounding are included herein); • Laboratory testing of representative samples obtained from the exploratory borings; • Engineering and geologic analysis including seismicity coefficients in accordance with the 2019 California Building Code (CBC); • Seismic and Liquefaction analysis and settlement computations (in accordance with California Geological Survey, SP 117 A); • Preparation of this report presenting our findings, conclusions, and recommendations. 2 PA2022-0204 GENERAL SITE CONDITIONS The subject property consists of two adjacent semi-rectangular-shaped bayside lots. The double lot is approximately 40 to 56 ft. wide by 90 to 99 ft. long, located at 921 and 925 Via Lido Soud within the City of Newport Beach, County of Orange. The double lot is located in the far eastern portion of Lido Isle, within the Newport Bay. For the purpose of clarity in this report, the lot is bound by Via lido Soud to the north, by a seawall and Newport Bay to the south, and by similar residential dwellings to the east and west. The Pacific Ocean is located approximately ½-mile to the southwest, across the central portion of the Balboa Peninsula (see Site Location Map, Figure 1 ). The subject lot consists of a relatively flat, planar lot with no significant slopes on or adjacent to the site. Currently, the lots are occupied by two (2), two-story residences situated on a graded level pads. Both of the buildings have front yard, attached, two- car garages accessed by Via lido Soud. All structures are supported on continuous perimeter footings with slab-on-grade floors. The site is legally described as Lots 318 and 319 of Tract No. 907, M.M. 28/25-36 (APNs 423-281-15 and 423-281-16). The existing property layout (including the Lot Numbers), and adjacent residences are shown in the Plot Plan , Figure 2, herein. PROPOSED RESIDENTIAL DEVELOPMENT Based on preliminary drawings by the project architects with Sinclair Associates Architects, the proposed residential development shall include the demolition of the existing structures, and the construction of a new custom, two-story, single family dwelling with associated improvements. We assume that the proposed building will consist of wood-frame and masonry block construction or building materials of similar type and load. The building foundations will consist of a combination of isolated and continuous spread footings. Loads on the footings are unknown, but are expected to be less than 2,250 and 1,750 pounds per square foot on the isolated and continuous footings, respectively. If actual loads exceed these assumed values, we should be contacted to evaluate whether revisions of this report are necessary. It is our understanding that the grade of the site is not expected to vary significantly. Based on the digital elevation model by NOAA National Centers for Environmental Information (NCEI -NAVD88, Last Modified September 23, 2016), the site elevation is approximately 14 ft. above MSL (see reference No. 10). Based on the preliminary plans, the proposed finish floor elevation shall be 9+ ft. above mean sea level (MSL) to conform with City and United States FEMA flood elevation requirements. 921-925 Via Lido Soud. Newport Beach (Lido Isle), CA Soils Report -Proposed Custom Home Project No. RS382. I May 3. 2022 3 PA2022-0204 Note: The precise determination, measuring, and documenting of the site elevations, hub locations, property boundaries, etc., is the responsibility of the project licensed land surveyor. No basement or retaining walls are planned. SUBSURFACE EXPLORATION Our subsurface exploration consisted of the excavation of four (4) exploratory borings (8-1 through 8-4) to a maximum depth of 11 feet below grade (b.g.) and one CPT probe (CPT-1 ) to a depth of 50½ b.g. (continuous soil profile). Prior to drilling, the underground detection and markup service (Underground Service Alert of Southern California) was ordered and completed under DigAlert Confirmation. Representative bulk and relatively undisturbed soil samples were obtained for labora- tory testing. Geologic/CPT logs of the soil boring/probes are included in Appendix A. The borings were continuously logged by a registered geologist from our firm who obtained soil samples for geotechnical laboratory analysis. The approximate locations of the borings are shown on Figure 2 (Plot Plan). Geotechnical soil samples were obtained using a modified California sampler filled with 23/a inch diameter, 1-inch tall brass rings. Bulk samples were obtained by collecting representative bore hole cuttings. Locations of geotechnical samples and other data are presented on the boring logs in Appendix A. The soils were visually classified according to the Unified Soil Classification System. Classifications are shown on the boring logs included in Appendix A. LABORATORY TESTING Laboratory testing was performed on representative soil samples obtained during our subsurface exploration. The following tests were performed: * * * * Dry Density and Moisture Content (ASTM: D 2216) Soil Classification (ASTM: D 2487) Direct Shear (ASTM: D 3080) Maximum Dry Density and Optimum Moisture Content (ASTM: D 1557) 921-925 Via Lido Soud. Newpon Beach (Lido Isle). CA Soils Rcpon • Proposed Custom Home ProJect No. RS382 I May 3. 2022 4 PA2022-0204 * * 200 Wash Sieve Analysis (ASTM: D 1140) Sulfate Content (CA 4 17, ACI 318-08, Table 4.2.1) All laboratory testing was performed by our sub-contractor, G3SoiIWorks, Inc., of Costa Mesa, California. Geotechnical test results are included in Appendix B, herein. SOIL AND GEOLOGIC CONDITIONS The site soil and geologic conditions are as follows: Seepage and Groundwater According to the Orange County Water District (OCWD), there are no water wells located within the general vicinity of the subject bayside lot. The Pacific Ocean is located approximately ½ mile to the southwest, across the Balboa Peninsula. Seepage or surface water ponding was not noted on the subject site at the time of our study. Our data indicates that the groundwater encountered is subject to significant tidal fluctuations. Groundwater was encountered in our test excavation at depth of approximately 9 to 9½ feet below grade. Based on our review, the groundwater highs approach the tidal highs in the bay, and groundwater lows drop slightly below mean sea level. From a construction standpoint, any excavations advanced down to within the tidal zones should be expected to experience severe caving. A tidal chart typical for March 21 , 2022, is presented as Figure 4, herein. Lido Isle Topography and Bathymetry Elevations across the isle range from 10 feet along the bulkhead lines at the seawall perimeters; ascending to almost 17 feet near the central backbone of the isle. From the bulkhead shorelines, the near-shore bay floor slopes descends at an inclination of approximately 10: 1 (horizontal to vertical). down to approximate elevations of -10 to -12 feet along the channel limit line (depending on tidal fluctuations). Lido Isle and Newport Bay History Similar to surrounding islands in the Newport Bay (e.g. Linda Isle, Bay Island, and Balboa Island), Lido Isle's surface is primarily man-made (graded approx. 10 921-925 Via Lido Soud, Newport Beach (Lido Isle), CA Soils Repon -Proposed Custom Home PrOJCCI No. RS382. I May 3, 2022 5 PA2022-0204 ft. above the high-tide zone in the 1930's). However, the isle feature is located on a naturally-formed, subaqueous, back-barrier coastal landmass. It is situated on the landward side of a coastal bar formed by a transgressive sea and littoral currents at the seaward edge of a stream delta or lagoon. The Newport Bay coastal estuary was originally formed as the lower reach of the Santa Ana River. However, in 1915, due to severe silting that resulted from flooding of the Santa Ana River (and also the construction of man-made channel), the Santa Ana River was structurally realigned. Consequently, the Newport Bay is currently fed only by the San Diego Creek which drains a comparatively small area. The mouth of the San Diego Creek is located at the Jamboree Road bridge roughly 6 kilometers northeast of the subject site (Upper Back Bay). Geologic Setting Regionally, the site is located within the western boundary of the Coastal Plain of Orange County. The Coastal Plain lies within the southwest portion of the Los Angeles Basin and consists of semi-consolidated marine and non-marine deposits ranging in age from Miocene to recent. The western boundary of the Coastal Plain, in which the site is located, is referred to as the Tustin Plain. It is bound by the Santa Ana Mountains to the northeast and the San Joaquin Hills to the southeast. Based on available geologic maps the site is underlain by a thin mantle of estuarine/hydraulic sands and/or engineered fill. The shallow soil layer is underlain by Quaternary-age old paralic/terrace deposits (Qop/Qtm) which are described as medium dense to very dense, oxidized, fine to medium grained, moderately to well-cemented sand, silty sand and thin silt/clay layers (see reference No. 2). The old paralic/terrace deposits are underlain by massive bedrock of the Monterey Formation (Tm). Roadside exposures of massive bedrock of the Monterey Formation (Tm) are visible on the inland side of East Pacific Coast Highway less than ½ mile north of the site (Dover Shores bluffs). A Geologic Map is presented as Figure 3, herein (reference: Morton, D.M., and Miller, F.K., 2006). Based on the geologic map (Figure 3) correlation with the CPT probe advanced on April 27, 2022, bedrock of the Monterey Formation (Tm) was likely encountered approximately 22 feet below grade. Faulting A review of available geologic records indicates that no active faults cross the subject property (reference No. 2, and Figure No. 3). 