Loading...
HomeMy WebLinkAboutEL160613,RS160457_Correction ListCounty of Orange OC Public Works OC Planning Main Office 300 N. Flower Street Santa Ana, CA 92702-4048 Residential Plan Check Corrections It is the responsibility of the applicant to satisfy the requirements (clearances) of each of the departments listed in this document. Normally, each section will stamp your plans indicating their approval. To view your plan check status and the latest correction list on the Internet, please visit: http://www.ocplanning.net and click on 'Plan Check Status' Link. Please note that Planning and Development Services (PDS) Public Counter Hours are open Monday thru Friday from 8:00 a.m. to 4:00 p.m. except holidays. Project Number:EL160613,RS160457 Submittal Date:Mar 31, 2017 CBC Edition: 2013 Plan Check Date: 4/14/2017 10:23 AM Description:Addition to existing garage (410 sq ft), additions to dinning room and family room (132 sq ft); deck Job Address 92 ARCHIPELAGO DR NEWPORT COAST, CA Owner Address Kenneth and Catherine Shaw 92 Archipelago Dr Newport Coast CA92657 1st Plan Check 5/16/16 Current - 1st Recheck 4/14/17 Architect of Record Bruce C Shindelus 636 BAYWOOD DR Newport Beach CA92660 Plan Checked By Comment: Plans reviewed by: BJ Azarvand Email: behrouz.azarvand@ocpw.ocgov.com Web: www.ocplanning.net Phone: 714.667.8875 Page 1 of 6 EL160613,RS160457 GENERAL INFORMATION Application for which no permit is issued within 180 days following the date of application shall expire by limitation. An extension of 180 days may be granted upon written request showing circumstances beyond the control of the applicant have prevented action being taken. In order to renew action for an application after expiration, the applicant shall resubmit plans and pay a new plan check fee. Valid Worker's Compensation Certificate or Owner-Builder Verification is required prior to issuance of building permits. Major corrections shall be made on the original tracing resubmitted with three (3) sets of new prints. Return the previous check print with revised plans. The correction list is available on line at http://ocplanning.net (Click on the plan check status). The Structural Engineer or Civil Engineer or Architect responsible for the project shall sign three final approved sets of plans. The third set is for the assessor's Office. Note on the correction sheet the location of the completed corrections on your plans. Plans will not be rechecked at the counter, allow ten (10) working days for recheck. Upon receiving inspection report from grading inspector, a grading permit and rough grading approval may be required. Building permit will not be issued until Rough Grading approval is obtained from the grading inspector. Contact the plan checker for additional information. Obtain all clearances as noted on the attached clearance summary worksheet. Prompt attention is suggested as there can be delays for other departments to review the project. The applicant shall contact Becky Schade, Orange County Fire Authority at 714-573-6134, to determine if fire clearance is required for this project. OCFA approval is required before any building permits can be issued. Page 2 of 6 4/14/2017 10:23 AM EL160613,RS160457 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) NOTES Notes must be shown as worded, on the title sheet of the plan 1. In the case of emergency, call___________________at Work Phone #___________________or Home Phone #_________ __________. 2. Sediment from areas disturbed by construction shall be retained on site using structural controls to the maximum extent practicable. 3. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage facilities or adjacent properties via runoff, vehicle tacking, or wind. 4. Appropriate BMP's for construction-related materials, wastes, spills shall be implemented to minimize transport from the site to streets, drainage facilities, or adjoining properties by wind or runoff. 5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated to reduce or remove sediment and other pollutants. 6. All construction contractor and subcontractor personnel are to be made aware or the required best management practices and good housekeeping measures for the project site and any associated construction staging areas. 7. At the end of each day of construction activity all construction debris and waste materials shall be collected and properly disposed in trash or recycle bins. 8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or pollutants off the site. Discharges of material other than stormwater only when necessary for performance and completion of construction practices and where they do not: cause or contribute to a violation of any water quality standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardous substance in a quantity reportable under Federal Regulations 40 CFR Parts 117 and 302. 