Loading...
HomeMy WebLinkAbout2.01_Line and Grade Survey Cert_20210128 Slab Cert South_SetbacksandTopofSlabFloorE CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive | P.O. Box 1768 | Newport Beach, CA 926588915 www.newportbeachca.gov | (949) 644-3200 SETBACKS AND TOP OF SLAB/FLOOR ELEVATION CERTIFICATE The purpose of this certificate is to insure that the structure is located properly on site per the approved drawings. This certificate also verifies the top of slab/floor elevation noted on the approved drawings. After the top of slab/floor elevation is verified to match the elevation specified on the approved drawings, the contractor and inspector can measure the height of the structure to the top of slab/floor to verify that it is equal or less than the dimension shown on building sections and elevations. This form must be filled out by a registered surveyor or civil engineer authorized to perform surveys. The survey must be done after the concrete forms are in place or preferable after the concrete slab is poured or raised floor is built, but prior to starting wall framing. Engineer/Surveyor’s Name _____________________________________ License # _______________ Engineer/Surveyor’s Address ___________________________________________________________ Job Address _________________________________________________________________________ Setbacks: Sketch a site plan and specify surveyed setbacks (use back page). * Top of slab/floor elevation: ___________________________________________________________ * If slab/floor elevation varies, sketch a plan or section through slab on the back page and specify the elevations. Use same datum used in the survey of record. I certify that the setbacks are , are not , per City approved plans. Describe any deviations from plans: __________________________________________________________________________ I certify that top of slab/floor elevation(s) is , is not , per City approved drawings. Describe any deviations from plans: ______________________________________________________________ ______________________________ _____________________________________________ Date Engineer/Surveyor’s stamp and signature Forms/SetbacksandTopofSlabElevationCert. Christopher W. Daniels, IMEG Corp.PLS 6328 901 Via Piemonte, Suite 400 Ontario, CA 91764 3443 Pacific View Drive, Corona Del Mar, CA 92625 FF=310.00, TOP 6" STEM WALL=310.50 X X JANUARY 28, 2021 Certifying South half of building only, from the previous concrete pour bulkhead between gridlines U & V to the south end of the building. See sketch. Certifying South half of building only, to +/- 0.10', from the previous concrete pour bulkhead between gridlines U & V to the south end of the building. See sketch. *SOUTH HALF OF BUILDING SLAB* F7 F7 F9 F7 F6 F5 F9 F7 F7 K M N S S P R Q CC CC 1 1 4 4 10 10 18 18 22 22 25 25 27 27 Z Z AA AA 2 2 6 6 3 3 5 5 23 23 21 21 24 24 26 26 S S T U X Y W V DD 19 19 16 16 13 8 BB 23.5 HARBOR DAY SCHOOL Building Certification - SOUTH 2021-01-25 No Scale FF=310.00 TOP STEM WALL/CURB AT PERIMETER=310.50