TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Tom Sandefur, Assistant City Engineer
tandefur@newportbeachca.gov
PHONE: 949-644-3321
TITLE: Goldenrod Pedestrian Bridge Improvements Project — Award of
Contract No. 8871-1 (23R12)
ABSTRACT:
The City of Newport Beach (City) has received construction bids for the Goldenrod
Pedestrian Bridge Improvements Project. The project will replace the planters, irrigation,
wooden arches, and lighting on the Goldenrod Pedestrian Bridge. Staff requests City
Council approval to award the construction contract to Diamond Construction and Design
of La Habra, California.
RECOMMENDATIONS:
a) Find this project exempt from the California Environmental Quality Act (CEQA)
pursuant to Class 1 Section 15301(d) (maintenance of existing public facilities
involving no expansion of existing use) of the CEQA Guidelines, California Code of
Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect
on the environment;
b) Approve the project plans and specifications;
c) Award Contract No. 8871-1 to Diamond Construction and Design for the bid price of
$158,223 for the Goldenrod Pedestrian Bridge Improvements Project, and authorize
the Mayor and City Clerk to execute the contract; and
d) Establish a contingency of $23,000 (approximately 15 percent of total bid) to cover the
cost of unforeseen work not included in the original contract.
DISCUSSION:
A review of the condition of the Goldenrod Pedestrian Bridge planters found that the
planters have reached the end of their expected service life and are ready for
replacement. The boards making up the planters are warped and there is evidence of
termite infestation throughout the wooden planters and arches. In addition, the drainage
system for the planters failed in some areas and is leaking onto the bridge structure,
damaging the concrete.
6-1
Goldenrod Pedestrian Bridge Improvements Project —
Award of Contract No. 8871-1 (23R12)
January 24, 2023
Page 2
The bridge itself was originally built in 1928 and has gone through several maintenance,
retrofit and repair cycles during its lifetime including several replacements of the wooden
planters.
Based on the review of the planters, staff prepared plans and specifications to replace
the planters, the wooden arches, and the lighting on the bridge. The project will also
include fixing the planter drainage system, making any necessary concrete repairs, and
replacing the irrigation system.
At 10 a.m. on December 22, 2022, the City Clerk opened and read the following bids for
this project:
BIDDER
TOTAL BID AMOUNT
Low
Diamond Construction and Design
$ 158,223.00
2nd
Harbor Coating and Restoration
$ 181,250.00
3rd
Applied Restoration, Inc.
$ 204,420.00
4th
Leonida Builders, Inc.
$ 267,000.00
5th
MBC Enterprises, Inc.
$ 272,407.00
The low bidder for this project, Diamond Construction and Design, submitted a bid
1 % lower than the Engineer's Estimate of $160,000. Diamond Construction and Design
submitted all the necessary forms and possesses a Classification "A" and has provided a
subcontractor with a "C-27" California State Contractors License as required by the
project specifications. A check of the contractor's references indicates satisfactory history
of similar projects for other public agencies.
The proposed project includes removing and replacing existing wooden planters, wooden
arches, light fixtures, electrical conduit, irrigation lines, irrigation valves and controller,
replacing the drainage system, and planting new flowers on the Goldenrod Pedestrian
Bridge.
Pursuant to the contract specifications, the contractor will have 40 consecutive working
days to complete the work. Work is scheduled to begin Winter 2023.
The project plans and specifications will be available for review at the January 24, 2023
City Council meeting or upon request.
FISCAL IMPACT:
Sufficient funding is available from the Fiscal Year 2022-23 Capital Improvement Program
(CIP) budget for completion of this contract. The funds will be expended from the General
Fund CIP Account in the Public Works Department, 01 201927-980000-23R1 2.
6-2
Goldenrod Pedestrian Bridge Improvements Project —
Award of Contract No. 8871-1 (23R12)
January 24, 2023
Page 3
The following funds will be expended:
Account Description
Account Number
Amount
General Fund CIP
01 201927-980000-23R1 2
$
182,223.00
Total:
$
182,223.00
Proposed expenditures are as follows:
Vendor
Purpose
Amount
Diamond Construction and Design
Construction Contract
$
158,223.00
Diamond Construction and Design
Construction Contingency
$
23,000.00
Various
Printing and Incidentals
$
1,000.00
Total: $ 182,223.00
Staff recommends establishing $23,000 (approximately 15 percent) for contingency
purposes to cover the cost of unforeseen conditions associated with construction.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this exempt from the California Environmental
Quality Act (CEQA) pursuant to Class 1 Section 15301(d) (maintenance of existing public
facilities involving no expansion of existing use) of the CEQA Guidelines, California Code
of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect
on the environment;
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENT:
Attachment A — Location Map
6-3
ATTACHMENT A
LIMITS OF WORK
GOLDENROD PEDESTRIAN BRIDGE CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
LOCATION MAP C-8871-1 23R12 1/24/23