HomeMy WebLinkAbout7.01_Special Inspection Final_200556.1 Harbor Day School Final_ Twining18011 Sky Park Circle Suite J Irvine CA 92614 Tel 949.553.0370 Fax 949.553.0371
Date: November 10, 2021 Twining Project No.: 200556.1 Permit Number: X2019-3593 BLD 0025-21
Mr. Mike Colman
Harbor Day School 3443 Pacific View Drive Corona Del Mar, CA 92625
Subject: Final Report of Special Inspection and Testing
Project: Harbor Day School 3443 Pacific View Dr, Corona Del Mar, CA 92625
Mr. Mike Colman,
This letter may be considered the final report and is to affirm the material testing and inspections services by registered special inspectors, performed between
August 28, 2020 and August 16, 2021, through Twining Consulting, Inc., on the:
Reinforced Concrete: Inspection of placing, sampling; Reinforcing Steel: Inspection of placement; Pre-stressed/Post-Tensioned: Inspection of placement and stressing Masonry: Inspection of Masonry placement Structural Steel: Inspection of field welds; Non-destructive Testing: Non-destructive Testing Laboratory Testing: Services were performed by Twining, Inc.
To the best of our knowledge, all the inspected work requiring special inspection for the structures constructed under the subject permits as indicated in the scope of work
is in conformance with approved plans, revisions, specifications, approved inspection and testing program, and the applicable workmanship provisions of the California
Building Code.
This letter and our services reports do not relieve the contractor of being solely responsible for the work performed to conform to the approved plans and
specification, and the requirement of the governing jurisdictions and Building Code.
Should you need additional information, please do not hesitate to contact at: (714) 743-7012/ Jkim@twiningconsulting.com.
TWINING CONSULTING, INC.
Respectfully Submitted by: Jasper Kim