HomeMy WebLinkAboutN2018-0355City of Newport Beach IIIIIIII IIIIIII I�III�IIIII�IIIIIIIIII Permit No: N2018-0355
100 Civic Center Drive, Newport Beach, CA 92660 II I� N 2 0 1 8 0 3 5 5
' Permit Counter Phone (949)644-3311 Project No
v Online Inspection Request - www newportbeachca gov / Online ``��
�` Services SGAN N [_z_J
,I#)t,"o, Inspection Requests Phone (949)644-3255
Job Address: 466 FLAGSHIP RD NB Thomas:Guide: 888H5
Description Install 63 LF of 2-inch duct and a 2'x3' fiber vault on Flagship Road at alley. Concrete and alley restoration per City Standards.
Parcel # 4252-611-9 -
Legal Desc : IRVINE SUB LOT 169 BLK 2 POR OF LOT AS PER DD-7462/285 OR -
Owner: SMV NEWPORT BEACH LP Contractor: L & G CABLE CONSTRUCTION COMPANY INC
Phone: 0 Phone: 714-630-6274
Address : 45 BROADWAY #25 Address : 3776 E. MIRALOMA AVE
NEW YORK, NY ANAHEIM
Contractor State Lic: 637898
Applicant: CHARTER COMMUNICATIONS License Expire : 02 29, 2020
Phone: 714-709-3390 [
Address : 7142 CHAPMAN AVENUE
GARDEN GROVE, CA 92841 Business License : BT30037502
Business Expire : 11 30, 2018
Special Cond.: Pre -job inspection required. Workers' Compensation Insurance - -
Carrier : STATE COMPENSATION INS FUND
Policy No: 9105662
W. C. Expire: 07 08, 2019
Permit Processing Fee . $241.00 Sewer Connection : $0.00 Total Fee $736.00
Agreement Fee . $0.00 4TT Box Cover: $0 00 Paid : $736.00
Traffic control Plan Check : $0.00 Total Water Meters : $0.00 Balance : $0.00
Inspection Fee - $495.00 Water Meter Connection : $0 00 Receipt No:
Refundable Deposit $0.00 Total Water Meter Box: $0.00
Street Tree Fee $0.00 Adjustment : $0.00
Processed By. Date. _/ ! Other Department Date
Utilities Approval : Date _/_/ Permit Denied Date
Z / _� 1
Traffic Approval : Date . _/_/ Issued Permit Date .
General Services Approval Date _/_/
FEE WORKSHEET FOR ENCROACHMENT PERMIT
CITY OF NEWPORT ,F3EACH
PUBLIC WORKS DEPARTMENT
All Fees Are Non -Refundable Unless Otherwise Stated
PROJECT ADDRESS:
`► �� 5 P
PERMIT
N2018-
NUMBER:
APPLICANT:
Chor:c.� n.n�nCpi,3»S10
Ot COMPLETED BY PUBLIC WORKS DEPARTMENT
Permit Processing Fee:
Public Works Only
Other Department
Agreement Fee:
Preparation of Report/Agreement
Document Recordation Fee
Monitoring Wells
Q Inspection Fee:
$241.00 Public Works Field Inspection
$275.00 Utilities Field inspection
General Services Inspection
Water Quality/Artificial Turf Inspection
$817.00
$192001 Refundable Deposit:
$502 00= Improvements
Qty.
$165 00 3
$121.00
$165.00
$108 00
TBD
TBD
Street/Alley/Walk Closure: $65.000 Newspaper Rack Inspection $108 00 0
Traffic Control Plan Check
8-1/2" x 11" $65.00 Sewer Connection Fee $250 00
24" x 36" $143.00 El 4TT Box & Cover $64.00
Additional
! --------
I THE FOLLOWING ITEMS REQUIRE APPROVAL FROM THE lFe7erurDii7lision
REVENUE DIVISION PRIOR TO PAYMENT OF FEES Approval:
Qty.