921-925 Via Lido Soud, Newporl Beach (Lido Isle), CA Soils Rcporl -Proposed Custom I Jome Project No. RS382. I May 3, 2022 6 PA2022-0204 Seismicity The seismic hazards most likely to impact the subject site is ground shaking following a large earthquake on the Newport-Inglewood (onshore), Palos Verdes (offshore), San Joaquin Hills Blind Thrust, Whittier-Elsinore, or Cucamonga Faults. The site is primarily underlain by fill and beach sands with thin layers of silt/clay. For design purposes, two-thirds of the maximum anticipated bedrock acceleration may be assumed for the repeatable ground acceleration. The effects of seismic shaking can be mitigated by adhering to the 2019 California Building Code or the standards of care established by the Structural Engineers Association of California. With respect to this hazard, the site is comparable to others in this general area in similar geologic settings. The grading/building specifications outlined in this report are in part, intended to mitigate seismic shaking. Based on our review of the "Seismic Zone Map," issued by the State of California, there are no mapped earthquake landslide zones on the site. The proposed development shall be designed in accordance with seismic requirements contained in the 2019 CBC as adopted by the City of Newport Beach building codes. Based on Chapter 16 of the 2019 CBC and on Maps of Known Active Near- Source Zones in California and Adjacent Portions of Nevada (ASCE 7-16 Standard), the site shall be designed using the following seismic parameters: 201 9 CBC Seismic Design Parameters (Equivalent Lateral Force Method) SITE ADDRESS 921 925 Y-Ld S d N B h CA -,a 1 0 OU , ewport eac, Site Latitude (Decimal Degrees) Site Longitude (Decimal Degrees) Site Class Definition Mapped Spectral Response Acceleration at 0.2s Period, Ss Mapped Spectral Response Acceleration at Is Period, S1 Short Period Site Coefficient at 0.2 Period, Fa Long Period Site Coefficient at Is Period, Fv Adjusted Spectral Response Acceleration at 0.2s Period, SMs Adjusted Spectral Response Acceleration at Is Period, SM1 Design Spectral Response Acceleration at 0.2s Period, Sus Design Spectral Response Acceleration at Is Period Su1 921-925 Via Lido Soud. Newport Beach (I .ido Isle). CA Soils Report -Proposed Custom I lomc Project No. RS382 I May 3. 2022 7 33.6090558 -117.910444 D I .388 g 0.493 g 1.2 1.8 1.665 g 0.887 g 1.110 g 0.592 g PA2022-0204 In accordance with the USGS Design Maps, and assuming Site Class "D", the mean peak ground acceleration (PGAm) per USGS is 0.729 g. The stated PGAm is based on a 2% probability of exceedance in a 50 year span (see copies of the USGS Design Maps Detailed Report, Appendix D, herein) EGA Consultants recommends the structural engineer review and confirm associated seismic values for the proposed residential development. FINDINGS Subsurface Soils As encountered in our test borings, the site is underlain by hydraulic fill sands and native materials as follows: Fill (Af) Fill sands were encountered in each of the borings to a depth of approximately 2½ feet below ground. The fill soils consist generally of tan brown, dry, loose to medium dense, fine-to medium-grained sand with shell fragments and gravel. T~e expansion potential of the fill soils was judged to be "non-expansive" when exposed to an increase in moisture content. Based on the laboratory results dated March 30, 2022, the site maximum dry density is 107.0 pct at an optimum moisture content of 11 .0% (per ASTM D 1557). The complete laboratory reports are presented in Appendix B, herein. Estuarine-Native Sands (Qes), Paralic Deposits (Qop) and Bedrock (Tm) The fill materials are hydraulic and native sands as encountered in each of the test borings (B-1, B-2, B-3, B-4, and CPT-1). The native sands consist generally of grayish brown , moist to saturated, medium dense to dense, non-cemented , fine-to medium-grained, silty sand with mica and shell fragments. A thin layer (less than 12" thick) of silts/clays was encountered at approximately 10 feet below grade (below the water table, unable to obtain drive sample). The native sands are underlain by old paralic/terrace (Qop/Qtm) deposits, which are underlain by Monterey Formation (Tm) bedrock consisting of medium dense to very dense sand and siltstone to the maximum depths explored (50½ ft. b.g.). Based on the geologic map (Figure 3) correlation with the on-site CPT probe advanced on April 27, 2022, bedrock of the Monterey Formation (Tm) was likely encountered approximately 22 feet below grade. 921-925 Via Lido Soud, Newport Beach (Lido Isle), CA Soils Report -Proposed Custom Home Project No RS382. I May 3, 2022 8 PA2022-0204 LIQUEFACTION ANALYSIS (Per SP117 A) Liquefaction of soils can be caused by strong vibratory motion in response to earthquakes. Both research and historical data indicate that loose, granular sandy soils are susceptible to liquefaction, while the stability of rock, gravels, clays, and silts are not significantly affected by vibratory motion. Liquefaction is generally known to occur only in saturated or near saturated granular soils. The site is underlain by fill/eolian sands, old paralic deposits, and bedrock of the Monterey Formation. It is our understanding that the current City policy, has assigned a seismic settlement potential of one (1 .0) inch in the upper ten feet, and three (3.0) inches for soil depths of ten to fifty feet. In the event settlement values exceed these threshold values, then additional analysis and/or additional mitigation is required. The CPT testing was performed in accordance with the "Standard Test Method for Performing Electronic Friction Cone and Piezocone Penetration Testing of Soils," (ASTM 05778-12). The seismically induced settlement for the proposed structure was evaluated based on the "Soil Liquefaction During Earthquakes" by I.M. Idriss and R.W. Boulanger, dated September 8, 2008. The analysis was provided by four 11-feet deep 4 " diameter hand-auger borings, and a 50+ feet deep 1.7" diameter CPT probe advanced on April 27, 2022. The exploratory borings and probe locations are shown in the Plot Plan, Figure 2, herein. The computations and results of our Liquefaction Analysis, based on CPT blow counts of Boring CPT-1, are attached in Appendix D, herein. The seismically induced settlement analysis was evaluated based on methods published in the references Nos. "a" through "j" (see "Associated References", herein). The liquefaction and seismic settlement calculations indicate seismic settlement (includes dry and saturated sands) in the upper 50 feet is less than 3 inches, and less than 1.0 inch in the upper 10 feet (pre and post soil cement treatment -see Page 5 of Plate A) and hence shallow mitigation methods for liquefaction may be implemented per City Code Policy (No. CBC 1803.5.11-2 last revised 7/3/2014). Based on our liquefaction analysis, and in accordance with the City of Newport Beach Policy No. CBC 1803.5.11 -12 (NBMC, Chapter 15), we recommend the following mitigative methods to minimize the effects of shallow liquefaction: a. Remedial Grading via Soil Cement in Upper 3 feet -See Page 11, below b. Mat Slab Foundation -see Page 12, below The soil densification via soil cement and the mat slab foundation specifications 921-925 Via Lido Soud, Newport Beach (Lido Isle), CA Soils Report -Proposed Custom Home Project No. RS382. I May 3, 2022 9 PA2022-0204 outlined below will act to decrease the potential settlement due to liquefaction and/or seismically induced lateral deformation to tolerable amounts. The above specifications eliminate the use of piles and associated construction vibrations and groundwater displacement induced by caisson drilling or pile-driving. If the above specifications are incorporated, the proposed structure shall be stable and adequate for the intended uses and the proposed construction will not adversely impact the subject or adjacent properties. Other Geologic Hazards Other geologic hazards such as landsliding, or expansive soils, do not appear to be evident at the subject site. CONCLUSIONS Based on our geotechnical study of the site, our review of available reports and literature and our experience, it is our opinion that the proposed improvements at the site are feasible from a geotechnical standpoint. There appear to be no significant geotechnical constraints on-site that cannot be mitigated by proper planning, design, and utilization of sound construction practices. The engineering properties of the soil and native materials, and the surface drainage offer favorable conditions for site re- development. RECOMMENDATIONS The following sections discuss the principle geotechnical concerns which should be considered for proper site re-development. Earthwork Grading and earthwork should be performed in accordance with the following recommendations and the General Earthwork and Grading Guidelines included in Appendix C. It is our understanding that the majority of grading will be limited to the re-grading of the building pad for the proposed construction. In general, it is anticipated that the removal of the upper 2½ feet (plus 6 inches of scarification) within the building footprint (slab-on-grade portion) will require removal and recompaction to prepare the site for construction. The removals should be accomplished so that all fill and backfill existing as part of the previous site use and demolition operations are removed. Where feasible, the limits of the pad fill shall be defined by a 3 foot envelope encompassing the building footprint. Care should be taken to protect the adjacent property improvements. A minimum one foot thick fill blanket should be placed throughout the exterior improvements (approaches, parking and planter areas). The fill blanket will be 921-925 Via Lido Soud, Newport Beach (Lido Isle), CA Soils Report -Proposed Custom Home Project No. RS) 82. I May 3, 2022 10 PA2022-0204 achieved by re-working (scarifying) the upper 12 inches of the existing grade. Remedial Grading -Soil Cement Due to in situ granular, cohesionless sands, we recommend a minimum eight (8) pallets (40 bags dry mix, each