Commissioning of Electrical –
QA/QC Checklists
Specification Section
260800 1.8A– COMMISSIONING OF ELECTRICAL
– TESTS & CERTIFICATES
Approval Page
1730 S. ANAHEIM WAY ANAHEIM WAY, CA 92805
PHONE (657) 276 0600
EQUIPMENT
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220004ID Rosendin Electric, Inc.Company
Name HLA1N Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:05 AMCreated On Equipment Name HLA1N
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-10 13:07:31 2021-08-10 13:07:28 2021-07-01 07:15:48
2021-04-26 09:38:47 2021-04-26 09:38:30 2021-04-26 09:38:20
2021-04-26 09:38:14 2021-04-26 09:38:01 2021-04-26 09:28:27
Page 5 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
2021-04-26 09:27:58 HLA1N_Panel_Schedule_1.pdf HLA1N_Submittal.pdf (1 / 2)
HLA1N_Submittal.pdf (2 / 2)HLA1N_Panel_Schedule.pdf HLA1N_BOM.pdf
Images for: HLA1N Panelboard Checklist (A) rev3 - AM120220004 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
Page 6 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Comments
No MR attached
Item #Item Text Response # Issues
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
Comments
No MR attached
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:35 0
16 Current Rating:225 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)480Y/277V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
No 0
Comments
neneeded to install ground lugs for wire size
Page 7 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 1
Comments
There is a 90A breaker on the panel which does not show on the panel
schedule.
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 15 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
Page 8 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 16 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 481 0
46 Record Phase to Phase Voltage B-C 481 0
47 Record Phase to Phase Voltage C-A 480 0
48 Record Phase to Neutral Voltage A-N 280 0
49 Record Phase to Neutral Voltage B-N 280 0
50 Record Phase to Neutral Voltage C-N 278 0
51 Record Phase to Ground Voltage A-G 280 0
52 Record Phase to Ground Voltage B-G 280 0
53 Record Phase to Ground Voltage C-G 278 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
Page 9 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 10 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220034ID Rosendin Electric, Inc.Company
Name HLA1S Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:15 PMCreated On Equipment Name HLA1S
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-11 11:40:03 2021-08-11 11:39:54 2021-07-02 08:27:23
2021-04-26 10:19:02 2021-04-26 10:17:35 2021-04-26 10:17:17
2021-04-26 10:17:05 2021-04-26 10:17:00 2021-04-26 09:51:29
Page 60 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
HLA1S_Panel_Schedule_1.pdf HLA1S_Submittal.pdf (1 / 2)HLA1S_Submittal.pdf (2 / 2)
HLA1S_Panel_Schedule.pdf HLA1S_BOM.pdf
Images for: HLA1S Panelboard Checklist (A) rev3 - AM120220034 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?26 Apr 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
Page 61 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Comments
No MR attached to pallet
Item #Item Text Response # Issues
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
Comments
No MR attached to pallet
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:14 0
16 Current Rating:250 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)480Y/277V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
Yes 0
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per Yes 0
Page 62 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
design, submittal, and specifications?
Item #Item Text Response # Issues
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
Comments
There is a 90A breaker on the odd side of the panel and a 30A breaker
on the even side of the panel.
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 1
Comments
The breakers are rated for 18KA and 25KA while the spec sheet is labled
as 14KA.
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 16 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
Page 63 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 17 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 482 0
46 Record Phase to Phase Voltage B-C 482 0
47 Record Phase to Phase Voltage C-A 481 0
48 Record Phase to Neutral Voltage A-N 280 0
49 Record Phase to Neutral Voltage B-N 280 0
50 Record Phase to Neutral Voltage C-N 278 0
51 Record Phase to Ground Voltage A-G 280 0
52 Record Phase to Ground Voltage B-G 280 0
53 Record Phase to Ground Voltage C-G 278 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
Page 64 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 65 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220040ID Rosendin Electric, Inc.Company
Name HLA2N Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:20 PMCreated On Equipment Name HLA2N
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-11 08:20:35 2021-08-11 08:20:31 2021-07-01 12:35:58
2021-04-23 14:03:42 2021-04-23 14:01:48 2021-04-23 14:01:40
2021-04-23 14:01:32 2021-04-23 14:01:27 2021-04-23 13:49:50
Page 71 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
HLA2N_Panel_Schedule_1.pdf HLA2N_Submittal.pdf (1 / 2)HLA2N_Submittal.pdf (2 / 2)
HLA2N_BOM.pdf HLA2N_Panel_Schedule.pdf
Images for: HLA2N Panelboard Checklist (A) rev3 - AM120220040 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
Page 72 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:22 0
16 Current Rating:125 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)480Y/277V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
Yes 0
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 1
Page 73 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 15 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
Page 74 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 17 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 482 0
46 Record Phase to Phase Voltage B-C 482 0
47 Record Phase to Phase Voltage C-A 481 0
48 Record Phase to Neutral Voltage A-N 280 0
49 Record Phase to Neutral Voltage B-N 280 0
50 Record Phase to Neutral Voltage C-N 278 0
51 Record Phase to Ground Voltage A-G 280 0
52 Record Phase to Ground Voltage B-G 280 0
53 Record Phase to Ground Voltage C-G 278 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 75 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220019ID Rosendin Electric, Inc.Company
Name HLA2S Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:24 AMCreated On Equipment Name HLA2S
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-11 13:13:55 2021-08-11 13:13:50 2021-04-23 13:23:33
2021-04-23 12:52:28 2021-04-23 12:51:23 2021-04-23 12:51:14
2021-04-23 12:51:05 2021-04-23 12:50:53 2021-04-23 12:49:45
Page 32 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
HLA2S_Panel_Schedule_1.pdf HLA2S_Submittal.pdf (1 / 2)HLA2S_Submittal.pdf (2 / 2)
HLA2S_BOM.pdf HLA2S_Panel_Schedule.pdf
Images for: HLA2S Panelboard Checklist (A) rev3 - AM120220019 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
Page 33 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:125 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
Yes 0
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 1
Page 34 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 15 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
Page 35 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 17 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 482 0
46 Record Phase to Phase Voltage B-C 482 0
47 Record Phase to Phase Voltage C-A 481 0
48 Record Phase to Neutral Voltage A-N 280 0
49 Record Phase to Neutral Voltage B-N 280 0
50 Record Phase to Neutral Voltage C-N 278 0
51 Record Phase to Ground Voltage A-G 280 0
52 Record Phase to Ground Voltage B-G 280 0
53 Record Phase to Ground Voltage C-G 278 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 36 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220025ID Rosendin Electric, Inc.Company
Name HMA1N Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:09 PMCreated On Equipment Name HMA1N
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-10 13:06:45 2021-08-10 13:06:39 2021-07-02 12:50:20
2021-07-02 12:50:14 2021-04-23 14:21:23 2021-04-23 14:20:04
2021-04-23 14:19:54 2021-04-23 14:18:18 2021-04-23 14:12:25
Page 42 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
HMA1N_Panel_Schedule_1.pdf HMA1N_Submittal.pdf (1 / 2)HMA1N_Submittal.pdf (2 / 2)
HMA1N_BOM.pdf HMA1N_Panel_Schedule.pdf
Images for: HMA1N Panelboard Checklist (A) rev3 - AM120220025 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
Page 43 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:35 0
16 Current Rating:225 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)480Y/277V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
Yes 0
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 1
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
Page 44 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 15 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
Page 45 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 17 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 483 0
Comments
483
46 Record Phase to Phase Voltage B-C 481 0
Comments
481
47 Record Phase to Phase Voltage C-A 480 0
Comments
480
48 Record Phase to Neutral Voltage A-N 280 0
Comments
280
49 Record Phase to Neutral Voltage B-N 280 0
Comments
280
50 Record Phase to Neutral Voltage C-N 278 0
Comments
278
51 Record Phase to Ground Voltage A-G 280 0
Comments
280
Page 46 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
52 Record Phase to Ground Voltage B-G 280 0
Comments
280
53 Record Phase to Ground Voltage C-G 278 0
Comments
278
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
Comments
Tim Ware
57 Tested by: Electrician (2)Brandon Peeler 0
Comments
Brandon Peeler
END OF START-UP PROCEDURE
Page 47 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220028ID Rosendin Electric, Inc.Company
Name HMA1S Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:11 PMCreated On Equipment Name HMA1S
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-11 11:38:31 2021-08-11 11:38:23 2021-07-02 08:40:40
2021-04-26 08:31:55 2021-04-26 08:31:18 2021-04-26 08:30:38
2021-04-26 08:30:31 2021-04-26 08:29:46 2021-04-26 08:28:54
Page 48 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
2021-04-26 08:28:47 2021-04-26 08:28:07 HMA1S_Panel_Schedule_1.pdf
HMA1S_Submittal.pdf (1 / 2)HMA1S_Submittal.pdf (2 / 2)HMA1S_Panel_Schedule.pdf
HMA1S_BOM.pdf
Images for: HMA1S Panelboard Checklist (A) rev3 - AM120220028 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?26 Apr 2021 0
Page 49 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 1
Comments
Minor scratch and bend on the cover of the interior. Refer to
attachments for pictures.