9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains, sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paint flakes or stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment wash water and concrete wash water; concrete, detergent or floatable wastes; wastes from any engine/equipment steam cleaning or chemical degreasing and superchlorinated potable water line flushing. During construction, permittee shall dispose of such materials in a specified and controlled temporary area on -site, physically separated from potential stormwater runoff, with ultimate disposal in accordance with local, state and federal requirements. 10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited. Dewatering of non-contaminated groundwater requires a National Pollutant Discharge Elimination System Permit from the respective State Regional Water Quality Control Board. 11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion of each working day. Drainage is to be directed toward desilting facilities. 12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent public trespass onto areas where impounded water creates a hazardous condition. 13. The permittee and contractor shall inspect the erosion control work and insure that the work is in accordance with the approved plans. 14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and property owners: that dumping of chemicals into the storm drain system or the watershed is prohibited. 15. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary materials shall be available on site and stockpiled at convenient locations to facilitate rapid construction of temporary devices when rain is imminent. 16. All removable erosion protective devices shall be in place at the end of each working day when the 5-Day Rain Probability Forecast exceeds 40%. Page 3 of 6 4/14/2017 10:23 AM EL160613,RS160457 17. Sediments from areas disturbed by construction shall be retained on site using an effective combination of erosion and sediment controls to the maximum extent practicable, and stockpiles of soil shall be properly containted to minimize sediment transport from the site to streets, drainage facilities of adjacent properties via runoff, vehicle tracking, or wind. 18. Appropriate BMPs for construction-related materials, wastes, spills or residues shall be implemented and retained on site to minimize transport from the site to streets, drainage facilities, or adjoining property by wind or runoff. Page 4 of 6 4/14/2017 10:23 AM EL160613,RS160457 Residential Plan Check Corrections Sheet Comments By RS 2013 B. Azarvand1 In your responses, please refer to the alpha-numeric reference numbers that are shown at the start of each of the following correction items. Pending B. Azarvand2 RS CRC 2013 Pending B. Azarvand2.1 Plan Requirements Pending B. Azarvand2.1.1 Digital plan submittal requirements: 1. Upon final approval of the plans, the applicant shall be required to submit one hard copy of the plans and one USB drive containing a separate pdf copy of following: Construction plans including all trades. Structural calculation 2. A 4"X4" space located on the upper right corner (1" below thr top of the sheets and 5" from thee right edges of all sheets of plans shall be left blank to receive the County´s electronic approval stamp. 3 File naming convention examples: RS160457.plans.pdf RS160457.structural calcs.pdf 4. It shall be the responsibility of the contractor, owner/contractor to provide one hard copy set of plans with County approval stamp in the field for inspectors review. Pending B. Azarvand2.1.2 Provide County od Orange special inspection and structural observation forms on plans. Forms shall be completed and signed by owner and project engineer. Copy of the forms can be down loaded from www.ocplanning.net. Pending B. Azarvand2.1.3 Revise all reference made to the City of Newport Beach and replace with the County of Orange. Pending B. Azarvand2.1.4 Provide manufacturer´s name and ICC-ES report number for decking material and provide deck assembly detail. Pending B. Azarvand2.2 Occupancy Requirements Pending B. Azarvand2.2.1 Revise plans to show UL 217 rated smoke alarms: Pending B. Azarvand2.2.1.1 In alterations, repairs and additions smoke alarms are required in each sleeping room, outside each separate sleeping area in the immediate vicinity of the bedrooms, and at each additional floor or basement level. Smoke alarms may be battery operated and not interconnected . [CRC R314.3.1] Pending B. Azarvand2.2.2 Revise plans to show UL 2034/2075 rated Carbon monoxide alarms: Pending B. Azarvand2.2.2.1 Carbon monoxide alarms shall be provided in all new construction Page 5 of 6 4/14/2017 10:23 AM = Indicates line item not Cleared. EL160613,RS160457 Residential Plan Check Corrections Sheet Comments By located in each sleeping room containing a fuel-burning appliance and in dwelling units that have an attached garage. [CRC R315] Pending B. Azarvand2.3 Glazing Pending B. Azarvand2.3.1 See plans for additional comments. Pending B. Azarvand2.4 Energy Pending B. Azarvand2.4.1 Energy forms shall be signed by document author and designer. NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Pending B. Azarvand3 Provide Erosion and Sediment Control(ESCP) plan. Page 6 of 6 4/14/2017 10:23 AM = Indicates line item not Cleared.