Residential Plan Check Corrections
It is the responsibility of the applicant to satisfy the requirements (clearances) of each of the departments listed in this document.
Normally, each section will stamp your plans indicating their approval.
To view your plan check status and the latest correction list on the Internet, please visit: http://www.ocplanning.net and click on
'Plan Check Status' Link.
Please note that Planning and Development Services (PDS) Public Counter Hours are open Monday thru Friday
from 7:30 a.m. to 5:00 p.m. except holidays.
Project Number:SW140053
Submittal Date:Apr 29, 2014
CBC Edition: 2013
Plan Check Date: 5/1/2014 10:56 AM
Description:New pool and spa
combination (588
sq ft.)
Job Address
94 ARCHIPELAGO DR
NEWPORT COAST, CA
Owner Address
Reza Norouzian
94 Archipielago
Newport Coast CA
1st Plan Check 4/1/14 Current - 1st Recheck
Engineer of Record
Universal Engineering
15375 Barranca Parkway #h-106
Irvine CA
949-788-0424
Plan Checked By Contact Address
Len Harkins
30001 Comercio
Rancho Santa Margarita CA92688
949 888-8008
949-888-2246 FAX
Page 1 of 6
SW140053
GENERAL INFORMATION
Application for which no permit is issued within 180 days following the date of application shall expire by limitation.
An extension of 180 days may be granted upon written request showing circumstances beyond the control of the applicant
have prevented action being taken. In order to renew action for an application after expiration, the applicant
shall resubmit plans and pay a new plan check fee.
Valid Worker´s Compensation Certificate or Owner-Builder Verification is required prior to issuance of building
permits.
Major corrections shall be made on the original tracing resubmitted with three (3) sets of new prints. Return the
previous check print with revised plans.
The correction list is available on line at http://ocplanning.net (Click on the plan check status).
The Structural Engineer or Civil Engineer or Architect responsible for the project shall sign three final approved
sets of plans. The third set is for the assessor´s Office.
Note on the correction sheet the location of the completed corrections on your plans. Plans will not be rechecked
at the counter, allow ten (10) working days for recheck.
Page 2 of 6 5/1/2014 10:56 AM
SW140053
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) NOTES
Notes must be shown as worded, on the title sheet of the plan
1. In the case of emergency, call___________________at Work Phone #___________________or Home Phone #_________
__________.
2. Sediment from areas disturbed by construction shall be retained on site using structural controls to the maximum
extent practicable.
3. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage
facilities or adjacent properties via runoff, vehicle tacking, or wind.
4. Appropriate BMP's for construction-related materials, wastes, spills shall be implemented to minimize transport
from the site to streets, drainage facilities, or adjoining properties by wind or runoff.
5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated to reduce
or remove sediment and other pollutants.
6. All construction contractor and subcontractor personnel are to be made aware or the required best management
practices and good housekeeping measures for the project site and any associated construction staging areas.
7. At the end of each day of construction activity all construction debris and waste materials shall be collected
and properly disposed in trash or recycle bins.
8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or
pollutants off the site. Discharges of material other than stormwater only when necessary for performance and
completion of construction practices and where they do not: cause or contribute to a violation of any water quality
standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardous substance in
a quantity reportable under Federal Regulations 40 CFR Parts 117 and 302.
9. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains,
sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paint flakes
or stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery fluids; fertilizers, vehicle/equipment
wash water and concrete wash water; concrete, detergent or floatable wastes; wastes from any engine/equipment
steam cleaning or chemical degreasing and superchlorinated potable water line flushing.
During construction, permittee shall dispose of such materials in a specified and controlled temporary area on
-site, physically separated from potential stormwater runoff, with ultimate disposal in accordance with local,
state and federal requirements.
10. Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited.
Dewatering of non-contaminated groundwater requires a National Pollutant Discharge Elimination System Permit from
the respective State Regional Water Quality Control Board.
11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion of each
working day. Drainage is to be directed toward desilting facilities.
12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent public trespass
onto areas where impounded water creates a hazardous condition.