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:22 0
16 Current Rating:225 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)480Y/277V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
Page 50 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
Yes 0
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 1
Comments
Breaker KA are rated for 65 and 35 KA while the spec sheet is labeled as
22 KA.
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 16 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
Page 51 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 17 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 482 0
46 Record Phase to Phase Voltage B-C 482 0
47 Record Phase to Phase Voltage C-A 481 0
48 Record Phase to Neutral Voltage A-N 280 0
49 Record Phase to Neutral Voltage B-N 280 0
50 Record Phase to Neutral Voltage C-N 278 0
51 Record Phase to Ground Voltage A-G 280 0
52 Record Phase to Ground Voltage B-G 280 0
53 Record Phase to Ground Voltage C-G 278 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
Page 52 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 53 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220049ID Rosendin Electric, Inc.Company
Name INV Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:27 PMCreated On Equipment Name INV
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-07-02 09:37:19 2021-07-02 09:36:51 2021-07-02 09:36:40
INV_Panel_Schedule.pdf
Images for: INV Panelboard Checklist (A) rev3 - AM120220049 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
Page 87 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
Comments
INV batteries got received
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Other 0
Comments
Evenlite
15 KAIC Rating:14 0
16 Current Rating:100 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)480Y/277V3Ø4W 0
18 NEMA Rating:Type 1 0
Page 88 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Breaker 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
No 1
Comments
needed to install larger neutral bar for wire quantities
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 16 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
Page 89 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 19 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 482 0
46 Record Phase to Phase Voltage B-C 482 0
47 Record Phase to Phase Voltage C-A 481 0
48 Record Phase to Neutral Voltage A-N 280 0
49 Record Phase to Neutral Voltage B-N 280 0
50 Record Phase to Neutral Voltage C-N 278 0
51 Record Phase to Ground Voltage A-G 280 0
Page 90 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
52 Record Phase to Ground Voltage B-G 280 0
53 Record Phase to Ground Voltage C-G 278 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 91 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220043ID Rosendin Electric, Inc.Company
Name LMA1N Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:23 PMCreated On Equipment Name LMA1N
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-10 13:08:20 2021-08-10 13:08:18 2021-08-10 13:08:14
2021-07-01 07:58:13 2021-04-23 08:16:12 2021-04-23 08:16:06
2021-04-23 08:16:02 2021-04-23 08:13:42 2021-04-23 08:13:38
Page 76 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
2021-04-23 08:13:32 LMA1N_Panel_Schedule_1.pdf LMA1N_Submittal.pdf (1 / 2)
LMA1N_Submittal.pdf (2 / 2)LMA1N_BOM.pdf LMA1N_Panel_Schedule.pdf
Images for: LMA1N Panelboard Checklist (A) rev3 - AM120220043 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
Page 77 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:150 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Breaker 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
Yes 0
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 1
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
Page 78 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 15 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
Page 79 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 17 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
Comments
210
46 Record Phase to Phase Voltage B-C 210 0
Comments
210
47 Record Phase to Phase Voltage C-A 208 0
Comments
208
48 Record Phase to Neutral Voltage A-N 120 0
Comments
120
49 Record Phase to Neutral Voltage B-N 121 0
Comments
121
50 Record Phase to Neutral Voltage C-N 120 0
Comments
120
51 Record Phase to Ground Voltage A-G 120 0
Comments
120
Page 80 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
52 Record Phase to Ground Voltage B-G 121 0
Comments
121
53 Record Phase to Ground Voltage C-G 120 0
Comments
120
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
Comments
Tim Ware
57 Tested by: Electrician (2)Brandon Peeler 0
Comments
Brandon Peeler
END OF START-UP PROCEDURE
Page 81 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220031ID Rosendin Electric, Inc.Company
Name LMA1S Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:13 PMCreated On Equipment Name LMA1S
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-11 11:43:11 2021-08-11 11:43:05 2021-07-02 12:49:01
2021-07-02 08:17:44 2021-04-26 11:53:05 2021-04-26 11:49:16
2021-04-26 11:49:11 2021-04-26 11:49:05 2021-04-26 11:48:59
Page 54 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
2021-04-26 11:48:00 2021-04-26 11:47:56 LMA1S_Panel_Schedule_1.pdf
LMA1S_Submittal.pdf (1 / 2)LMA1S_Submittal.pdf (2 / 2)LMA1S_Panel_Schedule.pdf
LMA1S_BOM.pdf
Images for: LMA1S Panelboard Checklist (A) rev3 - AM120220031 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?26 Apr 2021 0
Page 55 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:225 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Breaker 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
No 0
Comments
needed to install ground lugs for wire size
Page 56 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
Comments
only missing 150A main breaker on planned schedule sheet.