weighing 94 pounds and approximately 1.33 cubic yards) of Portland cement be blended into the newly-placed fill. The first application of the Portland Cement shall be placed on the bottom of the scarified over-excavation(s). This option may be eliminated or reduced if suitable import fills are trucked-in. Site Preparation Prior to earthwork or construction operations, the site(s) should be cleared of surface structures and subsurface obstructions and stripped of any vegetation in the areas proposed for development. Removed vegetation and debris should then be disposed of off-site. A minimum of 2½ feet of the soils below existing grade will require removal and recompaction in the areas to receive building pad fill. Following removal and scarification of 6 inches, the excavated surface should be inspected by the soils engineer or his designated representative prior to the placement of any fill in footing trenches. Holes or pockets of undocumented fill resulting from removal of buried obstructions discovered during this inspection should be filled with suitable compacted fill. The on-site soils are suitable for reuse as compacted fill, provided they are free of organic materials, debris, and materials larger than four (4) inches in diameter. After removal of any loose, compressible soils, all areas to receive fill and/or other surface improvements should be scarified to a minimum depth of 12 inches, brought to at least 2 percent over optimum moisture conditions and compacted to at least 90 percent relative compaction (based on ASTM: D 1557). If necessary, import soils for near-surface fills should be predominately granular, possess a very low expansion potential, and be approved by the geotechnical engineer. Lift thicknesses will be dependent on the size and type of equipment used. In general, fill should be placed in uniform lifts not exceeding 6 inches. Placement and compaction of fill should be in accordance with local grading ordinances under the observation and testing of the geotechnical consultant. We recommend that fill soils be placed at moisture contents at least 2 percent over optimum (based on ASTM: D 1557). We recommend that oversize materials (materials over 4 inches) should they be encountered, be stockpiled and removed from the site. 921-925 Via Lido Soud, Ncwpon Beach (Lido Isle), CA Soils Report -Proposed Custom Home Project No. RS382.1 May 3, 2022 11 PA2022-0204 Trench Backfill The on-site soils may be used as trench backfill provided they are screened of rock sizes over 4 inches in dimension and organic matter. Trench backfill should be compacted in uniform lifts (not exceeding 6 inches in compacted thickness) by mechanical means to at least 90 percent relative compaction (ASTM: D 1557). Geotechnical Design Parameters The following Geotechnical parameters may used in the design of the proposed structure (also, see "Liquefaction Analysis" section, above): Mat Foundation Design Mat slabs founded in compacted fill or competent native materials may be designed for an allowable bearing value of 1,000 psf (for dead-plus-live load). These values may be increased by one-third for loads of short duration, including wind or seismic forces. The actual design of the foundation and slabs should be completed by the structural engineer. MIN. DESIGN ITEM Mat foundations: allowable bearing pressure: passive lateral resistence: mat slab thickness: steel reinforcement: coefficient of friction: Modulus of Subgrade Reaction: RECOMMENDATIONS 800 psf 200 psf per foot min. 12 inches with thickened edges (+ 6 inches) no. 5 bars@ 12" o.c. each way, top and bottom 0.30 ks = 90 lbs/in3 For mat slabs, we do not recommend expansion or felt joints be used. Reinforcement requirements may be increased if recommended by the project structural engineer. In no case should they be decreased from the previous recommendations. Conventional Foundations (outside the mat slab, if applicable) For potential auxiliary structures in or outside the mat slab, if applicable, on properly compacted fill: all continuous or isolated pad footings should be a minimum of 24 inches deep (measured in the field below lowest adjacent grade). Footing widths shall me an minimum 15 inches. At this depth (24 inches) footings founded in fill materials may be designed for an allowable bearing value of 1,750 and 2,250 psf (for dead-plus-live load) for continuous wall and isolated spread footings, respectively. These values may be increased by one-third for loads of short duration, including wind or seismic forces. 921-925 Via Lido Soud, Newport Beach (Lido Isle). CA Soils Report -Proposed Custom Home Project No. RS382. l May 3, 2022 12 PA2022-0204 If applicable, continuous perimeter footings should be reinforced with No. 5 rebar (two at the top and two at the bottom). Reinforcement requirements may be increased if recommended by the project structural engineer. In no case should they be decreased from the previous recommendations. Interior Slabs-on-grade -conventional Concrete slabs cast against properly compacted fill materials shall be a minimum of 5 inches thick (actual) and reinforced with No. 4 rebar at 12 inches on center in both directions. The slabs shall be doweled into the footings using No. 4 bars at 24 inches on center. The reinforcement shall be supported on chairs to insure positioning of the reinforcement at mid-center in the slab. Some slab cracking due to shrinkage should be anticipated. The potential for the slab cracking may be reduced by careful control of water/cement ratios. The contractor should take appropriate curing precautions during the pouring of concrete in hot weather to minimize cracking of slabs. We recommend that a slipsheet (or equivalent) be utilized if crack-sensitive flooring is planned directly on concrete slabs. All slabs should be designed in accordance with structural considerations. Capillary Break Below Interior Slabs In accordance with the 2019 California Green Building Standards Code Section 4.505.2.1, we provide the following building specification for the subject site (living area slabs): New concrete building slabs shall be directly underlain by 1 to 2 inches of clean sand, underlain by a min.15 mil-thick moisture barrier (e.g. "Stego Wrap"), with all laps sealed, underlain by 4 inches of ½-inch or larger clean gravel. Cement Type for Concrete in Contact with On-Site Earth Materials Concrete mix design should be based on sulfate testing with Section 1904.2 of the 2019 CBC (in the event of soil import, soils shall be tested a specified accordingly). Preliminary laboratory testing indicates the site soils possess negligible sulfate exposure, 5 ppm. ACI 318 BUILDING CODE-Table 19.3.1.1 REQUIREMENTS FOR CONCRETE EXPOSED TO SULFATE-CONTAINING SOLUTIONS Sulfate Water soluble Sulfate (SO,) in Exposure sulfate (SO4 ) in soil water, ppm percent by weight Negligible 0.00 $so.< 0.10 0 .s: so, <150 [SO] 921-925 Via Lido Soud, Newport Beach (Lido Isle), CA Soils Report -Proposed Custom Home Project No. RS382.1 Cement Type -·----- Muy 3, 2022 1 3 Maximum water-Minimum fc' , cementitious material normal-weight ratio, by weight, normal and light weight weight concrete concrete, psi ---------- PA2022-0204 Moderate 0.10 < SO,< 0.20 150<SO,<1500 11,IP(MS), 0.50 4000 [S1] IS(MS),P(MS) l(PM)(MS), l(SM)(MS) Severe 0.20 :;; so.< 2.00 1500 < SO,< V 04 5 4500 [S2] 10,000 Very Severe SO4> 2.00 so.> 10,000 V plus 045 4500 pozzalan [S3] As a conservative approach, and due to the marine environment, we recommend cement with a minimum strength f'c of 3,000 psi be used for concrete in contact with on-site earth materials. Settlement Utilizing the design recommendations presented herein, we anticipate that the majority of any post-grading settlement will occur during construction activities. We estimate that the total settlement for the proposed structure will be on the order of 1 inch. Differential settlement is not expected to exceed ½ inch over 20 feet. These settlement values are expected to be within tolerable limits for properly designed and constructed foundations. Lateral Load Resistance Footings founded in fill materials may be designed for a passive lateral bearing pressure of 200 pounds per square foot per foot of depth. A coefficient of friction against sliding between concrete and soil of 0.30 may be assumed. Exterior Slabs-on-grade (Hardscape) Concrete slabs cast against properly compacted fill materials shall be a minimum of 4 inches thick (actual) and reinforced with No. 3 rebar at 18 inches on center in both directions. The reinforcement shall be supported on chairs to insure positioning of the reinforcement at mid-center in the slab. Control joints should be provided at a maximum spacing of 8 feet on center in two directions for slabs and at 6 feet on center for sidewalks. Control joints are intended to direct cracking. Expansion or felt joints should be used at the interface of exterior slabs on grade and any fixed structures to permit relative movement. Some slab cracking due to shrinkage should be anticipated. The potential for the slab cracking may be reduced by careful control of water/cement ratios. The contractor should take appropriate curing precautions during the pouring of concrete in hot weather to minimize cracking of slabs. 921 -925 Via Lido Soud, Newport Reach (Lido Isle), CA Soils Report -Proposed Custom Home Project No. RS382. l May 3. 