13. The permittee and contractor shall inspect the erosion control work and insure that the work is in accordance
with the approved plans.
14. The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and property
owners: that dumping of chemicals into the storm drain system or the watershed is prohibited.
15. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary
materials shall be available on site and stockpiled at convenient locations to facilitate rapid construction of
temporary devices when rain is imminent.
16. All removable erosion protective devices shall be in place at the end of each working day when the 5-Day Rain
Probability Forecast exceeds 40%.
Page 3 of 6 5/1/2014 10:56 AM
SW140053
17. Sediments from areas disturbed by construction shall be retained on site using an effective combination of
erosion and sediment controls to the maximum extent practicable, and stockpiles of soil shall be properly containted
to minimize sediment transport from the site to streets, drainage facilities of adjacent properties via runoff,
vehicle tracking, or wind.
18. Appropriate BMPs for construction-related materials, wastes, spills or residues shall be implemented and retained
on site to minimize transport from the site to streets, drainage facilities, or adjoining property by wind or
runoff.
Page 4 of 6 5/1/2014 10:56 AM
SW140053
Residential Plan Check Corrections
Sheet Comments By
SWIMMING POOL STANDARD PLANS
D. Leever1 In your responses, please refer to the alpha-numeric reference numbers that are
shown at the start of each of the following correction items.
Pending D. Leever2 All expired permits are to be cleared prior to final inspeciton. Permit RT021112
and RW030248 are expired.
Pending D. Leever3 Revise plans to indicate height and material of gates and pool enclosure fences.
Revise plans to show/note that all gates shall be self closing and self latching
with a latch a minimum of 5´ high and must be swinging outward.
Indicate height and material of existing property line walls.
Pending D. Leever4 Complete the attached Pool/Spa Questionnaire and attach to the plans.
To be compelted and signed on the plans.
Pending D. Leever5 County of Orange Pool/Spa Notes must be on plans. (see attached notes)
Pending D. Leever6 Provide the Special Inspection Form for shotcrete, which shall be completed by
and signed by licensed architect, engineer, or homeowner. (see attached)
Pending D. Leever7 Provide the completed approved Fire Ant Form attached to plans. (see attached)
Pending D. Leever8 Revise the cross sectional drawings to demonstrate elevation differences between
the pool and the surrounding areas including minimum setbacks from property lines,
building structures and slopes.
Please include all slopes on site including slopes of adjacent properties, the vertical
dimension of height of slope, distance of the proposed pool/spa structure from descending
slope and distance to daylight from bottom of pool footing to face of slope.
Indicate vertical dimension of total slope height per soils report.
Pending D. Leever9 Revise site plan to clearly reference the required pool wall keyway detail (along
top of slope).
Revise site plan to indicate location of applicable keyway detail.
Pending D. Leever10 The swimming pool plans in compliance with soils report recommendations shall
be reviewed and verified by the soil engineer of record. Verification by the soil
engineer of record could be either by sealing and signing all plans or by a verification
letter, which is sealed and signed by him.
Please coordinate with the Structural Engineer to see that the soils report recommendations
are incorporated into the revised plans.
Page 5 of 6 5/1/2014 10:56 AM = Indicates line item not Cleared.
SW140053
Residential Plan Check Corrections
Sheet Comments By
Pending D. Leever11 Show and identify on the plans all easements of record. If there are no easements,
provide a note on the plan signed by the (designer, owner or the contractor) as
follows:
"I have verified the subject property´s grant deed and title report and have found
no easements in the area of the proposed construction. I acknowledge that I am responsible
and accountable for not constructing in the easements".
Signature_________________Date____________
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
Pending D. Leever12 Revise site plan to show Erosion and Sediment Control Plan (ESCP). Include location
of required gravel bags (SE-6 detail), or fiber rolls (SE-5) to contain the area
of work and concrete washout area (WM-8 detail).
Revise note to indicate gravel bags (Sandbags are not allowed).
Page 6 of 6 5/1/2014 10:56 AM = Indicates line item not Cleared.