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 16 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
Page 57 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 20 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
46 Record Phase to Phase Voltage B-C 210 0
47 Record Phase to Phase Voltage C-A 209 0
48 Record Phase to Neutral Voltage A-N 121 0
49 Record Phase to Neutral Voltage B-N 121 0
50 Record Phase to Neutral Voltage C-N 120 0
51 Record Phase to Ground Voltage A-G 121 0
52 Record Phase to Ground Voltage B-G 121 0
53 Record Phase to Ground Voltage C-G 120 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
Page 58 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
END OF START-UP PROCEDURE
Page 59 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220016ID Rosendin Electric, Inc.Company
Name LMA2N Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:21 AMCreated On Equipment Name LMA2N
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-11 08:18:18 2021-08-11 08:18:14 2021-07-01 09:27:21
2021-04-26 11:25:27 2021-04-26 11:24:54 2021-04-26 11:24:35
2021-04-26 11:24:25 2021-04-26 11:19:44 2021-04-26 11:19:37
Page 26 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
LMA2N_Panel_Schedule_1.pdf LMA2N_Submittal.pdf (1 / 2)LMA2N_Submittal.pdf (2 / 2)
LMA2N_Panel_Schedule.pdf LMA2N_BOM.pdf
Images for: LMA2N Panelboard Checklist (A) rev3 - AM120220016 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
Page 27 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:225 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
Yes 0
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
Page 28 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 15 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
Page 29 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 17 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
Comments
210
46 Record Phase to Phase Voltage B-C 210 0
Comments
210
47 Record Phase to Phase Voltage C-A 209 0
Comments
209
48 Record Phase to Neutral Voltage A-N 120 0
Comments
120
49 Record Phase to Neutral Voltage B-N 121 0
Comments
121
50 Record Phase to Neutral Voltage C-N 120 0
Comments
120
51 Record Phase to Ground Voltage A-G 120 0
Comments
120
Page 30 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
52 Record Phase to Ground Voltage B-G 121 0
Comments
121
53 Record Phase to Ground Voltage C-G 120 0
Comments
120
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
Comments
Tim Ware
57 Tested by: Electrician (2)Brandon Peeler 0
Comments
Brandon Peeler
END OF START-UP PROCEDURE
Page 31 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220013ID Rosendin Electric, Inc.Company
Name LMA2S Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:17 AMCreated On Equipment Name LMA2S
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-11 13:15:58 2021-08-11 13:15:54 2021-07-02 07:31:17
2021-04-26 11:38:59 2021-04-26 11:35:26 2021-04-26 11:35:18
2021-04-26 11:35:09 2021-04-26 11:35:01 2021-04-26 11:34:17
Page 21 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
2021-04-26 11:34:02 LMA2S_Panel_Schedule_1.pdf LMA2S_BOM.pdf
LMA2S_Panel_Schedule.pdf LMA2S_Submittal.pdf (1 / 2)LMA2S_Submittal.pdf (2 / 2)
Images for: LMA2S Panelboard Checklist (A) rev3 - AM120220013 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
Page 22 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:225 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
Yes 0
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
Page 23 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 15 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
Page 24 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 24 Aug 2020 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
46 Record Phase to Phase Voltage B-C 210 0
47 Record Phase to Phase Voltage C-A 209 0
48 Record Phase to Neutral Voltage A-N 120 0
49 Record Phase to Neutral Voltage B-N 120 0
50 Record Phase to Neutral Voltage C-N 121 0
51 Record Phase to Ground Voltage A-G 120 0
52 Record Phase to Ground Voltage B-G 120 0
53 Record Phase to Ground Voltage C-G 121 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 25 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220058ID Rosendin Electric, Inc.Company
Name LPA1N1 Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:32 PMCreated On Equipment Name LPA1N1
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-07-02 12:45:05 2021-07-01 07:13:19 2021-04-26 13:34:34
2021-04-26 13:34:07 2021-04-26 13:34:01 2021-04-26 13:33:55
2021-04-26 13:33:50 2021-04-26 13:32:48 2021-04-26 13:32:42
Page 103 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
LPA1N1_Panel_Schedule_1.pdf LPA1N1_Submittal.pdf (1 / 2)LPA1N1_Submittal.pdf (2 / 2)
LPA1N1_BOM.pdf LPA1N1_Panel_Schedule.pdf
Images for: LPA1N1 Panelboard Checklist (A) rev3 - AM120220058 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
Page 104 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:400 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Breaker 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
No 0
Comments
neneeded to install ground lugs for wire size
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
Page 105 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Comments
400A main breaker not included in schedule plan sheet.
Item #Item Text Response # Issues
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 15 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
Page 106 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 23 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
46 Record Phase to Phase Voltage B-C 210 0
47 Record Phase to Phase Voltage C-A 209 0
48 Record Phase to Neutral Voltage A-N 121 0
49 Record Phase to Neutral Voltage B-N 121 0
50 Record Phase to Neutral Voltage C-N 120 0
51 Record Phase to Ground Voltage A-G 121 0
52 Record Phase to Ground Voltage B-G 121 0
53 Record Phase to Ground Voltage C-G 120 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 107 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220061ID Rosendin Electric, Inc.Company
Name LPA1N2 Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:35 PMCreated On Equipment Name LPA1N2
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-10 13:11:03 2021-08-10 13:11:01 2021-08-10 13:10:57
2021-08-10 13:10:50 2021-08-10 13:10:42 2021-08-10 13:09:46
2021-08-10 13:09:40 2021-08-10 13:09:36 2021-08-10 13:09:32
Page 108 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
2021-07-02 12:46:25 2021-07-01 07:14:04 2021-04-26 07:51:16
2021-04-23 13:37:28 2021-04-23 13:36:41 2021-04-23 12:44:17
2021-04-23 11:36:33 2021-04-23 11:36:27 2021-04-23 11:36:11
2021-04-23 11:35:52 2021-04-23 11:34:18 2021-04-23 11:33:56
Page 109 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
LPA1N2_Panel_Schedule.pdf
Images for: LPA1N2 Panelboard Checklist (A) rev3 - AM120220061 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
Page 110 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:400 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 1
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
No 0
Comments
needed to install ground lugs for wire size
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
Page 111 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
GENERAL INFORMATION
27 Inspection Date 15 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 23 Aug 2021 0
Page 112 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
46 Record Phase to Phase Voltage B-C 210 0
47 Record Phase to Phase Voltage C-A 209 0
48 Record Phase to Neutral Voltage A-N 121 0
49 Record Phase to Neutral Voltage B-N 121 0
50 Record Phase to Neutral Voltage C-N 120 0
51 Record Phase to Ground Voltage A-G 121 0
52 Record Phase to Ground Voltage B-G 121 0
53 Record Phase to Ground Voltage C-G 120 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 113 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220010ID Rosendin Electric, Inc.Company
Name LPA1S1 Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:13 AMCreated On Equipment Name LPA1S1
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-11 11:41:17 2021-08-11 11:41:09 2021-08-11 11:41:04
2021-07-02 08:00:41 2021-07-02 08:00:32 2021-04-23 11:18:53
2021-04-23 11:18:40 2021-04-23 11:00:20 2021-04-23 10:58:40
Page 16 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
2021-04-23 10:58:29 2021-04-23 10:58:23 2021-04-23 10:57:19
LPA1S1_Panel_Schedule_1.pdf LPA1S1_Panel_Schedule.pdf LPA1S1_BOM.pdf
LPA1S1_Submittal.pdf (1 / 2)LPA1S1_Submittal.pdf (2 / 2)
Images for: LPA1S1 Panelboard Checklist (A) rev3 - AM120220010 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?26 Apr 2021 0
Page 17 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:600 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Breaker 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
No 0
Comments
needed to install ground lugs for wire size
Page 18 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 16 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
Page 19 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 24 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
46 Record Phase to Phase Voltage B-C 210 0
47 Record Phase to Phase Voltage C-A 209 0
48 Record Phase to Neutral Voltage A-N 121 0
49 Record Phase to Neutral Voltage B-N 121 0
50 Record Phase to Neutral Voltage C-N 120 0