2022 14 PA2022-0204 Surface Drainage Surface drainage shall be controlled at all times. Positive surface drainage should be provided to direct surface water away from structures and toward the street or suitable drainage facilities. Ponding of water should be avoided adjacent to the structures. Roof gutter discharge should be directed away from the building areas through solid PVC pipes to suitable discharge points. Review of Plans The specifications and parameters outlined in this report shall be considered minimum requirements and incorporated into the Grading, and Foundation Plans if applicable. This office should review the Plans when available. If approved, the geotechnical consultant shall sign/stamp the applicable Plans from a geotechnical standpoint. GEOTECHNICAL OBSERVATION AND TESTING DURING CONSTRUCTION We recommend that a qualified geotechnical consultant be retained to provide geotechnical engineering services, including geotechnical observation/testing, during the construction phase of the project. This is to verify the compliance with the design, specifications and or recommendations, and to allow design changes in the event that subsurface conditions differ from those anticipated. Geotechnical observations/testing should be performed at the following stages: • • • • • During ANY grading operations, including excavation, removal, filling, compaction, and backfilling, etc. After excavations for footings (or thickened edges) and/or grade beams verify the adequacy of underlying materials. After pre-soaking of new slab sub-grade earth materials and placement of capillary break, plastic membrane, prior to pouring concrete. During backfill of drainage and utility line trenches, to verify proper compaction. When/if any unusual geotechnical conditions are encountered . Prior to interior and exterior slab pours to ensure proper subgrade compaction and moisture barriers. Please schedule an inspection with the geotechnical consultant prior to the pouring of all interior and exterior slabs. 921-92S Via Lido Soud, Newport Beach (Lido Isle). CA Soi Is Report • Proposed Custom I Jome Project No. RS382. I May 3, 2022 15 PA2022-0204 LIMITATIONS The geotechnical services described herein have been conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the geotechnical engineering profession practicing contemporaneously under similar conditions in the subject locality. Under no circumstance is any warranty, expressed or implied, made in connection with the providing of services described herein. Data, interpretations, and recommendations presented herein are based solely on information available to this office at the time work was performed. EGA Consultants will not be responsible for other parties' interpretations or use of the information developed in this report. The interpolated subsurface conditions should be checked in the field during construction by a representative of EGA Consultants. We recommend that all foundation excavations and grading operations be observed by a representative of this firm to ensure that construction is performed in accordance with the specifications outlined in this report. We do not direct the contractor's operations, and we cannot be responsible for the safety of others. The contractor should notify the owner if he considers any of the recommended actions presented herein to be unsafe. 921-925 Via Lido Soud. Ncwpon Beach (Lido Isle). CA Soils Report -Proposed Custom Home Project No. RS382. I May 3, 2022 16 PA2022-0204 Associated References re: Liquefaction Analysis a. "Special Publication 117 A: Guidelines for Evaluating and Mitigating Seismic Hazards in California," by the California Department of Conservation, California Geological Survey, dated March 13, 1997; Revised September 11 , 2008. b. "Recommended Procedures for Implementation of DMG Special Publication 117 Guidelines for Analyzing and Mitigating Liquefaction Hazards in California," by G.R Martin and M. Lew, University of Southern California Earthquake Center dated March, 1999. c. "Soil Liquefaction During Earthquakes" by I.M. Idriss and R.W. Boulanger, dated September 8, 2008. d. "Soils and Foundations, 8th Edition," by Cheng Liu and Jack B. Evett, dated August 4, 2013. e. "Evaluation of Settlement in Sands due to Earthquake Shaking" by Kahaji Tokimatsu and H. Bolton Seed, Dated August 1987. f. "Guidelines for Estimation of Shear Wave Velocity Profiles" By Bernard R. Wair, Jason T. Jong, Thomas Shantz Pacific Earthquake Engineering Research Center, Dated December, 2012. g. "Subsurface Exploration Using the Standard Penetration Test and the Cone Penetrometer Test," by J. David Rogers, Environmental & Engineering Geoscience, pp. 161-179, dated May, 2006. h. "Handbook of Geotechnical Investigation and Design Tables" By Burt G Look, Dated 2007. I. "Use of SPT Blow Counts to Estimate Shear Strength Properties of Soils: Energy Balance Approach," by Hiroshan Hettiarachi and Timothy Brown, Journal of Geotechnical and Geoenvironmental Engineering, ASCE, pp. 830-834, dated June, 2009. j. "Standard Test Method for Performing Electronic Friction Cone and Piezocone Penetration Testing of Soils," (ASTM 05778-12), dated 2012. k. "Evaluation of Settlements in Sand Deposits Following Liquefaction During Earthquakes," by Ishihara and Yoshimine, dated 1992. I. "CPT and SPT Based Liquefaction Triggering Procedures" by R.W. Boulanger and I.M. Idriss, dated April 2014. REFERENCES 1. "USGS Topographic Map, 7.5 minute Quadrangle, Newport Beach OE S, California Quadrangle," dated December 12, 2021 . 2. "Geologic Map of the San Bernardino and Santa Ana 30' X 60' Quadrangles, California," Version 1.0, compiled by Douglas M. Morton and Fred K. Miller, dated 2006. 3. "Maximum Credible Rock Acceleration from Earthquakes in California," by Roger W. Reensfelder, dated 1974. 4. Maps of Known Active Fault Near-Source Zones in California and Adjacent Portions of Nevada," prepared by California Department of Conservation Division of Mines and Geology, published by International Conference of Building Officials, dated February, 1998. 5 "Guide for Concrete Floor and Slab Construction," by American Concrete Institute, ACI 302.1 R- 04, dated 2004. 6. "2019 California Green Building Standards Code, CalGreen, California Code of Regulations, Title 24, Part 11 ," by California Building Standards Commission, Effective January 1, 2020. 7. "Seismic Hazard Zone Report for the Newport Beach 7.5-Minute Quadrangles, Orange County, California," by the California Department of Conservation, 1997. 8. "2015 International Building Code," by the International Code Council, dated June 5, 2014. 9. "Geologic Map of California, Santa Ana Sheet," Compilation by Thomas H. Rogers, 1965, fifth printing 1985. 10. "Digital Elevation Model NAVD88 Mosaic," by NOAA National Centers for Environmental Information (NCEI), Created August 20, 2015, last modified September 23, 2016. 921-92S Via Lido Soud, Newport Beach (Lido Isle). CA Soils Report -Proposed Custom Home Project No. RS382. I May 3, 2022 1 7 PA2022-0204 ~ ~-- Lido Isle1 - Reach , .__~ __... , , Linda 'Isle Neivport Channel -I .. _. --Newport BeJJ..Q _....., -.. I -~., I' ---L1uo'ls e ---.I oiver - port Ba Collins Island, 0 ay .,-, ,.______, --Harb-or Bay Island ru Island Reach Ba ---Source: USGS US Topo 7.5-minute map for Newport Beach OE S, CA, Published December 12, 2021. EGA Consultants engineering geotechnical applications SITE LOCATION MAP 921-925 VIA LIDO SOUD NEWPORT BEACH, CALIFORNIA Project No: RS382.l Date: MAY 2022 Figure No: 1 PA2022-0204 -0 CPT-1 VIA LIDO SOUD &? I I 40' 921 Via Lido Soud LOT 318 4385.51 SQUARE FEET 55' 40' -- 925 Via Lido Soud LOT 319 I st .L',._ 4626 46 SQUARE FEET "' -::,,-B-3 56' NEWPORT BAY LEGEND -$-GEOTECH NICAL BORINGS BY EGA CONSULTANTS -0 CONE PENETRATION TEST BY KEHOE TESTING AND ENGINEERING Sources: "Topographic Map, 921 & 925 Via Lido Soud, Newport Beach, CA 92663," by Apex Land Surveying, Inc., dated January 7, 2022. "Preliminary Drawings, 921 & 925 Via Lido Soud, Newport Beach, CA 92663," by Sinclair Associates Architects Inc., undated. EGA Consultants engineering gcotcchnical applications PLOT PLAN 921-925 VIA LIDO SOUD NEWPORT BEACH, CALIFORNIA Project No: Date: Figure No: RS382.1 MAY 2022 2 PA2022-0204 W\'<:i''(_.',:)j Eolian depo_sits (late Holocene)~Active or · · · · · ·· · · recently active sand dune deposits; unconsolidated. [ · qm I Marine deposits (late Holocene)-Active or ~~~ recently active beach deposits; sand, unconsolidated. F·. ·ae~-·,·:, I Estuarine deposits_ (late Holocene)-Sand, silt, · · and clay; unconsolidated, contains variable amounts of organic matter. Qyf I Yo~ng alluvial fan deposits (Holocene and late Ple1stocene)-Gravel, sand, and silt, mixtures, some contain boulders; unconsolidated. Source: Qop I Qvop Tm Old paralic deposits, undivided (late to middle Pleistocene)-Silt, sand and cobbles. lnterfingered strandline, beach, estuarine, and colluvial deposits. Very old paralic deposits (middle to early Pleistocene)-Silt, sand and cobbles on emergent wave-cut abrasion platforms. Capistrano Formation (early Pliocene and Miocene) Siltstone facies-Siltstone and mudstone; white to pale gray, massive to crudely bedded, friable. Monterey Formation (Miocene)-Marine siltstone and sandstone; siliceous and diatomaceous. Morton, D.M., and Miller, F.K. Preliminary Geologic map of the San Bernardino and Santa Ana 30' x 60' quadrangles, California. u.s. Geological Survey. Published 2006. 1:100,000 scale. EGA Consultants engineering geotechnical applications GEOLOGIC MAP 921-925 VIA LIDO SOUD NEWPORT BEACH, CALIFORNIA Project No: Date: Figure No: RS382.1 MAY 2022 3 PA2022-0204 Newport Beach, Newport Bay Entrance, Corona del Mar, CA Tide Chart for March 21, 2022 Moonset 09:00A Moonrise 11:04P .--------------,,-~-----------, 9 Tides.net station (1788) Newport Beach, Newport Bay Entrance, Corona del Mar Monday, March 21, 2022 Sun 6:53am-7:04pm low tide 6:02am {0.07ft) high tide 12:07pm (3.82ft) low tide 5:32pm {1.11ft} EGA TIDE CHART Consultants 921-925 VIA LIDO SOUD engineering geotechnical applications NEWPORT BEACH, CALIFORNIA 8 7 6 5 -;;-Q) Q) 4 ~ +' .L:. 0.0 3 ·a:; :I: <lJ -c 2 i= 1 0 -1 -2 Project No: RS382.1 Date: MAY 2022 Figure No: 4 PA2022-0204 APPENDIX A GEOLOGIC LOGS (B-1 , B-2, B-3, and B-4) and CPT Data Report by Kehoe Drilling & Testing (CPT-1) PA2022-0204 LOG OF EXPLORATORY BORING Sheet 1 of 1 Job Number: RS382.1 Boring No: 8-1 Project: 921-925 Via lido Saud, Newport Beach, CA Boring Location: See Figure 2 R.D. Olson Development -SFR Date Started: 3/21/2022 Rig: Mob. 4" augers Date Completed 3/21/2022 Grnd Elev. +/-14 ft. NAVD88 Sample -J!. -J!. 