(Water Meter:
Installation Charge $528.001
13/4" Meter
$50.25
11" Meter
$121.50
Water Meter Boxes:
11 1/2" Meter
$285.00
1" DFW Meter Box $96.66
11 1/2" Turbine Meter
$700.00
2" DFW Meter Box $203 24 B
12" Meter
$425.00
1
12" Turbine Meter
$845.00
13" Meter
$3,310 00
14" Meter
$4,730.00
16" Meter
$7,190.00
Certificate of Compliance Fee (+100% of hrly over 3 hrs)
$288.00
5200-5029
Development Services Fee (Plan check hourly)
$155.00
5200-5015
Final Tract Map Checking Fee
$2,488 00
5200-5026
Final Parcel Map Checking Fee - Moderate
$2,488.00
5200-5027
Lot Line Adjustment Fee
$1,079 00
5200-5028
Park Dedication Fee Zone
TBD
405-470
Street Ease ment/Vacation Fee (+100% of hrly over 4 hrs)
$1,022.00
5200-5031
Street Tree Fee ($700 Planting Fee)
TBD
030-2284
Engineering Tech:
Total Amount Due:
For Finance Use only
2w;
* -; 3w . -
ist
Permi7le4�1(
Receipt No.
f /userslbbw/shared/encroach/masters/ep front and back masters/
Rev 12/18/2017
epfeesheetxls-remseedtt/8/'7
ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR
Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 800-422-4133
TERMS AND CONDITIONS OF ENCROACHMENT PERMIT
WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code)
1
Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor A licensed
I certify that I have a Certificate of consent to self -ins re, Certificate of Worker's
contractor must provide a 'Letter of Authorization' to allow another party to pull a permit An approved copy of the
Compensation Insurance, or a Certified CoPw the f
permit and construction plan shall be kept at the job site at all times Work which has been done prior to issuance of
_
a permit is subject to rejection/fine City reserves the right to void permit if work does not commence within 30 days
Date: Signature:
after date of issuance
CERTIFICATE OF EXEMPTION (Section 3800 Labor Code)
2 The Pernuttee agrees to defend indemnify and hold the City, its authorized agent officers, representatives and
employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss
I certify that in the performance of the work under this permit, I shall not employ
or damage to persons or property occurring as a result of work undertaken under this permit
any person so as to become subject to California Worker's Compensation Laws. If,
3
All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings
after signing this certificate I become subject to the Worker's Compensation
of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances
provisions of the State Labor Code, I must comply with the provisions of Section
4
Permittee guarantees all work performed under this permit to be free of hidden and latent defects Any failures shall
3700 or this permit shall be deemed revoked.
be corrected within two weeks after notification to the satisfaction of the Public Works Director
5
A valid State licensed contractor must perform all construction within the public right-of-way unless waived by the
Date: Signature:
Public Works Director A valid State Contractor License Class A can perform any work in the public right-of-way For
construction or connection to water Imes a valid State Contractor License Class C-34 is required For construction or
CONTRACTOR LICENSE EXEMPTION
connection to sewer lines a valid State Contractor License Class C-42 is required
6
All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L,
As the Owner of the benefiting property, I certify I am personally performing all
in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public
work in the Public Right -of -Way.
Works Dept Contractors shall obtain permits to perform excavation or trench work from the California Division of
Date: Signature:
Industrial Safety prior to commencing underground construction as required by State law Walls and faces of all
excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent
means Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected
HOLD HARMLESS STATEMENT
7
The Public Works Department Inspectors must inspect all work in the Public right-of-way Forms and subgrade must
I understand that I am locating minor encroachments within the City Right -of -
be inspected and approved before concrete is ordered/poured Sewer, pipelines, and subgrade construction must be
Way/Easement. As property owner it is my responsibility to maintain the
inspected and approved before backfilling, or applicant may be required to excavate site Separate Utilities
encroachments. I will be responsible for replacing the improvements if the City
Department or General Services Department inspections may be required depending on scope of work performed
removes them for maintenance of utilities or other public need. I shall indemnify
8
All trench restoration must be inspected by the Public Works Department No utility installation(s) shall be allowed
and hold the City harmless for any liability associated with the minor
over or within 5 feet of any City utilities, unless approved by the Public Works Department Locate and pothole
encroachments.
existing City -owned utilities lie water sewer, or street lighting conduits) to verify locations Maintain a one -foot
clearance over or under existing City -owned utilities Sewer cleanouts require VCP or PVC SDR35 be used with a
Date: Signature:
4TT box over the riser
24-hour notice for Encroach ent Perini In c in is required by calling
9 Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions All
"Manual
signs flags, lights and other warning and safety devices shall conform to the requirements of the current of
Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the
Public Works at 949-644-3311.