51 Record Phase to Ground Voltage A-G 121 0
52 Record Phase to Ground Voltage B-G 121 0
53 Record Phase to Ground Voltage C-G 120 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 20 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220037ID Rosendin Electric, Inc.Company
Name LPA1S2 Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:18 PMCreated On Equipment Name LPA1S2
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-11 11:42:03 2021-08-11 11:41:57 2021-07-02 08:01:16
2021-04-26 12:48:31 2021-04-26 12:48:10 2021-04-26 12:47:55
2021-04-26 12:47:43 2021-04-26 12:47:36 2021-04-26 12:42:52
Page 66 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
2021-04-26 12:42:46 LPA1S2_Panel_Schedule_1.pdf LPA1S2_Submittal.pdf (1 / 2)
LPA1S2_Submittal.pdf (2 / 2)LPA1S2_BOM.pdf LPA1S2_Panel_Schedule.pdf
Images for: LPA1S2 Panelboard Checklist (A) rev3 - AM120220037 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?26 Apr 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
Page 67 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:225 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
No 0
Comments
needed to install ground lugs for wire size
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
Page 68 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 16 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
Page 69 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 24 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
46 Record Phase to Phase Voltage B-C 210 0
47 Record Phase to Phase Voltage C-A 209 0
48 Record Phase to Neutral Voltage A-N 121 0
49 Record Phase to Neutral Voltage B-N 121 0
50 Record Phase to Neutral Voltage C-N 120 0
51 Record Phase to Ground Voltage A-G 121 0
52 Record Phase to Ground Voltage B-G 121 0
53 Record Phase to Ground Voltage C-G 120 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 70 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM042221001ID Rosendin Electric, Inc.Company
Name LPA1S3 Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
22 Apr 2021 1:23 PMCreated On Equipment Name LPA1S3
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-11 11:37:43 2021-08-11 11:37:37 2021-07-07 09:37:34
LPA1S3_Panel_Schedule.pdf
Images for: LPA1S3 Panelboard Checklist (A) rev3 - AM042221001 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
Page 1 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:125 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
Page 2 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
Yes 0
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 16 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
Page 3 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 25 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
46 Record Phase to Phase Voltage B-C 210 0
47 Record Phase to Phase Voltage C-A 209 0
48 Record Phase to Neutral Voltage A-N 121 0
49 Record Phase to Neutral Voltage B-N 121 0
50 Record Phase to Neutral Voltage C-N 120 0
51 Record Phase to Ground Voltage A-G 121 0
52 Record Phase to Ground Voltage B-G 121 0
53 Record Phase to Ground Voltage C-G 120 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 4 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220055ID Rosendin Electric, Inc.Company
Name LPA2N1 Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:31 PMCreated On Equipment Name LPA2N1
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-11 08:19:47 2021-08-11 08:19:44 2021-08-11 08:19:40
2021-07-01 08:53:35 2021-04-26 07:55:48 2021-04-23 08:03:55
2021-04-23 08:03:51 2021-04-23 07:26:59 2021-04-22 14:02:32
Page 98 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
2021-04-22 14:02:21 2021-04-22 14:02:14 2021-04-22 14:02:08
LPA2N1_Panel_Schedule_1.pdf LPA2N1_Panel_Schedule.pdf LPA2N1_Submittal.pdf (1 / 2)
LPA2N1_Submittal.pdf (2 / 2)LPA2N1_BOM.pdf
Images for: LPA2N1 Panelboard Checklist (A) rev3 - AM120220055 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
Page 99 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:250 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
No 0
Comments
neneeded to install ground lugs for wire size
Page 100 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 15 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
Page 101 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 25 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
46 Record Phase to Phase Voltage B-C 210 0
47 Record Phase to Phase Voltage C-A 209 0
48 Record Phase to Neutral Voltage A-N 121 0
49 Record Phase to Neutral Voltage B-N 121 0
50 Record Phase to Neutral Voltage C-N 120 0
51 Record Phase to Ground Voltage A-G 121 0
52 Record Phase to Ground Voltage B-G 121 0
53 Record Phase to Ground Voltage C-G 120 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 102 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220046ID Rosendin Electric, Inc.Company
Name LPA2N2 Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:25 PMCreated On Equipment Name LPA2N2
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-11 08:19:01 2021-08-11 08:18:57 2021-07-01 09:05:56
2021-04-26 13:23:23 2021-04-26 13:23:01 2021-04-26 13:22:54
2021-04-26 13:22:47 2021-04-26 13:22:41 2021-04-26 13:21:23
Page 82 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
2021-04-26 13:21:09 LPA2N2_Panel_Schedule_1.pdf LPA2N2_Submittal.pdf (1 / 2)
LPA2N2_Submittal.pdf (2 / 2)LPA2N2_BOM.pdf LPA2N2_Panel_Schedule.pdf
Images for: LPA2N2 Panelboard Checklist (A) rev3 - AM120220046 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
Page 83 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:250 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
Yes 0
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
Page 84 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 15 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
Page 85 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 26 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
46 Record Phase to Phase Voltage B-C 210 0
47 Record Phase to Phase Voltage C-A 209 0
48 Record Phase to Neutral Voltage A-N 121 0
49 Record Phase to Neutral Voltage B-N 121 0
50 Record Phase to Neutral Voltage C-N 120 0
51 Record Phase to Ground Voltage A-G 121 0
52 Record Phase to Ground Voltage B-G 121 0
53 Record Phase to Ground Voltage C-G 120 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 86 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220052ID Rosendin Electric, Inc.Company
Name LPA2S1 Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:29 PMCreated On Equipment Name LPA2S1
Tags Equipment Barcode
2021-08-11 13:14:44 2021-08-11 13:14:39 2021-08-11 13:14:34
2021-07-01 13:04:39 2021-04-26 12:59:57 2021-04-26 12:59:37
2021-04-26 12:59:32 2021-04-26 12:59:28 2021-04-26 12:59:24
Page 92 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
2021-04-26 12:54:29 2021-04-26 12:54:18 LPA2S1_Panel_Schedule_1.pdf
LPA2S1_BOM.pdf LPA2S1_Submittal.pdf (1 / 2)LPA2S1_Submittal.pdf (2 / 2)
LPA2S1_Panel_Schedule.pdf
Images for: LPA2S1 Panelboard Checklist (A) rev3 - AM120220052 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
Page 93 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:225 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Breaker 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
No 0
Comments
neneeded to install ground lugs for wire size
Page 94 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
Comments
Missing 150A breaker in schedule plan sheet.
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 15 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
Page 95 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 26 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
46 Record Phase to Phase Voltage B-C 210 0
47 Record Phase to Phase Voltage C-A 209 0
48 Record Phase to Neutral Voltage A-N 121 0
49 Record Phase to Neutral Voltage B-N 121 0
50 Record Phase to Neutral Voltage C-N 120 0
51 Record Phase to Ground Voltage A-G 121 0
52 Record Phase to Ground Voltage B-G 121 0
53 Record Phase to Ground Voltage C-G 120 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
Page 96 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
END OF START-UP PROCEDURE
Page 97 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220022ID Rosendin Electric, Inc.Company
Name LPA2S2 Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:06 PMCreated On Equipment Name LPA2S2
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-08-11 13:15:23 2021-08-11 13:15:19 2021-07-01 13:19:00
2021-04-26 13:06:45 2021-04-26 13:06:10 2021-04-26 13:06:03
2021-04-26 13:05:55 2021-04-26 13:05:51 2021-04-26 13:05:00
Page 37 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
2021-04-26 13:04:51 LPA2S2_Panel_Schedule_1.pdf LPA2S2_BOM.pdf
LPA2S2_Submittal.pdf (1 / 2)LPA2S2_Submittal.pdf (2 / 2)LPA2S2_Panel_Schedule.pdf
Images for: LPA2S2 Panelboard Checklist (A) rev3 - AM120220022 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2021 0
Page 38 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:John Flenoy 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:125 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Lug Only 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
21 Are the Main Breaker or Main Lug Only lugs the correct size, type, and
quantity per specification and design.