't Direct Type C: X a. Shear 0 't (/) a, ~ Q) ~ ■ThinWall [gj2.5"Rirg u a. 'O I- Q) Q) ro Q) ~ E: "' (/) IL a. 'O Tube Sample a. i: C: 't;; w >, Q) 0 C: Q) I-.S I-.0 E u "' 0 0 0 a. :i 0 C: 'iii -e-a:: .c 'ci ~ CZ] Bulk [D Standard Spilt ~ Static Water u !!! Q) E u w Q. -~ :, 0 C: Cl) (/) CD Sample Spoon Sample Table Q) :, ro :, I "O .~ vi c:-a. E I-0 C: io 0 X ·;. 0 ::) ·o w ai ~ ro c:n11 ni::~·, ,., .., "'"' a:: ~ I FILL: Grayish brown, silty fine to medium sand 1 SP with shell fragments and trace gravel, Opt % X loose to medium dense damo to moist. 91.4 6.5 97.8 107.0 31 0 60 11.0% SM At 2.5 ft : Becomes tan and gray, damp to moist, Sult z medium dense, well-sorted, medium-grained 7.3 5ppm 5 -sand with trace shell fragments. SP/SM z At 6 ft.: Gray sand and silty sand, medium dense, 8.1 %<200 moist. 3 ¥ z At 8 ft.: Becomes fine sand, dense, very moist. 8.0 z Groundwater encountered at 9 feet. Micaceious. 10 -SM At 10 ft.: Dark gray silt with sand, saturated, dense. 35.4 Ml Total Depth: 11.0 ft. Groundwater at 9 ft. 15 -No Caving (sleeved). Backfilled and Compacted 3/21/2022. 20 - 25 - 30 - 35 - 40 I EGA Consultants II ':~;· I PA2022-0204 LOG OF EXPLORATORY BORING Sheet 1 of 1 Job Number: RS382.1 Boring No: B-2 Project: 921-925 Via Lido Soud, Newport Beach, CA Boring Location: See Figure 2 RD. Olson Development -SFR Date Started: 3/21/2022 Rig: Mob. 4" augers Date Completed: 3/21/2022 Grnd Elev. +/-14 ft. NAVD88 Sample :,l! u Direct 0 :,l! Type C: 0 X a. Shear 0 ~ u Q) ~ CJ) Q) ■ThinWall 1:2:J 2 .5" Rir g u a. 'O I-Q) Q) (1J ~ ~ E iii CJ) IL a. 'O Tube Sample a. C: C: in w >-Q) 0 C: Q) I-.!: I--e E ,JI 0 0 0 a. -"' 0 (.) C: ·.;; -e-Cl'.'. ,:: ::, 1Z] Bulk [I] standard Split static Water Q) 0.. ·5 in "S g (.) ~ 0 C: E (.) w Q) CJ) 'u ro Sample Spoon Sample Table Q) ::, (1J :, J: .2: in c:, a. E I-0 C: X ::J '° ·5 0 w ·x 0 Qi ~ (1J _c:n11 rn=C::r.RIPTlnN Cl'.'. ~ I FILL: Grayish brown, silty fine to medium sand 1 SP with shell fragments and trace gravel, Opt % X loose to medium dense, damp to moist. 92.1 9.4 98.6 107.0 31 0 60 11.0% s'M"' At 2.5 ft.: Becomes tan and gray, damp to moist, Sulf [7 medium dense, well-sorted, medium-grained 7.8 S ppm 5 -sand with trace shell fragments. SP/SM z At 6 ft.: Gray sand and silty sand, medium dense, 6.8 %<200 moist. 3 bZ z At 8 ft.: Becomes fine sand, dense, very moist. 6.9 Groundwater encountered at 9 feet. Micaceious. 10 -SM z At 10 ft.: Dark gray silt with sand, saturated, dense. 27.0 Ml Total Depth: 11 .0 ft. Groundwater at 9 ft. 15 -No Caving (sleeved). Backfilled and Compacted 3/21/2022. 20 - 25 - 30 - 35 - 40 Figure EGA Consultants A-2 PA2022-0204 -- LOG OF EXPLORATORY BORING Sheet 1 of 1 Job Number: RS382.1 Boring No: B-3 Project: 921-925 Via Lido Soud, Newport Beach, CA Boring Location: See Figure 2 R.D. Olson Development -SFR Date Started: 3/21/2022 Rig: Mob. 4" augers Date Completed: 3/21/2022 Grnd Elev. +/-14 ft. NAVD88 Sample ;:,l:! '13 Direct 0 ?F-Type C: X 0. Shear 0 cf '13 Q) ~ (/) Q) ■ThinWall C8J 2 .5" Ring 'fl 0. "O I- Q) Q) <ll 2 ~ ..!:: -.;; (/) LJ.. 0. "O Tube Sample 0. C: C: -w >, Q) E 0 ·.;; C: ~ (/) I-·= I-.e Q 0 0. .:£ 0 u C: -e-er .,:; ·5 :, "3 [Z] Bulk DJ standard Splij i static Water u !!! Q) (/) E u w a. V) 0 C: (l) (/) '6 en Sample Spoon Sample Table Q) :, <ll :, I > V) ~ 0. E I-0 C X :J ·~ 0 0 w ·x 0 Qi ~ <ll sn11 nC:C::/"'OIOTlrll\l O'.'. ~ I FILL: Grayish brown, silty fine to medium sand 1 SP with shell fragments and trace gravel, Opt % x loose to medium dense, damo to moist. 96.3 6.6 103.1 107.0 31.0 60 11.0% ,___ SM At 2.5 ft.: Becomes tan and gray, damp to moist, Sult z medium dense, well-sorted, medium-grained 7.3 5 ppm 5 -sand with trace shell fragments. SP/SM z At 6.5 ft.: Gray sand and silty sand, medium 6.3 %<200 dense, damp to moist. 3 Si z At 8 ft.: Becomes fine sand, dense, very moist. 17.1 v Groundwater encountered at 9 feet. Micaceious. 10 -SM At 10 ft.: Dark gray silt with sand, saturated, dense. 31 .1 M l Total Depth: 11.0 ft. Groundwater at 9 ft. 15 -No Caving (sleeved). Backfilled and Compacted 3/21/2022. 20 - 25 - 30 - 35 - 40 I EGA Consultants II F=~~· I PA2022-0204 - LOG OF EXPLORATORY BORING Sheet 1 of 1 Job Number: RS382.1 Boring No: B-4 Project: 921-925 Via Lido Soud, Newport Beach, CA R.D. Olson Development -SFR Boring Location: See Figure 2 Date Started: 3/21/2022 Rig: Mob. 4" augers Date Completed: 3/21/2022 Grnd Elev. +/-14 ft. NAVD88 Sample ~ 't5 Direct 0 ~ Type C 0 )( 0. Shear 0 ~ 0 Cl) ,i, (J) Q) ■ThinWall C8J 2.5" Ring ti 0. 'U I-Q) Cl) ca 2 ;:, E ·;;; (J) IL 0. 'U Tube Sample 0. C C .... w >-Cl) E 0 'ii) C Cl) "' I-.S I-£ (.) 0 0 0 0. 0 C .e, 0:: .c ·o :, al!, [Z] Bulk DJ Standard Split ~ Static Water (.) ~ Q) 'ii) E 0 w a. iii :, 0 C Q) (J) i5 co Sample Spoon Sample Table ~ :, ca :, I iii ~ 0. E I-0 C ~ 0 )( ·~ 0 :::> ·o w Qi ~ ~ C:,f"\11 ''-'-• ,..,,..., .. ~I\/ 0:: I FILL: Grayish brown, silty fine to medium sand 1 SP with shell fragments and trace gravel, Opt % x loose to medium dense, damo to moist. 94 7.4 100.6 107.0 31 .0 60 11.0% I-SM At 2.5 ft.: Becomes tan and gray, damp to moist, Sulf ~ medium dense, well-sorted, medium-grained 7.8 Sppm 5 -sand with trace shell fragments. SP/SM CZ At 6.5 ft.: Gray sand and silty sand, medium 7.8 %<200 dense, damp to moist. 3 SP ~ [Z At 8 ft.: Becomes gray fine sand, dense, moist. 7.4 z Groundwater encountered at 9 feet. Micaceious. 10 -SM At 10 ft.: Dark gray silt with sand, saturated, dense. 25.9 ,., Total Depth: 11.0 ft. Groundwater at 9 ft. 15 -No Caving (sleeved). Backfilled and Compacted 3/21/2022. 20 - ~ 25 - 30 - 35 - 40 I EGA Consultants II '::~ I PA2022-0204 K~ Kehoe Testing and Engineering 714-901-7270 steve@kehoetesting.com www.kehoetesting.com Project: EGA Consultants Location: 921 Via Lido Soud, Newport Beach, CA 0 2 4 6 8 10 12 14 16 18 20 22 g 24 .s::: a. 26 QJ 0 28 30 32 34 36 38 40 42 44 46 48 50 Cone resistance ~ ' I~ _/ ........ 0 ' (_ r .__ --' l' < ~ ) ~_,---...... ....... ) f J ~ r ' ~ -----_f <. "".) I 100 200 300 400 500 Tip resista nee (tsf) 0 2 4 6 8 10 12 14 16 18 20 22 ;g 24 .s::: a. 26 Q) 0 28 30 32 34 36 38 40 42 44 46 48 50 0 Sleeve friction -,. ' \ < ~ D i"--, l , ') ~r--.. ...._ ----)' l. J l ' / \.._ <::_ !, ~ {' 2 3 4 5 6 7 8 Friction (tsf) 0 4 6 8 10 12 14 16 18 20 22 g24 .s::: a. 26 Q) 0 28 30 32 34 36 38 40 42 44 46 48 50 Pore pressure u ----- \ I -20 ·10 0 10 Pressure (psi) CPeT-IT v.2.3.1.9 -CPTU data presentation & interpretation software -Report created on: 4/28/2022, 10:27:18 AM Project file: 20 O· 2· 4· 6 8 10 12 14 16 18 20 22 g24 .s::: a. 26 Q) 0 28 30 32 34 36 38 40 42 44 46 48 so Friction ratio ., r,.- I- I I ' ~ I l I , 0 1 2 3 4 5 6 7 B Rf(%) O· 2· 4· 6 · 8· - - - - 10 12 14 16 18 20 22 - ?24 .s::: a. 26 QJ 0 28 30 32 34 36 38 40 42 44 46 48 so - - - - - - - CPT-1 Total depth: 50.28 ft, Date: 4/27/2022 Soil Behaviour Type ----------i-- Sand & si ly san -Sil~sanc & san , sill a ~&sil vclay ~ Sa Id &si tvsan ,__ - ~ i-s, '" ,_ s, d& si ly san 1-5 v< 11J& SI l'Y san _J ,,mo . &-si 1y_.,- I I 0 2 4 6 8 10 12 14 16 18 SBT (Robertson, 2010) PA2022-0204 In~ data Depth (ft) qc (tst) 4 5 8 9 10 11 12 13 14 IS 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 so 135.1 119.24 146.23 151.75 147.36 139.31 139.65 116.n 66.06 11.33 8.54 53.62 71.42 113.94 128.S 163.4 162.4 152.13 217.12 285.17 317.95 298.42 283.07 295.37 304.04 260.55 330.79 306.76 239.39 196.16 286.43 353.5 368.04 343.39 325.42 284.84 283.16 240.02 188.79 189.99 220.79 250.08 264 302.26 428.23 460.64 432.6 367.64 396.91 414.06 fs (tst) 0,98 0.69 0.79 0.83 0.75 0.89 0.89 0.73 0.43 0.44 0.12 0.23 0.44 o.n 1.37 0.91 0.67 0.62 0.73 0.82 1.08 1.75 1.63 1.2 1.06 1.23 2.52 3.76 3.29 1.12 1.33 1.57 1.65 2.3 3.27 2.89 2.14 2.06 1.47 1.11 1.17 1.94 1.76 2.92 3.79 3.77 4.91 4.82 4.56 0 S8Tn Ksbt (ft/s) Cv (ft2/s) 6 6 6 6 6 6 6 5 6 6 6 6 7 6 7 7 6 6 6 6 6 6 7 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 7 2.56E-03 2.ZZE-03 2.24E-03 2.24E-03 1.72E-03 1.32E·03 9.14E--04 S.56E--04 1.18E-04 1.IIE-05 7.54E-06 6.18E·05 2.03E--04 1.98E-04 3.67E-04 5.71E-04 l.lOE-03 1.82E--03 3.SOE-03 5.97E--03 4.69E-03 3.03E·03 2.49E-03 3.41E-03 3.66E--03 2.23E-03 8.34E-04 4.19E--04 2,91E--04 5.47E-0'4 2.06E-03 3.46E-03 2.84E-03 1.37£-03 6,45E--04 4.96E--04 4.46E--04 4.08E--04 3.27E--04 4.25E--04 4.98E--04 S.75E--04 4.60E--04 6.14E--04 8.0IE--04 8.08E--04 S.28E--04 3.56E--04 9.13E--04 S.31E-03 5.19E+OI 4.76E+OI 4.98E+OI 5.32E+Ol 4.22E+OI 3.30E+Ol 2.26E+Ol 1.23E+Ol 2.06E+OO l.30E·OI 8.06E-02 8,30E·Ol 3.97E+OO 5.lOE+OO l.lOE+OI 1.76E+Ol 3.17E+OI 5.33E+Ol 1.12E+02 2.18E+02 l.97E+02 l.37E+02 l .14E+02 l.48E+02 l.53E+02 l.06E+02 4.76E+Ol 2.64E+Ol 1.66E+Ol 2.7OE+Ol 9.29E+Ol 1.71E+02 1.54E+02 8.22E+Ol 4.09E+Ol 3.08E+Ol 2.55E+OI 2.09E+OI 1.5IE+Ol l.82E+Ol 2.28E+Ol 2.8SE+Ol 2.6SE+OI 4.09E+OI 6.lOE+Ol 6.81E+Ol 4.58E+Ol 3.15E+Ol 6.71E+Ol 2.95E+02 SPTN60 (blows/feet) 22 23 24 25 25 25 24 21 14 8 11 17 22 27 29 29 31 36 42 48 50 49 48 47 51 56 58 51 47 48 55 59 61 61 58 53 47 42 40 43 47 54 64 74 82 82 80 73 64 Constrained Mod, (tsf) 633.66 668.12 694.74 741.35 765 780.11 773.46 688.69 546.73 366.21 333.76 419.26 608.78 805.01 932.03 963.68 900.25 914.52 1001.14 1140.23 1309.31 1413.7 1427.01 1356.78 1305.18 1486.8 1780.76 1969.07 1778.25 1541.75 1405.5 1544.46 1691.32 1879.49 1978.57 1942.81 1789.4 1599.84 1444.38 1334.03 1430.09 1550.92 1795.11 2079.08 2375.57 2633.22 2712.45 2763.52 2294.2 1734.46 Dr (%) 100 100 97 95 92 89 85 76 61 42 38 47 60 68 75 77 77 79 86 95 99 99 97 96 94 96 96 94 86 84 89 97 99 98 93 89 84 79 73 71 74 78 82 90 98 100 99 96 95 98 921-925 Via Lido Soud, Newport Beach, CA R$382.1 May 2022 Friction •ngle (") 47.03 45.71 44.99 44.74 44.31 43.81 43.1 41.59 39.33 36.12 35.2 36.48 38.4 39.97 41.38 41.82 41.79 42.24 43.37 44.69 45.28 45.24 44.98 44.86 44.57 44.81 44.84 44.63 43.38 43.03 43.86 45.04 45.34 45.09 44.43 43.89 43.09 42.12 41.04 40.74 41.33 41.99 42.63 43.93 45.12 45.77 45.33 44.85 44.77 45.18 Es(tsf) 505.58 533.07 554.32 591.51 610.38 622.43 617.12 549.49 436.22 292.19 266.29 334.52 485.73 642.3 743.64 768.9 718.28 729.67 798.78 909.75 1044.67 1127.95 1138.57 1082.54 1041.36 1186.27 1420.82 1571.07 1418.82 1230.12 1121.41 1232.29 1349.46 1499.59 1578.65 1550.11 1427.71 1276.47 1152.43 1064 .. 