California Department of Transportation If needed barricades can be obtained from the City at a charge of $10 00
15 Any above ground utility faahti w 'require documented approval from the adjacent
per barricade per day, with a minimum charge of $35 00 It is the responsibility of the applicant to place barricades to
protect the general public Access to fire hydrants must be maintained at all times
affected property owner(s)
10
Work within or near beach sensitive areas will not be allowed during City holidays, spring break, Memorial Day
16 Homeowner, contractors, and subcontracotrs may each be liable for violations of Water
er
weekend, summer between June 15 and September 15, and during the holiday season from December 19 to
Quality Laws Best Management Practices will be enforced t is against the law to
11
January 1 unless approved by the Public Works Department
Any wolf, that extends into traffic or lanes and impedes the normal flow traffic requires the applicant to
discharge construction debris into the gutter and storm drain Felony violations of Water
Pere
acquire a Temporary Street Closure Perrnrt from the Public Works Department Access for fire, police and
Quality Laws are punishable by fines up to $25,000 and/or up to three years in State
prison plus the full cost to clean up an illegal discharge or spill
emergency vehicles must be maintained at all times Traffic Control must be per Work Area Traffic Control
refundable deposit was paid, applicant must submit a Soils Compaction
e r a 17 If fu
It a fu
Handbook (WATCH) No nighttime traffic lane closures, unless prior approval has been granted Any lane(s) closure
on a major street will only be allowed between 9:00 a.m, and 3:00 p.m. (Monday thru Friday) unless approved by
or Evidence of a Slurred Backfill and request a final inspection from the
the Public, Works Department Any work affecting the State Highway's traffic or within the State Highway right-of-way
Public Works Department Monies may be held for six months after final inspection
will require a Caltrans Permit All vehicles shall be lawfully parked
before a refund will be processed
1J
This permit does not authorize the closure of sidewalks streets or alleys for construction access, storage of
18 No trees in the public right-of-way shall be planted, removed, trimmed, or relocated
materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure
without approval from the General Services Department
13
Applicant must notify USA at 1-800.227-2600 2 days before starting any underground construction. Applicant
19 All work In the public right-of-way must meet the approval of the Public Work,
must notify all affected residents 24 hours in advance of restricted access and any inconveniences
Department or corrections will be required (i.e removals, exposing connecboos,
14
Pefuse or unused materials shall be removed within 24 hours after completion of the work If not removed, the City
etc ) Additional inspection fees may be required
niay remove and bill the applicant Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066
20 Permit is for standard materials in the public right-of-way only, unless previously
for the collection schedule so service is not interrupted To place a dumpster or materials in the public right-of-way, a
approved by Public Works and an Encroachment Agreement has been processed
Terporary Street Closure Permit must be obtained from the Public Works Department
21 Permit is valid for "description" of work noted on front only Additional work
performed may require issuance of a separate permit and/or additional fees
No work related to this encroachment permit shall be performed until the Public Works Department has issued this permit. Applicant hereby acknowledges he/she has read nderstands the terms and
conditions of this permit and he/she agrees to abide by them. Permit is void if work is not commenced within 30 days after issuance. �j
Permit fees are nonrefundable. Date��� _� ���_ b_ Signatur / _
Almendralo, Rodi
From:
Barrios, Joe <Joe. Barrios@charter.com >
Sent:
Friday, July 06, 2018 10:44 AM
To:
Almendralo, Rodi
Cc:
Barrios, Joe; 'Darryl'
Subject:
RE: 466 FLAGSHIP - SAVA SENIOR CARE
Attachments:
Permit Drawing.pdf
Hi Rodi,
I finally got my drawing for 466 Flagship. L&G will be doing the work. please provide me a cost and I will request a check.
Thankyou
Charter
Joe Barrios I Construction Coordinator 3 1(0)714.591.4880 (M)714.709.3390
7142 Chapman Ave I Garden Grove, Ca 92841
From: Almendralo, Rodi [mailto:RAlmendralo@newportbeachca.gov]
Sent: Thursday, May 24, 2018 8:43 AM
To: Barrios, Joe <Joe.Barrios@charter.com>
Subject: RE: 466 FLAGSHIP - SAVA SENIOR CARE
Hi Joe,
This job will just require an encroachment permit. No traffic control will be necessary. Any traffic control shall be per
WATCH.