Yes 0
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
Yes 0
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
Yes 0
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
Yes 0
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
Page 39 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 15 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
Page 40 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 26 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
46 Record Phase to Phase Voltage B-C 210 0
47 Record Phase to Phase Voltage C-A 209 0
48 Record Phase to Neutral Voltage A-N 121 0
49 Record Phase to Neutral Voltage B-N 121 0
50 Record Phase to Neutral Voltage C-N 120 0
51 Record Phase to Ground Voltage A-G 121 0
52 Record Phase to Ground Voltage B-G 121 0
53 Record Phase to Ground Voltage C-G 120 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 41 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Details
AM120220007ID Rosendin Electric, Inc.Company
Name LPW1S Panelboard Checklist (A) rev3 Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:11 AMCreated On Equipment Name LPW1S
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-07-07 09:39:54 2021-04-23 10:37:55 2021-04-23 10:29:58
2021-04-23 10:29:55 2021-04-23 10:29:47 2021-04-23 10:29:44
2021-04-23 10:29:39 2021-04-23 10:29:32 LPW1S_Panel_Schedule_1.pdf
Page 11 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
LPW1S_Submittal.pdf (1 / 2)LPW1S_Submittal.pdf (2 / 2)LPW1S_BOM.pdf
LPW1S_Panel_Schedule.pdf
Images for: LPW1S Panelboard Checklist (A) rev3 - AM120220007 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (FIELD ON SITE LEVEL II RECEIVING)
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADER ATTACHMENT LOCATION**
PANEL CAN RECEIVING INFORMATION
1 Date the Panel Can was received?18 Mar 2021 0
2 Was the Panel can received free of any visible damage? (If "No" create
issue with pictures of damage and note)
Yes 0
3 Is the Panelboard Can size correct per submittals and/or manufacturers
bill of materials?
Yes 0
4 Panel Can received by:John Flenoy 0
PANEL INTERIOR & COVER RECEIVING INFORMATION
5 Date the Panel Interior was received?20 May 2020 0
Page 12 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
6 Date the Panel Cover was received?20 May 2021 0
7 Was the Panelboard Interior received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
8 Was the Panelboard Cover received free of any visible damage? (If "No"
create issue with pictures of damage)
Yes 0
9 Is the Panelboard Interior dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
10 Is the Panelboard Cover dimensions correct per submittals and/or
manufacturers bill of materials?
Yes 0
11 Was a clear picture of Nameplate Data taken?Yes 0
SIGN OFF
12 Panel Interior received by:Jeff 0
13 Panel Cover received by:John Flenoy 0
PANELBOARD NAMEPLATE DATA
14 Manufacturer:Square D 0
15 KAIC Rating:10 0
16 Current Rating:100 0
17 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)208Y/120V3Ø4W 0
18 NEMA Rating:Type 1 0
VERIFICATION
19 Per project design and drawings is the Panelboard required to be a Main
Breaker or Main Lug Only panel?
Main Breaker 0
20 Does the Panelboard have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
22 Are there adequate grounding and neutral lugs and ground bar kits per
installation requirements?
Yes 0
BREAKER VERIFICATIONS
23 Is the Main Breaker the correct frame size, type, and trip rating per
design, submittal, and specifications?
No 1
24 Are all branch circuit breakers the correct size/type and arranged per the
current project panel schedule.
No 1
25 Do all of the have factory torque marks and do all breakers feel tightly
connected?
Yes 0
26 Do the branch circuit breaker AIC ratings meet specification and design
requirements?
Yes 0
END OF SECTION ONE
Page 13 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION)
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
27 Inspection Date 16 Jun 2021 0
CONDUIT INSTALLATION VERIFICATION
28 Are all Conduit or MC Cable connectors installed per spec and NEC code
requirements?
Yes 0
29 Are all Panelboard KO's or unused opening sealed?Yes 0
WIRE & TERMINATION VERIFICATION
30 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
31 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
32 Are all Panelboard terminations properly torqued, sealed?Yes 0
33 Have pictures been taken of final terminations and conduit entries?Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is the final panel schedule affixed to the panel cover interior?Yes 0
35 Is there an ARC Flash label installed on the Panelboard cover per NFPA
70E?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the Panelboard clean, and free of all loose debris, material, and parts?Yes 0
37 Have photos been taken of final installed condition prior to covering and
securing the Panelboard?
Yes 0
38 Have all of the lugs and breakers been torqued to the proper value &
sealed?
Yes 0
39 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
40 Inspected By:John Flenoy 0
41 2nd Set of Eyes:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP)
NOTE: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this Panelboard.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
Page 14 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day Panelboard Checklist Details
Item #Item Text Response # Issues
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
42 Indicate Panelboard start-up date 26 Aug 2021 0
43 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING
44 Phase Rotation Verified?Yes 0
45 Record Phase to Phase Voltage A-B 210 0
46 Record Phase to Phase Voltage B-C 210 0
47 Record Phase to Phase Voltage C-A 209 0
48 Record Phase to Neutral Voltage A-N 121 0
49 Record Phase to Neutral Voltage B-N 121 0
50 Record Phase to Neutral Voltage C-N 120 0
51 Record Phase to Ground Voltage A-G 121 0
52 Record Phase to Ground Voltage B-G 121 0
53 Record Phase to Ground Voltage C-G 120 0
54 Has the MOP been followed as written and completed?Yes 0
55 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
56 Tested by: Electrician (1)Tim Ware 0
57 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 15 of 113Report run on 24 Nov 2021 12:56 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction MSB Checklist Details
Details
AM120220001ID Rosendin Electric, Inc.Company
Name MSB Low Voltage Switchgear Checklist rev1 (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:00 AMCreated On Equipment Name MSB
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
2021-07-01 08:35:02 2021-07-01 08:34:43 2021-07-01 08:34:32
2021-07-01 08:34:21 2021-07-01 08:34:11 2021-07-01 08:34:01
2021-07-01 08:33:52 2021-07-01 08:33:32 2021-07-01 08:32:31
Page 1 of 10Report run on 24 Nov 2021 12:52 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction MSB Checklist Details
2020-12-03 11:44:04 2020-12-03 11:43:57 2020-12-03 11:43:42
2020-12-03 11:43:34 2020-12-03 11:43:29 2020-12-03 11:43:23
2020-12-03 11:34:15 2020-12-03 11:31:16 2020-12-03 11:31:01
2020-12-03 11:30:07 2020-12-03 11:29:02 2020-12-03 11:28:16
Page 2 of 10Report run on 24 Nov 2021 12:52 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction MSB Checklist Details
2020-12-03 11:28:12 2020-12-03 11:28:06 2020-12-03 11:28:01
2020-12-03 11:27:20 2020-12-03 11:25:50 2020-12-03 11:25:35
2020-12-03 11:25:29 2020-12-03 11:25:24 2020-12-03 11:25:18
2020-12-03 11:25:10 2020-12-03 11:24:49 2020-12-03 11:24:10
Page 3 of 10Report run on 24 Nov 2021 12:52 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction MSB Checklist Details
2020-12-03 11:24:00 2020-12-03 11:23:43 2020-12-03 11:23:33
2020-12-03 11:23:11 2020-12-03 11:22:54 2020-12-03 11:08:09
2020-12-03 11:08:03 2020-12-03 11:07:57 2020-12-03 11:07:49
2020-12-03 11:07:43 2020-12-03 11:07:37 2020-12-03 11:07:30
Page 4 of 10Report run on 24 Nov 2021 12:52 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction MSB Checklist Details
2020-12-03 11:07:22 2020-12-03 11:07:09 2020-12-03 11:07:03
2020-12-03 11:06:57 2020-12-03 11:06:02 2020-12-03 11:05:36
2020-12-03 11:05:26 2020-12-03 11:05:17 2020-12-03 11:05:03
2020-12-03 11:04:42 2020-12-03 11:04:24 2020-12-03 11:04:05
Page 5 of 10Report run on 24 Nov 2021 12:52 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction MSB Checklist Details
2020-12-03 11:03:53 2020-12-03 11:03:44 MSB.pdf (1 / 4)
MSB.pdf (2 / 4)MSB.pdf (3 / 4)MSB.pdf (4 / 4)
MSB_BOM.pdf (1 / 2)MSB_BOM.pdf (2 / 2)MSB_Panel_Schedule.pdf
Images for: MSB Low Voltage Switchgear Checklist rev1 (A) - AM120220001 Checklist
Checklist Items
Item #Item Text Response # Issues
SECTION - ONE (LEVEL II RECEIVING) - Receiving Verification Section
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Date the LV Switchgear was received?02 Dec 2020 0
Page 6 of 10Report run on 24 Nov 2021 12:52 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction MSB Checklist Details
Item #Item Text Response # Issues
2 Was the LV Switchgear received free of any visible exterior damage? (If
"No" create issue with pictures of damage)
Yes 0
3 Was the LV Switchgear received free of any visible internal damage? (If
"No" create issue with pictures of damage)
Yes 0
4 Was a clear picture of Nameplate Data taken?Yes 0
LV SWGR NAMEPLATE DATA
5 Manufacturer:Square D 0
6 Voltage Rating, Phase, and Wire (e.g. 3ph,4wire)480Y/277V3Ø4W 0
7 Current Rating:2000 0
8 KAIC Rating:65 0
9 NEMA Rating:Type 1 0
VERIFICATION
10 Does the LV Switchgear nameplate match the submittal, specifications,
and drawings?