39 1141.03 1237.44 1432.27 1658.84 1895.4 2100.97 2164.19 2204.93 1830.48 1383.88 Go (tst) 633.66 668.12 694,74 741.35 765 780.11 773.46 688.69 546.73 366.21 333.76 419.26 608.78 805.01 932.03 963.68 900.25 914.52 1001.14 1140.23 1309.31 1413.7 1427.0l 1356.78 1305.18 1486.8 1780.76 1969.07 1778.25 15-tl.75 1405.5 1544.46 1691.32 1879.49 1978.57 1942.81 1789.4 1599.84 1444.38 1334.03 1430.09 1550.92 1795.11 2079.08 2375.57 2633.22 2712.45 2763.52 2294.2 1734.46 Nkt 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CPT-1 advanced to 50.28 ft. on 4/2712022 by Kehoe Testing and Engineering PA2022-0204 APPENDIX B LABORATORY RE SUL TS PA2022-0204 C.E:OLOl,Y · GEOTE.CH •GROUNDWATER EGA Consultants 375-C Monte Vista Avenue Costa Mesa, California 92627 Attention: Subject: Mr. David Worthington, C.E.G. Laboratory Test Results 921/925 Via Lido Soud Newport Beach, California Dear Mr. Worthington: March 30, 2022 Project No. 114-758-10 G3SoiIWorks, Inc. performed the requested laboratory tests on the soil specimens delivered to our office for the subject project. The results of these tests are included as an attachment to this report. We appreciate the opportunity of providing our services to you on this project. Should you have any questions, please contact the undersigned. Sincerely, G3Soi1Works, Inc. Attachment: Laboratory Test Results 350 Fischer Ave. Front • Costa Mesa, CA 92626 • P: 714 668 5600 • www.G3Soi1Works.com PA2022-0204 EGA Consultants Laboratory Test Results 921 /925 Via Lido Saud Newport Beach, California LABORATORY TEST RESULTS March 30, 2022 Project No. 114-758-1 O Page 2 of 3 Summarized below are the results of requested laboratory testing on samples submitted to our office. Dry Density and Moisture Content Tabulated below are the requested results of field dry density and moisture contents of undisturbed soils samples retained in 2.42-inch inside diameter by 1-inch height rings. Moisture only results were obtained from small bulk samples. Sample Dry Density Moisture Content Identification (pcf) (%) B-1 @ 2.5' 97.8 6.5 B-2@ 2.5' 98.6 9.4 B-3@ 2.5' 103.2 6.6 B-4@2.5' 100.6 7.4 Notes: (*) Denotes small bulk sample for moisture content testing only. Soil Classification Requested soil samples were classified using ASTM D2487 as a guideline and are based on visual and textural methods only. These classifications are shown below: Sample Identification Soil Description Group Symbol B-4@ 0-3' Poorly graded sand with silt with SP shell fragments and gravel Maximum Dry Density and Optimum Moisture Content Maximum dry density and optimum moisture content test was performed on the submitted bulk soil samples in accordance with ASTM D 1557. The results are shown below: Sample Identification Maximum Dry Density Optimum Moisture (pcf) Content(%) B-1 @ 0-3' 107.0 11.0 350 Fischer Ave. Front • Costa Mesa, CA 92626 • P: 714 668 5600 • www.G3Soi1Works.com PA2022-0204 EGA Consultants Laboratory Test Results 921 /925 Via Lido Soud Newport Beach, California Sulfate Content March 30, 2022 Project No. 114-758-10 Page 3 of 3 A selected bulk sample was tested for soluble sulfate content in accordance with Hach procedure. The test result is shown below: Sample Identification Water Soluble Sulfate in Soil Sulfate Exposure (PPM) (ACI 318-08, Table 4.2.1) B-1 @ 0-3' 5 so Direct Shear The results of direct shear testing (ASTM D3080) on sample identified as B-1 @ 2.5 feet are plotted on Figure S-1 . Soil specimen was soaked in a confined state and sheared under varied loads ranging from 1.0 ksf to 4.0 ksf with a direct shear machine set at a controlled rate of strain of 0.01 inch per minute. 200 Wash Sieve Analysis A 200 Wash Sieve test was performed on the requested soil sample in accordance with ASTM 01140 to determine the percentage of material finer than the No. 200 sieve. The test result is shown below. Sample Identification Percent Passing B-4@ 0-3' 3 350 Fischer Ave. Front • Costa Mesa, CA 92626 • P: 714 668 5600 • www.G3Soi1Works.com PA2022-0204 4,000 3,750 3,500 3,250 3,000 2,750 LL. 2,500 (/) a. (/) 2,250 (/) w lY f-Cf) 2,000 lY <( w 1,750 I (/) 1,500 1,250 1,000 750 500 250 0 0 symbol boring • 8-1 500 1,000 DIRECT SHEAR TEST Undisturbed 1,500 2,000 2,500 NORMALSTRESS,PSF 3,000 3,500 4,000 921-925 Via lido Soud, Newport Beach COHESION 60 psf. depth (ft.) symbol boring depth (ft.) 2.5 FRICTION ANGLE 31.0 degrees FIGURE S-1 DIRECT SHEAR TEST PN: 114-758-10 REPORT DATE: 3/30/2022 :ISO F1,cher Ave. Frnnt Costa Me,a. CA 97fi76 Phone (714) 668 S600 www G.~SodWorks corr FIG. S-1 350 Fischer Ave. Front • Costa Mesa. CA 92626 • P: 714 668 5600 • www.G3Soi1Works.com PA2022-0204 MOISTURE CONTENT WORKSHEET PROJECT LOCATION: 921-925 Via Lido Soud, Newport Beach, CA BORING ID B-1 B-1 SAMPLE DEPTH (ft.) 4' 6' MOISTURE CAN ID N A WET SOIL AND TARE (g) 218.1 DRY SOIL AND TARE (g) 206.6 MOISTURE LOSS (g) 11.5 MOISTURE CAN TARE (g) 49.9 DRY SOIL ONLY (g) 156.7 MOISTURE CONTENT(%) 7.3 BORING ID B-2 B-3 SAMPLE DEPTH (ft.) 10' 4' MOISTURE CAN ID E T WET SOIL AND TARE (g) 258.1 DRY SOIL AND TARE (g) 214.0 MOISTURE LOSS (g) 44.1 MOISTURE CAN TARE (g) 50.4 DRY SOIL ONLY (g) 163.6 MOISTURE CONTENT(%) 27.0 moisture loss Moisture Content = m = f Wt. o Dry Soil 207.3 195.5 11.8 50.3 145.2 8.1 206.7 196.1 10.6 50.3 145.8 7.3 B-1 8' I 252.2 237.2 15.0 50.3 186.9 8.0 B-3 6' C 239.0 227.8 11.2 50.3 177.5 6.3 Ywet Y dry = m + 1 B-1 10' J 280.3 220.1 60.2 50.2 169.9 35.4 8-3 8' M 218.7 194.1 24.6 50.2 143.9 17.1 DATE: Drilled 3/21/2022 8-2 8-2 B-2 4' 6' 8' R s w 211.4 233.1 173.8 199.8 221.4 165.8 11.6 11.7 8.0 50.3 50.4 50.4 149.5 171.0 115.4 7.8 6.8 6.9 8-3 B-4 B-4 10' 4' 6' G p 0 280.9 228.4 209.1 213.6 215.5 197.6 67.3 12.9 11.5 49.9 50.0 50.1 163.7 165.5 147.5 41.1 7.8 7.8 SHEET 1 OF 2 EGA CONSULTANTS, INC. PA2022-0204 MOISTURE CONTENT WORKSHEET PROJECT LOCATION: 921-925 Via Lido Soud, Newport Beach, CA BORING ID B-4 B-4 SAMPLE DEPTH (ft.) 8' 10' MOISTURE CAN ID y u WET SOIL AND TARE (g) 219.3 DRY SOIL AND TARE (g) 207.7 MOISTURE LOSS (g) 11.6 MOISTURE CAN TARE (g) 50.0 DRY SOIL ONLY (g) 157.7 MOISTURE CONTENT(%} 7.4 BORING ID SAMPLE DEPTH (ft.) MOISTURE CAN ID WET SOIL AND TARE (g) DRY SOIL AND TARE (g) MOISTURE LOSS (g) MOISTURE CAN TARE (g) DRY SOIL ONLY (g) MOISTURE CONTENT(%) moisture loss Moisture Content= m =-----Wt. of Dry Soil 273.1 227.2 45.9 50.3 176.9 25.9 Ywet Ydry = m + 1 DATE: Drilled 3/21/2022 SHEET 2 OF 2 EGA CONSULTANTS, INC. PA2022-0204 APPENDIX C GENERAL EARTHWORKS AND GRADING GUIDELINES PA2022-0204 GENERAL EARTHWORK AND GRADING GUIDELINES I. GENERAL 11. These guidelines present general procedures and requirements for grading and earthwork including preparation of areas to be filled, placement of fill, installation of subdrains, and excavations. The recommendations contained in the geotechnical report are a part of the earthwork and grading specifications and should supersede the provisions contained herein in the case of conflict. Evaluations performed by the consultant during the course of grading may result in new recommendations which could supersede these specifications or the recommendations of the geotechnical report. EARTHWORK OBSERVATION AND TESTING Prior to commencement of grading, a qualified geotechnical consultant should be employed for the purpose of observing earthwork procedures and testing the fills for conformance with the recommendations of the geotechnical report and these specifications. The consultant is to provide adequate testing and observation so that he may determine that the work was accomplished as specified. It should be the responsibility of the contractor to assist the consultant and keep him apprised of work schedules and changes so that the consultant may schedule his personnel accordingly. The contractor is to provide adequate equipment and methods to accomplish the work in accordance with applicable grading codes or agency ordinances, and these specifications. If in the opinion of the consultant, unsatisfactory conditions are resulting in a quality of work less than required in these specifications, the consultant may reject the work and recommend that construction be stopped until the conditions are rectified. Maximum dry density tests used to determine the degree of compaction should be performed in accordance with the American Society for Testing and Materials Test Method ASTM: D 1557. 921-925 Via Lido Soud, Newport Beach (Lido Isle), CA Soils Report -Proposed Cuslom Home Project No. RS382. I May 3, 2022 PA2022-0204 Ill. PREPARATION OF AREAS TO BE FILLED 1. 2. 3. 4. 5. 6. 7. Clearing and Grubbing: All brush, vegetation, and debris should be removed and otherwise disposed of. Processing: The existing ground which is evaluated to be satisfactory for support of fill should be scarified to a minimum depth of 6 inches. Existing ground which is not satisfactory should be overexcavated as specified in the following section. Scarification should continue until the soils are broken down and free of large clay lumps or clods and until the working surface is reasonably uniform and free of uneven features which would inhibit uniform compaction. Overexcavation: Soft, dry, spongy, or otherwise unsuitable ground, extending to such a depth that surface processing cannot adequately improve the condition, should be over excavated down to firm ground, approved by the consultant. Moisture Conditioning: Over excavated and processed soils should be watered, dried-back, blended, and/or mixed, as necessary to attain a uniform moisture content near optimum. Recompaction: Over excavated and processed soils which have been properly mixed and moisture-conditioned should be recompacted to a minimum relative compaction of 90 percent. Benching: Where fills are to be placed on ground with slopes steeper than 5: 1 (horizontal to vertical units), the ground should be benched. The lowest bench should be a minimum of 15 feet wide, and at least 2 feet deep, expose firm material, and be approved by the consultant. Other benches should be excavated in firm material for a minimum width of 4 feet. Ground sloping flatter than 5: 1 should be benched or otherwise over excavated when considered necessary by the consultant. Approval: All areas to receive fill, including processed areas, removal areas, and toe-of-fill benches should be approved by the consultant prior to fill placement. IV. FILL MATERIAL 1. General: Material to be placed as fill should be free of organic matter and other deleterious substances, and should be approved by the consultant. Soils of poor gradation, expansion, or strength characteristics should be placed in areas 921-925 Via Lido Soud. Newport Beach (Lido Isle), CA Soils Repm1 -Proposed Custom Home Project No. RS382. l May 3, 2022 2 PA2022-0204 2. 3. designated by the consultant or mixed with other soils until suitable to serve as satisfactory fill material. Oversize: Oversize material defined as rock, or other irreducible material with a maximum dimension greater than 12 inches, should not be buried or placed in fill, unless the location, materials, and disposal methods are specifically approved by the consultant. Oversize disposal operations should be such that nesting of oversize material does not occur, and such that the oversize material is completely surrounded by compacted or densified fill. Oversize material should not be placed within 1 O feet vertically of finish grade or within the range of future utilities or underground construction, unless specifically approved by the consultant. Import: If importing of fill material is necessary for grading, the import material should be approved by the geotechnical consultant. V. FILL PLACEMENT AND COMPACTION 1. 2. 3. Fill Lifts: Approved fill material should be placed in areas prepared to receive fill in near-horizontal layers not exceeding 6 inches in compacted thickness. The consultant may approve thicker lifts if testing indicates the grading procedures are such that adequate compaction is being achieved with lifts of greater thickness. Each layer shall be spread evenly and should be thoroughly mixed during spreading to attain uniformity of material and moisture in each layer. Fill Moisture: Fill layers at a moisture content less than optimum should be watered and mixed, and wet fill layers should be aerated by scarification or blended with drier material. Moisture-conditioning and mixing of fill layers should continue until the fill material is at a uniform moisture content at or near optimum. Compaction of Fill: After each layer has been evenly spread, moisture- conditioned, and mixed, it should be uniformly compacted to not less than 90 percent of maximum dry density. Compaction equipment should be adequately sized and either specifically designed for soil compaction or of proven reliability, to efficiently achieve the specified degree of compaction. 4. Fill Slopes: Compacting of slopes should be accomplished, in addition to normal compacting procedures, by backrolling of slopes with sheepsfoot rollers at 921-925 Via Lido Soud, Ncwpon Reach (Lido Isle), CA Soils Report -Proposed Custom Home Project No. RS382. I May 3, 2022 3 PA2022-0204 5. frequent increments of 2 to 3 feet in fill elevation gain, or by other methods producing satisfactory results. At the completion of grading, the relative compaction of the slope out to the slope face shall be at least 90 percent. Compaction Testing: Field tests to check the fill moisture and degree of compaction will be performed by the consultant. The location and frequency of tests should be at the consultant's discretion. In general, the tests should be taken at an interval not exceeding 2 feet in vertical rise and/or 1,000 cubic yards of embankment. VI. SUBDRAIN INSTALLATION VII. Subdrain systems, if required, should be installed in approved ground and should not be changed or modified without the approval of the consultant. The consultant, however, may recommend and upon approval, direct changes in subdrain line, grade, or material. EXCAVATION Excavations and cut slopes should be examined during grading If directed by the consultant, further excavation or overexcavation and refilling of cut areas should be performed, and/or remedial grading of cut slopes performed. Where fill-over-cut slopes are to be graded, unless otherwise approved, the cut portion of the slope should be made and approved by the consultant prior to placement of materials for construction of the fill portion of the slope. 921-925 Via Lido Soud, Newpon Beach (Lido Isle), CA Soils Rcpon -Proposed Custom Home Projccl No. RS382. l May 3, 2022 4 PA2022-0204 APPENDIX D USGS Design Maps Detailed Report PA2022-0204 L\TC Hazards by Location Search Information Address: Coordinates: Elevation: Timestamp: 921-925 Via Lido Scud, Newport Beach, CA 92663, USA 33.6090558, -117.910444 14 ft 2022-05-03T04:37:52.119Z Q ....... 0 ~ Santa Monica ......... -Riversideo ~ Long Bea( 0 Catalina lslana Essential Fish Habitat... 14ft iheim '!ne Temecula 0 Hazard Type: Seismic Go gle -.... --~-----Map data ©2022 Google, INEGI Reference Document: Risk Category: Site Class: ASCE7-16 II D-default Basic Parameters Name Value Ss 1.388 S1 0.493 SMs 1.665 SM1 • null Sos 1.11 So1 • null * See Section 11.4.8 Description MCER ground motion (period=0.2s) MCER ground motion (period= 1.0s) Site-modified spectral acceleration value Site-modified spectral acceleration value Numeric seismic design value at 0.2s SA Numeric seismic design value at 1.0s SA •Additional Information Name Value Description soc • null Seismic design category Fa 1.2 Site amplification factor at 0.2s Fv • null Site amplification factor at 1.0s CRs 0.906 Coefficient of risk (0.2s) CR1 0.919 Coefficient of risk (1 .0s) PGA 0.608 MCEG peak ground acceleration FPGA 1.2 Site amplification factor at PGA PGAM 0.729 Site modified peak ground acceleration PA2022-0204 TL 8 SsRT 1.388 SsUH 1.532 SsD 2.618 S1RT 0.493 S1 UH 0.537 S1D 0.824 PGAd 1.056 • See Section 11.4.8 Long-period transition period (s) Probabilistic risk-targeted ground motion (0.2s) Factored uniform-hazard spectral acceleration (2% probability of exceedance in 50 years) Factored deterministic acceleration val1;e (0.2s) Probabilistic risk-targeted ground motion (1.0s) Factored uniform-hazard spectral acceleration (2% probability of exceedance in 50 years) Factored deterministic acceleration value (1.0s) Factored deterministic acceleration value (PGA) The results indicated here DO NOT reflect any state or local amendments to the values or any delineation lines made during the building code adoption process. Users should confirm any output obtained from this tool with the local Authority Having Jurisdiction before proceeding with design. Disclaimer Hazard loads are provided by the U.S. Geological Survey Seismic Design Web Services. While the information presented on this website is believed to be correct, ATC and its sponsors and contributors assume no responsibility or liability for its accuracy. The material presented in the report should not be used or relied upon for any specific application without competent examination and verification of its accuracy, suitability and applicability by engineers or other licensed professionals. ATC does not intend that the use of this information replace the sound judgment of such competent professionals, having experience and knowledge in the field of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the results of the report provided by this website. Users of the information from this website assume all liability arising from such use. Use of the output of this website does not imply approval by the governing building code bodies responsible for building code approval and interpretation for the building site described by latitude/longitude location in the report. PA2022-0204 APPENDIX E LIQUEFACTION ANALYSES/SETTLEMENT COMPUTATIONS PA2022-0204 921-925 Via lido Soud, Newport Beach, CA RS382.l May 2022 ln11ut rarameters: Peak Ground Acceleration: 0.729 Earthquake Magnitude: 7.2 Water Table Depth (m): 066 Average y above water table (kN/mA3): 16 Average y below water table fkN/mA3): 18 Borehole diameter (mm): 34.925 Requires correction for Sample Liners (YES/NO): NO Sample Depth Measured {NJ Soil Type Flag "Clay" Fines Energy CE CB CR cs N60 oVC oVC' CN Number (m) (USCS) "Unsaturated" Content Ratio "Unreliable" (%) (ER)% 1 0.30 22 SM 13 65 1.08 1 0.75 1 17.88 4.88 4.88 1.70 2 0.61 23 SM 13 65 1.08 1 0.75 1 18.69 9.75 9.75 1.70 3 0.91 24 SM 13 65 1.08 1 0.75 1 19.50 15.14 12.64 1.70 4 1.22 25 SM 13 65 1.08 1 0.75 1 20.31 20.63 15.14 1.70 5 1.52 25 SM 13 65 1.08 1 0.8 1 21.67 26.11 17.64 1.70 6 1.83 25 SM 13 65 1.08 1 0.8 1 21.67 31.60 20.13 1.70 7 2.13 24 SM 13 65 1.08 1 0.8 1 2080 37.08 22.63 1.70 8 2.44 21 SM 11 65 1.08 1 0.8 1 18.20 42.57 25.13 1.70 9 2.74 14 SM 13 65 1.08 1 0.85 1 12.89 48.06 27.62 1.70 10 3.05 8 ML/CL 50 65 1.08 1 0.85 1 7.37 53.54 30.12 1.70 11 3.35 7 ML/CL 50 65 1.08 1 0.85 1 6.45 59.03 32.61 1.70 12 3.66 11 SM 13 65 1.08 1 0.85 1 10.13 64.52 35.11 1.70 13 3.96 17 SM 13 65 1.08 1 0.85 1 15.65 70.00 37.61 1.64 14 4.27 22 SM 13 65 1.08 1 0.85 1 20.26 75.49 40.10 1.59 15 4.57 27 SM 13 65 1.08 1 0.95 1 27.79 80.98 42.60 1.54 16 4.88 29 SM 13 65 1.08 1 0.95 1 29.85 86.46 45.10 1.50 17 5.18 29 SM 13 65 1.08 1 0.95 1 29.85 91.95 47.59 1.46 18 5.49 31 SM 13 65 1.08 1 0.95 1 31.90 97.44 50.09 1.42 19 5.79 36 SW 3 65 1.08 1 0.95 1 37.05 102.92 52.58 1.39 20 6.10 42 SW 3 65 1.08 1 0.95 1 43.23 108.41 55.08 1.36 21 6.40 48 SW 3 65 1.08 1 0.95 1 49.40 