Yes 0
11 If there's a MCB, does if match the design spec and/or spec
requirements?
Yes 0
12 Do the Branch Circuit Breakers match the design spec and/or spec
requirements?
No 1
Comments
Branch breakers do not match the submittal. See marked up submittal in
header attachments.
13 Were there any loose ship parts shipped with the LV Switchgear? (If
"Yes" mark each piece with LV Switchgear name they belong to.)
Yes 0
14 Were all parts received?Yes 0
15 Does the LV Switchgear have a UL Label?Yes 0
TERMINATION AND LUG VERIFICATIONS
16 Did the manufacturer provide adequate phase lug landing spaces for the
quantity of cables per design and installation requirements?
Yes 0
17 Did the manufacturer provide adequate grounding lug landing spaces for
the quantity of cables per design and installation requirements?
Yes 0
18 Are the phase and ground lug hole patterns correct per design, specs
and submittal requirements?
Yes 0
DOCUMENTATION VERIFICATION
19 Has the Manufacturer provided the Factory Test Documentation? (If
"Yes" collect documents to turn over at close out)
No 0
20 Was the owners manual and installation instructions received with the
LV Switchgear? (If "Yes" make sure documentation remains with the LV
Yes 0
Page 7 of 10Report run on 24 Nov 2021 12:52 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction MSB Checklist Details
Switchgear or is collected for the Close Out Package)
Item #Item Text Response # Issues
SIGN OFF
21 LV Switchgear Received By:Jeff 0
22 LV Switchgear Receiving Inspection By:Aaron Mc 0
END OF SECTION ONE
SECTION - TWO (FIELD ON SITE LEVEL III INSPECTION) - Installation Verification Section
Note: After LV SWGR is installed, Megger Tested, Terminated and Torqued and before energizing!
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
INSPECTION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
23 Inspection Date 02 Jul 2021 0
CONDUIT INSTALLATION VERIFICATION
24 Are all pipe stub-ups installed per spec and NEC code requirements and
in the right sections of the LV Switchgear?
Yes 0
25 Are all conduits sealed per design and spec requirements? (where
applicable)
Yes 0
WIRE & TERMINATION VERIFICATION
26 Has the feeder wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
27 Has the branch wire (size, type and quantity) been installed correctly per
design and drawings?
Yes 0
28 Are all LV Switchgear terminations properly torqued, sealed?Yes 0
29 Have pictures been taken of final terminations and conduit entries?Yes 0
GROUNDING AND BONDING VERIFICATION
30 Is the LV Switchgear grounding complete per design, specs, and NEC
code?
Yes 0
31 Is the LV Switchgear bonding complete per design, specs, and NEC
code?
Yes 0
EQUIPMENT CIRCUIT BREAKER SETTINGS VERIFICATION
32 Have all adjustable circuit breaker settings been set per approved
coordination study?
Yes 0
33 Take pictures of all current/As-Left settings for project closeout Yes 0
LABEL & SIGNAGE VERIFICATION
34 Is there an ARC Flash label installed on the LV Switchgear cover per
NFPA 70E?
Yes 0
Page 8 of 10Report run on 24 Nov 2021 12:52 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction MSB Checklist Details
Item #Item Text Response # Issues
35 Are NETA 3rd party testing labels affixed to the LV Switchgear and
breakers showing completion?
Yes 0
GENERAL INSTALLATION VERIFICATION
36 Is the NEMA Rating of the LV Switchgear correct for the installation area?Yes 0
37 Are all section to section bus connections complete, torqued and sealed?Yes 0
38 If gear has GFCI protection, ensure that all terminations are on the
proper side of the Neutral bus CT.
Yes 0
39 If required has the main bonding jumper been installed between ground
& neutral?
Yes 0
40 Is the LV Switchgear clean, and free of all loose debris, material, and
parts?
Yes 0
41 Inspection Comments Installation Complete 0
SIGN OFF GF / FM
42 Inspected By:John Flenoy 0
SIGN OFF 2nd SET OF EYES
43 Inspected By:Brandon Peeler 0
END OF SECTION TWO
SECTION - THREE (FIELD ON SITE LEVEL IV START-UP) - Enerization Verification Section
Note: An MOP or Step By Step (SBS) is required by ROSENDIN safety to energize this LV SWGR.
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PRE-START-UP INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
GENERAL INFORMATION
44 Indicate LV Switchgear start-up date 30 Jul 2021 0
45 Energization Team Meeting & MOP Complete?Yes 0
ELECTRICAL SYSTEM COMMISSIONING - Energized Test Item (Verify All Test voltages)
46 Energize the Switch or Circuit Breaker.Yes 0
48 Phase Rotation Verified?Yes 0
49 Record Phase to Phase Voltage A-B 483 0
50 Record Phase to Phase Voltage B-C 483 0
51 Record Phase to Phase Voltage C-A 482 0
52 Record Phase to Neutral Voltage A-N 280 0
53 Record Phase to Neutral Voltage B-N 280 0
54 Record Phase to Neutral Voltage C-N 278 0
55 Record Phase to Ground Voltage A-G 280 0
Page 9 of 10Report run on 24 Nov 2021 12:52 AM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction MSB Checklist Details
Item #Item Text Response # Issues
56 Record Phase to Ground Voltage B-G 280 0
57 Record Phase to Ground Voltage C-G 278 0
58 Has the MOP been followed as written and completed?Yes 0
59 Are ALL voltage and rotation correct? Note: additional MOP steps are
required to proceed with downstream energization.