113.89 57.58 1.33 22 6.71 SO SM 13 65 1.08 1 0.95 1 51.46 119.38 60.07 1.30 23 7.01 49 SM 13 65 1.08 1 0.95 1 50.43 124.87 62.57 1.27 24 7.32 48 SW 3 65 1.08 1 0.95 1 49.40 130.35 65.07 1.25 25 7.62 47 SW 3 65 1.08 1 0.95 1 48.37 135.84 67.56 1.22 enginPering geotechnical PLATE A applications CPT-1 advanced to 50.28 ft. on 4/27/2022 consultants by Kehoe Testing and Engineering Page 1 PA2022-0204 921-925 Via Lido Soud, Newport Beach, CA RS382.l May 2022 26 7.92 51 SM 13 65 1.08 1 0.95 1 52.49 141.33 70.06 1.20 27 8.23 56 SM 13 65 1.08 1 0.95 1 57.63 146.81 72.56 1.18 28 8.53 58 SM 13 65 1.08 1 1 1 62.83 152.30 75.05 1.16 29 8.84 51 SM 13 65 1.08 1 1 1 55.25 157.79 77.55 1.14 30 9.14 47 SM 13 65 1.08 1 1 1 50.92 163.27 80.04 1.13 31 9.45 48 SM 13 65 1.08 1 1 1 52.00 168.76 82.54 1.11 32 9.75 55 SW 3 65 1.08 1 1 1 59.58 174.24 85.04 1.09 33 10.06 59 SW 3 65 1.08 1 1 1 63.92 179.73 87.53 1.08 34 10.36 61 SW 3 65 1.08 1 1 1 66.08 185.22 90.03 1.06 35 10.67 61 SM 13 65 1.08 1 1 1 66.08 190.70 92.53 1.05 36 10.97 58 SM 13 65 1.08 1 1 1 62.83 196.19 95.02 1.03 37 11.28 53 SM 13 65 1.08 1 1 1 57.42 201.68 97.52 1.02 38 11.58 47 SM 13 65 1.08 1 1 1 50.92 207.16 100.01 1.01 39 11.89 42 SM 13 65 1.08 1 1 45.50 212.65 102.51 0.99 40 12.19 40 SM 13 65 1.08 1 1 1 43.33 218.14 105.01 0.98 41 12.50 43 SM 13 65 1.08 1 1 1 46.58 223.62 107.50 0.97 42 12.80 47 SM 13 65 1.08 1 1 1 50.92 229.11 110.00 0.96 43 13.11 54 SM 13 65 1.08 1 1 1 58.50 234.60 112.50 0.95 44 13.41 64 SM 13 65 1.08 1 1 1 69.33 240.08 114.99 0.94 45 13.72 71-SM 13 65 1.08 1 1 1 80.17 245.57 117.49 0.93 46 14.02 82 SM 13 65 1.08 1 1 1 88.83 251.05 119.98 0.92 47 14.33 82 SM 13 65 1.08 1 1 1 88.83 256.54 122.48 0.91 48 14.63 80 SM 13 65 1.08 1 1 1 86.67 262.03 124.98 0.90 49 14.94 73 SM 13 65 1.08 1 1 1 79.08 267.51 127.47 0.89 50 15.24 64 SM 13 65 1.08 1 1 1 69.33 273.00 129.97 0.88 Auger Diameter: 1.375 inches Hammer Weight: n.a. Drop: continuous push CPT -1 advanced to 50.28 ft by Kehoe Testing and Engineering on April 27, 2022 (CPT Data Logs attached herein) Rererences: Idriss, J.M. and Boulanger, R.W. Soil Liquefaction Oi,ring earthquakes. Earthquake Engineering Research Institute. 8 September 2008. Liu. C. and Evett, J.B. Soils and Foundations, 8th edition. 4 August 2013. Martin, G.R. and Lew, M. Recommendations for Implementation of DMG Special Publication 117. University of Southern California Earthquake Center. March 1999. California Department of Conservation, CGS. Special Publication 117A: Guidelines for Evaluating and Mitigating Seismic Hazards in California. Rev 11 Sept 2008. "CPT and SPT Based Liquefaction Triggering Procedures· by R.W. Boulanger and I.M. Idriss, dated April 2014. "Evaluation of Settlements in Sand Deposits Following Liquefaction During Earthquakes," by Ishihara and Yoshimine, dated 1992. consultants engineering geotechnical application.1· PLATE A CPT-1 advanced to 50.28 ft. on 4/27/2022 by Kehoe Testing and Engineering Page 2 PA2022-0204 (N1)60 tiN for (N1)60-CS Stress CSR MSF for sand Fines reduction Content coeff, rd 30.39 2.51 32.90 1.00 0.48 1.08 31.77 2.51 34.28 1.00 0,47 1.08 33.15 2.51 35.66 1.00 0.57 1.08 34.53 2.51 37.04 1.00 0.64 1.08 36.83 2.51 39.34 0.99 0.70 1.08 36.83 2.51 39.34 0.99 0.74 1.08 35.36 2.51 37.87 0.99 0.77 1.08 30.94 2.Sl 33.45 0.98 0.79 1.08 21.92 2.51 24.42 0.98 0.81 1.08 12.52 5.61 18.14 0.98 0.82 1.08 10.96 5.61 16.57 0.97 0.83 1.08 17.21 2.51 19.71 0.97 0.84 1.08 25.70 2.51 28.20 0.97 0.85 1.08 32.20 2.51 34.71 0.96 0,86 1.08 42.86 2.51 45.36 0.96 0.86 1.08 44.74 2.51 47.25 0.95 0.87 1.08 43.55 2.51 46.06 0.95 0.87 1.08 45.38 2.51 47.88 0.95 0.87 1.08 51.43 0.00 51.43 0.94 0.87 1.08 58.63 0.00 58.63 0.94 0.87 1.08 65.53 0.00 65.53 0.93 0.87 1.08 66.83 2.51 69.34 0.93 0.87 1.08 64.17 2.51 66.68 0.92 0.87 1.08 61.65 0.00 61.65 0.92 0.87 1.08 59.24 0.00 59.24 0.91 0.87 1.08 engineering geotechnic al applications consultants Ko for sand CRR for M=7.5 &oVC'= 1 atm 1.10 0.75 1.10 096 1.10 1.28 1.10 1.77 1.10 2.00 1.10 2.00 1.10 2.00 1.10 O.A2 1.10 0.28 1.10 0.19 1.10 0.17 1.10 0.20 1.10 0.39 1.10 1.04 1.10 2.00 1.10 2.00 1.10 2.00 1.10 2.00 1.10 2.00 1.10 2.00 1.10 2.00 1.10 2.00 1.10 2.00 1.10 2.00 1.10 200 921-925 Via Lido Soud, Newport Beach, CA RS382. l May 2022 CRR Factor of Limiting shear Safety strain ylim 0.89 1.87 0.03 1.14 2.00 0.02 1.52 2.00 0.02 2.00 2.00 0.02 2.00 2.00 0.01 2.00 2.00 0.01 2.00 2.00 0.01 0.98 1.24 0.03 0.33 0.41 0.10 0.22 0.27 0.20 0.20 0.24 0.23 0.24 0.29 0.16 0.47 0.55 0.06 1.24 1.45 0.02 2.00 2.00 0.00 2.00 2.00 0.00 2.00 2.00 0.00 2.00 2.00 0.00 2.00 2,00 0.00 2.00 2.00 0.00 2.00 2.00 0.00 2.00 2.00 0.00 2.00 2.00 0.00 2.00 2.00 0.00 2.00 2.00 0.00 PLATE A CPT-1 advanced to 50.28 ft. on 4/27/2022 by Kehoe Testing and Engineering Page 3 PA2022-0204 63.12 2.51 65.63 0.91 0.87 1.08 1.10 68.11 2.51 70.62 0.90 0.87 1.08 1.10 73.01 2.51 75.52 0.90 0.87 1.08 1.09 63.15 2.51 65.66 0.89 0.86 1.08 1.08 57.29 2.51 59.79 0.89 0.86 1.08 1.07 57.61 2.51 60.12 0.88 0.86 1.08 1.06 65.04 0.00 65.04 0.88 0.85 1.08 1.05 68,77 0.00 68.77 0.87 0.85 1.08 1.04 70.11 0.00 70.11 0.87 0.85 1.08 1.03 69.15 2.51 71.66 0.86 0.84 1.08 1.03 64.88 2.51 67.39 0.86 0.84 1.08 1.02 58.53 2.51 61.03 0.85 0.84 1.08 1.01 51.25 2.51 53.76 0.85 0.83 1.08 1.00 45.24 2.51 47.74 0.84 0.83 1.08 1.00 42.57 2.51 45.07 0.84 0.83 1.08 0.99 45.22 2.51 47.73 0.83 0.82 1.08 0.98 48.87 2.51 51.38 0.83 0.82 1.08 0.97 55.52 2.51 58.03 0.82 0.81 1.08 0.97 65.08 2.51 67.59 0.82 0.81 1.08 0.96 74.4!; 2.51 76.96 0.81 0.81 1.08 0.96 81.63 2.51 84.14 0.81 0.80 1.08 0.95 80.80 2.51 83.31 0.80 0.80 1.08 0.94 78.04 2.51 80.54 0.80 0.79 1.08 0.94 70.51 2.51 73.01 0.79 0.79 1.08 0.93 61.22 2.51 63.73 0.79 0.78 1.08 0.93 References: Idriss, l.M. and Boulanger, R.W. Soil Liquefaction During Earthquakes. Earthquake Engineering Research Institute. 8 September 2008. Liu, C. and Evett, J.B. Soils and Foundations, 8th Edition. 4 August 2013. 921-925 Via lido Soud, Newport Beach, CA RS382.1 May 2022 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0,00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 2.00 2.00 2.00 0.00 Martin, G.R. and Lew, M. Recommendations for lmplcme11tat1011 of DMG Special Publication 117. University of Southern California Earthquake Center. March 1999. California Department of Conservation, CGS. Special Publication 117 A: Guidelines for /,valuating and Mitigating Seismic Hazards in California Rev 11 Sept. 2008. "'CPT and SPT Based Liquefaetion Triggering Procedures· by R.W, Boulanger and I.M. Idriss, dated April 2014. "'Evaluation of Settlements in Sand Deposits Following Liquefaction During Earthquakes." by Ishihara and Yoshimine, dated 1992. I EGA consultants engineering geotechnical applications PLATE A CPT-1 advanced to 50.28 ft. on 4/27/2022 by Kehoe Testing and Engineering Page 4 PA2022-0204 Parameter Fa Maximum llHi (m) shear strain -0.29 -0.38 -0.48 -0.58 -0.75 -0.75 -064 -0.33 0.27 0.61 0.69 0.53 0.03 -0.42 -1.22 -1.37 -1.27 -1.42 -1.71 -2.31 -2.90 -3.24 -3.00 -2.56 -2.36 'EGA ymax 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.10 0.20 0.23 0.16 0.06 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 engineering geotechnical applications consultants 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 llLDli (m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.03 0.06 0.07 0.05 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Vertical llSi (m) reconsol. Strain tv 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 O.Q2 0.01 0.02 0.01 0.03 0.01 0.02 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 llSi (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.02 0.03 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 921-925 Via Lido Soud, Newport Beach, CA RS382.l May 2022 llSi (inches) 0.01 0.00 0.00 0.00 0.00 0.00 0.00 O.O'i 0.23 "\"' o.3o L = o.s9 0.32 n=lO 0.28 Post Soil Cement (Remedial 0.15 "\"' = Grading): o.o3 L o.ss 0.00 n =lO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PLATE A CPT-1 advanced to 50.28 ft. on 4/27/2022 by Kehoe Testing and Engineering Page 5 PA2022-0204 -2.91 0.00 0.30 0.00 0.00 0.00 -3.35 0.00 0.30 0.00 0.00 0.00 -3.79 0.00 0.30 0.00 0.00 0.00 -2.91 0.00 0.30 0.00 0.00 0.00 -2.41 0.00 0.30 0.00 0.00 0.00 -2.43 0.00 0.30 0.00 0.00 0.00 -2.86 0.00 0.30 0.00 0.00 0.00 -3.19 0.00 0.30 0.00 0.00 0.00 -3.30 0.00 0.30 0.00 0.00 0.00 -3.44 0.00 0.30 0.00 0.00 0.00 -3.06 0.00 0.30 0.00 0.00 0.00 -2.51 0.00 0.30 0.00 0.00 0.00 -1.90 0.00 0.30 0.00 0.00 0.00 -1.41 0.00 0.30 0.00 0.00 0.00 -1.20 0.00 0.30 0.00 0.00 0.00 -1.41 0.00 0.30 0.00 0.00 0.00 -1.70 0.00 0.30 0.00 0.00 0.00 -2.26 0.00 0.30 0.00 0.00 0.00 -3.08 0.00 0.30 0.00 0.00 0.00 -3.92 0.00 0.30 0.00 0.00 0.00 -4.58 0.00 0.30 0.00 0.00 0.00 -4.50 0.00 0.30 0.00 0.00 0.00 -4.25 0.00 0.30 0.00 0.00 0.00 -3.56 0.00 0.30 0.00 0.00 0.00 -2.74 0.00 0.30 0.00 0.00 0.00 Total Settlement: 0.031 References: Idriss. I.M. and Boulanger, R.W. Soil Liquefactio11 During Earthquakes. Earthquake Engineering Research Institute. 8 September 2008. Liu, C. and Evett, J.B. Soils and Foundations, 8th Edition. 4 August 2013. 921-925 Via Udo Soud, Newport Beach, CA RS382.l May 2022 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 n.nn 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0111 1.37! Martin, G.R and Lew, M. Recommendations/or lmpleme11tatio11 of DMG Special Publication 117. University of Southern California Earthquake Center. March 1999. California Department of Conservation, CGS. Special Publication 117A: Guidelines for Evaluating and Mitigating Seismic Hazards in California . Rev 11 Sept. 2008. "CPT and SPT Based Liquefaction Triggering Procedures· by R.W. Boulanger and 1.M. Idriss, dated April 2014. "Evaluation of Settlements in Sand Deposits following Liquefaction During Earthquakes," by Ishihara and Yoshimine, dated 1992. consultants engineering geotechnical applications PLATE A CPT-1 advanced to 50.28 ft. on 4/27/2022 by Kehoe Testing and Engineering Page 6 PA2022-0204