Yes 0
START-UP SIGN OFF
60 Tested by: Electrician (1)Brandon Peeler 0
61 Tested by: Electrician (2)Brandon Peeler 0
END OF START-UP PROCEDURE
Page 10 of 10Report run on 24 Nov 2021 12:52 AM by Aaron Mcleroy (amcleroy@rosendin.com)
1730 S. ANAHEIM WAY ANAHEIM WAY, CA 92805
PHONE (657) 276 0600
MEGGER
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220005ID Rosendin Electric, Inc.Company
Name HLA1N Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:09 AMCreated On Equipment Name HLA1N
Tags Equipment Barcode
2021-07-02 12:55:46 2021-07-02 12:55:42
Images for: HLA1N Megger Verification Checklist (A) - AM120220005 Checklist
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
Yes 0
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
conductor material by improper cable preparation)
Item #Item Text Response # Issues
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?9 0
PHASE TO PHASE VERIFICATION
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220035ID Rosendin Electric, Inc.Company
Name HLA1S Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:17 PMCreated On Equipment Name HLA1S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?14 0
PHASE TO PHASE VERIFICATION
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220041ID Rosendin Electric, Inc.Company
Name HLA2N Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:21 PMCreated On Equipment Name HLA2N
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:25 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?7 0
PHASE TO PHASE VERIFICATION
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220020ID Rosendin Electric, Inc.Company
Name HLA2S Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:25 AMCreated On Equipment Name HLA2S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:25 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?6 0
PHASE TO PHASE VERIFICATION
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220026ID Rosendin Electric, Inc.Company
Name HMA1N Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:10 PMCreated On Equipment Name HMA1N
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?6 0
PHASE TO PHASE VERIFICATION
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220029ID Rosendin Electric, Inc.Company
Name HMA1S Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:12 PMCreated On Equipment Name HMA1S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?5 0
PHASE TO PHASE VERIFICATION
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220050ID Rosendin Electric, Inc.Company
Name INV Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:28 PMCreated On Equipment Name INV
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
Page 15 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
10 Indicate quantity of branch conduit runs?1 0
PHASE TO PHASE VERIFICATION
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 16 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220044ID Rosendin Electric, Inc.Company
Name LMA1N Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:24 PMCreated On Equipment Name LMA1N
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?6 0
PHASE TO PHASE VERIFICATION
Page 17 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 18 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220032ID Rosendin Electric, Inc.Company
Name LMA1S Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:14 PMCreated On Equipment Name LMA1S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?8 0
PHASE TO PHASE VERIFICATION
Page 19 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 20 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220017ID Rosendin Electric, Inc.Company
Name LMA2N Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:22 AMCreated On Equipment Name LMA2N
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:25 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?5 0
PHASE TO PHASE VERIFICATION
Page 21 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 22 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220014ID Rosendin Electric, Inc.Company
Name LMA2S Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:20 AMCreated On Equipment Name LMA2S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:25 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?5 0
PHASE TO PHASE VERIFICATION
Page 23 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 24 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220059ID Rosendin Electric, Inc.Company
Name LPA1N1 Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:33 PMCreated On Equipment Name LPA1N1
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:19 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?7 0
PHASE TO PHASE VERIFICATION
Page 25 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 26 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220062ID Rosendin Electric, Inc.Company
Name LPA1N2 Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:35 PMCreated On Equipment Name LPA1N2
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?11 0
PHASE TO PHASE VERIFICATION
Page 27 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 28 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220011ID Rosendin Electric, Inc.Company
Name LPA1S1 Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:15 AMCreated On Equipment Name LPA1S1
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?8 0
PHASE TO PHASE VERIFICATION
Page 29 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 30 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220038ID Rosendin Electric, Inc.Company
Name LPA1S2 Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:19 PMCreated On Equipment Name LPA1S2
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?11 0
PHASE TO PHASE VERIFICATION
Page 31 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 32 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM042221002ID Rosendin Electric, Inc.Company
Name LPA1S3 Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
22 Apr 2021 1:22 PMCreated On Equipment Name LPA1S3
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee Megohmmeter 5882 0
2 Date Megger Performed:26 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?3 0
PHASE TO PHASE VERIFICATION
Page 33 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 34 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220056ID Rosendin Electric, Inc.Company
Name LPA2N1 Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:32 PMCreated On Equipment Name LPA2N1
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:25 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?8 0
PHASE TO PHASE VERIFICATION
Page 35 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 36 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220047ID Rosendin Electric, Inc.Company
Name LPA2N2 Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:26 PMCreated On Equipment Name LPA2N2
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:25 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?4 0
PHASE TO PHASE VERIFICATION
Page 37 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 38 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220053ID Rosendin Electric, Inc.Company
Name LPA2S1 Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:30 PMCreated On Equipment Name LPA2S1
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:19 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?7 0
PHASE TO PHASE VERIFICATION
Page 39 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 40 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220023ID Rosendin Electric, Inc.Company
Name LPA2S2 Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:08 PMCreated On Equipment Name LPA2S2
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:25 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?4 0
PHASE TO PHASE VERIFICATION
Page 41 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 42 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220008ID Rosendin Electric, Inc.Company
Name LPW1S Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:12 AMCreated On Equipment Name LPW1S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:27 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?3 0
PHASE TO PHASE VERIFICATION
Page 43 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 44 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220002ID Rosendin Electric, Inc.Company
Name MSB Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:03 AMCreated On Equipment Name MSB
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:02 Jun 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
Page 45 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
10 Indicate quantity of branch conduit runs?11 0
PHASE TO PHASE VERIFICATION
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 46 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220065ID Rosendin Electric, Inc.Company
Name TMA1N Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:42 PMCreated On Equipment Name TMA1N
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?1 0
PHASE TO PHASE VERIFICATION
Page 48 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N N/A 0
18 Phase(s) B to N N/A 0
19 Phase(s) C to N N/A 0
20 Ground to Neutral N/A 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 49 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220069ID Rosendin Electric, Inc.Company
Name TMA1S Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:58 PMCreated On Equipment Name TMA1S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?1 0
PHASE TO PHASE VERIFICATION
Page 50 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 51 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220081ID Rosendin Electric, Inc.Company
Name TPA1N Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 1:48 PMCreated On Equipment Name TPA1N
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:TPA1N 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:Jon Fragulia 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?2 0
PHASE TO PHASE VERIFICATION
Page 52 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 53 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220077ID Rosendin Electric, Inc.Company
Name TPA1S Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 1:45 PMCreated On Equipment Name TPA1S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:18 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?2 0
PHASE TO PHASE VERIFICATION
Page 54 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N >2G 0
18 Phase(s) B to N >2G 0
19 Phase(s) C to N >2G 0
20 Ground to Neutral >2G 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 55 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Details
AM120220073ID Rosendin Electric, Inc.Company
Name TPA2S Megger Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 1:41 PMCreated On Equipment Name TPA2S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE MEGGER VERIFICATION
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
NOTE: Megger verification to be completed on branch wiring of equipment. The equipment feeder wires are verified when the upstream equipment is meggered.
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
1 Equipment ID:Greenlee 5882 Megohmmeter 0
2 Date Megger Performed:19 May 2021 0
3 Megger Performed By:John Leyvas 0
4 Megger S/N:07EE1425DV 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is the insulation or conductor material of the phase, neutral or ground
conductor wire(s) free from damage? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
BRANCH CONDUIT QUANTITY VERIFICATION
10 Indicate quantity of branch conduit runs?1 0
PHASE TO PHASE VERIFICATION
Page 56 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
370261 - Harbor Day School
Construction Harbor Day School Megger Checklist Details
Item #Item Text Response # Issues
11 Phase(s) A to B >2G 0
12 Phase(s) B to C >2G 0
13 Phase(s) A to C >2G 0
PHASE TO GROUND VERIFICATION
14 Phase(s) A to G >2G 0
15 Phase(s) B to G >2G 0
16 Phase(s) C to G >2G 0
PHASE & GROUND TO NEUTRAL VERIFICATION
17 Phase(s) A to N N/A 0
18 Phase(s) B to N N/A 0
19 Phase(s) C to N N/A 0
20 Ground to Neutral N/A 0
2nd LOOK VERIFICATION
21 2nd Look Verification By:John Flenoy 0
Page 57 of 57Report run on 23 Nov 2021 8:43 PM by Aaron Mcleroy (amcleroy@rosendin.com)
1730 S. ANAHEIM WAY ANAHEIM WAY, CA 92805
PHONE (657) 276 0600
TORQUE
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220006ID Rosendin Electric, Inc.Company
Name HLA1N Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:10 AMCreated On Equipment Name HLA1N
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:25 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220036ID Rosendin Electric, Inc.Company
Name HLA1S Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:17 PMCreated On Equipment Name HLA1S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:28 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220042ID Rosendin Electric, Inc.Company
Name HLA2N Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:22 PMCreated On Equipment Name HLA2N
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:27 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220021ID Rosendin Electric, Inc.Company
Name HLA2S Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:25 AMCreated On Equipment Name HLA2S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:27 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220027ID Rosendin Electric, Inc.Company
Name HMA1N Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:10 PMCreated On Equipment Name HMA1N
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:18 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220030ID Rosendin Electric, Inc.Company
Name HMA1S Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:13 PMCreated On Equipment Name HMA1S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:01 Jun 2021 0
3 Torque Performed By:John Leyvas 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220051ID Rosendin Electric, Inc.Company
Name INV Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:28 PMCreated On Equipment Name INV
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:INV 0
2 Date Torque Performed:23 Nov 2021 0
3 Torque Performed By:Field 0
4 Torque wrench S/N:Check documentation 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?Breaker 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220045ID Rosendin Electric, Inc.Company
Name LMA1N Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:24 PMCreated On Equipment Name LMA1N
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:20 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220033ID Rosendin Electric, Inc.Company
Name LMA1S Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:15 PMCreated On Equipment Name LMA1S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:01 Jun 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?Breaker 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220018ID Rosendin Electric, Inc.Company
Name LMA2N Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:23 AMCreated On Equipment Name LMA2N
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:27 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220015ID Rosendin Electric, Inc.Company
Name LMA2S Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:20 AMCreated On Equipment Name LMA2S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:27 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220060ID Rosendin Electric, Inc.Company
Name LPA1N1 Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:34 PMCreated On Equipment Name LPA1N1
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:27 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:6 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:2 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:2 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?Breaker 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220063ID Rosendin Electric, Inc.Company
Name LPA1N2 Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:36 PMCreated On Equipment Name LPA1N2
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:27 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:6 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:2 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:2 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220012ID Rosendin Electric, Inc.Company
Name LPA1S1 Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:16 AMCreated On Equipment Name LPA1S1
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:01 Jun 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:6 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:2 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:2 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?Breaker 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220039ID Rosendin Electric, Inc.Company
Name LPA1S2 Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:19 PMCreated On Equipment Name LPA1S2
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:01 Jun 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM042221003ID Rosendin Electric, Inc.Company
Name LPA1S3 Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
22 Apr 2021 1:24 PMCreated On Equipment Name LPA1S3
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench Wright 3447 Torque Wrench 0
2 Date Torque Performed:01 Jun 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220057ID Rosendin Electric, Inc.Company
Name LPA2N1 Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:32 PMCreated On Equipment Name LPA2N1
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:27 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220048ID Rosendin Electric, Inc.Company
Name LPA2N2 Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:27 PMCreated On Equipment Name LPA2N2
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:27 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220054ID Rosendin Electric, Inc.Company
Name LPA2S1 Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:30 PMCreated On Equipment Name LPA2S1
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:27 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?Breaker 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220024ID Rosendin Electric, Inc.Company
Name LPA2S2 Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:08 PMCreated On Equipment Name LPA2S2
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:27 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220009ID Rosendin Electric, Inc.Company
Name LPW1S Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:12 AMCreated On Equipment Name LPW1S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:01 Jun 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:1 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220003ID Rosendin Electric, Inc.Company
Name MSB Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 8:04 AMCreated On Equipment Name MSB
Tags Equipment Barcode
Custom Properties
Checklist Status Complete
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:03 Jun 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:18 0
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:0 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:6 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?Breaker 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220066ID Rosendin Electric, Inc.Company
Name TMA1N Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:43 PMCreated On Equipment Name TMA1N
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:27 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:0 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:2 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220070ID Rosendin Electric, Inc.Company
Name TMA1S Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 12:58 PMCreated On Equipment Name TMA1S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:27 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:0 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:3 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220082ID Rosendin Electric, Inc.Company
Name TPA1N Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 1:49 PMCreated On Equipment Name TPA1N
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:TPA1N 0
2 Date Torque Performed:28 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:2 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:3 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220078ID Rosendin Electric, Inc.Company
Name TPA1S Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 1:46 PMCreated On Equipment Name TPA1S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:01 Jun 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
No 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:1 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:2 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Details
AM120220074ID Rosendin Electric, Inc.Company
Name TPA2S Torque & Termination Verification Checklist (A)Priority
Description Status Open
Author amcleroy@rosendin.com Location Harbor Day School
02 Dec 2020 1:43 PMCreated On Equipment Name TPA2S
Tags Equipment Barcode
Checklist Items
Item #Item Text Response # Issues
WIRE, TERMINATION, HARDWARE & TORQUE VERIFICATION
VERIFICATION INSTRUCTIONS **If ALL Checklists Items have not been completed create an issue for Follow-Up**
NOTE: A 'No' or 'Other' answer requires an explanation in the comment section.
PHOTO INSTRUCTIONS **ALL PICTURES ARE TO BE TAKEN IN THE HEADE ATTACHMENT LOCATION**
GENERAL INFORMATION
1 Equipment ID:Wright 3447 Torque Wrench 0
2 Date Torque Performed:27 May 2021 0
3 Torque Performed By:Jon Fragulia 0
4 Torque wrench S/N:0113004613 0
WIRE VERIFICATION
5 Are the phase, neutral & ground/bonding conductor size(s) and quantity
correct per the current contract documents?
Yes 0
6 Is there any visible damage to the insulation or conductor material of the
phase, neutral or ground conductor wire(s)? (this includes scoring of the
conductor material by improper cable preparation)
Yes 0
7 Are all conductors routed to prevent inductive heating, protected from
sharp edges, properly supported for strain relief, and have bends made
to conform to the project specifications and/or the National Electric Code
for proper cable bend radius?
Yes 0
8 Are all conductors properly braced (cable lashing) to maintain AIC
withstand rating of the equipment per the manufacturer installation
instructions?
Yes 0
9 Are all required conductor identification labels installed and verified
correct for all phase, neutral, and ground conductors?
Yes 0
FEEDER PHASE TERMINATIONS
10 Quantity of Feeder Phase Conductors:3 0
370261 - Harbor Day School
Construction Harbor Day Torque Checklist Details
Item #Item Text Response # Issues
FEEDER NEUTRAL TERMINATIONS
11 Quantity of Feeder Neutral Conductors:0 0
FEEDER GROUND/BOND TERMINATIONS
12 Quantity of Feeder Ground/Bond Conductors:2 0
BRANCH PHASE TERMINATIONS
13 Are all of the Branch Phase Conductors Torqued?Yes 0
BRANCH NEUTRAL TERMINATIONS
14 Are all of the Branch Neutral Conductors Torqued?Yes 0
BRANCH GROUND/BOND TERMINATIONS
15 Are all of the Branch Ground/Bond Conductors Torqued?Yes 0
HARDWARE VERIFICATION
16 Is the proper hardware type & size(s) correct per the current contract
documents?
Yes 0
TORQUE VERIFICATION
17 Are all Bolts / Screws Torque Marked?Yes 0
18 How was the torque value determined?NETA 0
2nd LOOK VERIFICATION
19 2nd Look Verification By:John Flenoy 0