Thanks,
Rodi
From: Barrios, Joe[mailto:Joe.Barrios@charter.com]
Sent: Thursday, May 24, 2018 7:03 AM
To: Almendralo, Rodi <RAlmend ralo@newportbeachca.gov>
Cc: Barrios, Joe <Joe.Barrios@charter.com>
Subject: 466 FLAGSHIP - SAVA SENIOR CARE
Hi Rodi,
I am supposed to use an Engineering contractor to pull permits for me now. I am going to send them this one but look at
the attachment and let me know if I need T/C permit. That way I can just have them pull the Encroachment permit for
the 55ft bore. I can have them email me the scope of work and send it to you. This is a new policy that I have to go by
now even though it can take several weeks longer just to get a permit for something this simple. See if this is ok without
TC. Thank you
Charter
Joe Barrios I Construction Coordinator 3 1(0)714.591.4880 (M)714.709.3390
7142 Chapman Ave I Garden Grove, Ca 92841
The contents of this e-mail message and
any attachments are intended solely for the
addressee(s) and may contain confidential
and/or legally privileged information. If you
are not the intended recipient of this message
or if this message has been addressed to you
in error, please immediately alert the sender
by reply e-mail and then delete this message
and any attachments. If you are not the
intended recipient, you are notified that
any use, dissemination, distribution, copying,
or storage of this message or any attachment
is strictly prohibited.
The contents of this e-mail message and
any attachments are intended solely for the
addressee(s) and may contain confidential
and/or legally privileged information. If you
are not the intended recipient of this message
or if this message has been addressed to you
in error, please immediately alert the sender
by reply e-mail and then delete this message
and any attachments. If you are not the
intended recipient, you are notified that
any use, dissemination, distribution, copying,
or storage of this message or any attachment
is strictly prohibited.
1.
ASSUME SOLE AND COMPLETE RESPONSIBILITY OF THE JOB SITE (
COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING THE S)
AND PROPERTIES THAT THESE REQUIREMENTS SHALL APPLY CON
p3
LIMITED TO NORMAL WORKING HOURS AND CONDITION. THE CONT
d
TO DEFEND, INDEMNIFY AND HOLD PERMITEE, REPRESENTATIVE;
/
HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED IN CC
PERFORMANCE OF THE WORK ON THIS PROJECT.
/ ` Ry
f '
2.
PRIOR TO THE BEGINNING OF ANY CONSTRUCTION AND THROUGH
CONSTRUCTION WORK, THE CONTRACTOR
^ryh
`
f
SHALL FULLY COMPLY'
"CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH" ACT OF 19731
AND AMENDMENTS THERETO.
SS' /
3.
ALL WORK SHALL CONFORM TO THE LATEST EDITION OF GO 95,12
�pp
'
"SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION', AS ADOP-
y
13' BORE
OR STATE AS MODIFIED BY STANDARD PLANS AND ADDENDUMS.
BP t
4.
THE EXISTENCE AND LOCATION OF UTILITIES AND OTHER AGENCY
PLACE 2'X3' TIME WARNER FIBER
J
HEREON ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. 0
PH
(VAULT IN SIDEWALK. STA 1+82 - y B_CF
THE CONTRACTOR SHALL VERIFY PRIOR TO THE START OF CONST
1 2 "
EXTREME CARE AND PROTECTIVE MEASURES TO PREVENT DAMA(
THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL
f
63 '
FACILITIES WITHIN THE LIMITS OR WORK, WHETHER THEY ARE SH(
i
f
VT - EX.CATV CONDUIT
50' BORE
5.
THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT
�h
& EXIST ATV CONDUIT
0 WORKING DAYS PRIOR TO THE START OF ANY EXCAVATION.
CgP�
`
ILOCATE
N ASPHALT STA 1 34 1 FCF
6.
THE CONTRACTOR SHALL NOTIFY THE INSPECTION DEPARTMENT,
TWO DAYS BEFORE START OF ANY WORK REQUIRING THEIR INVOL
i
7.
ALL WORK AREA AND STREET TRAFFIC CONTROL SHALL BE IN ACC
SPECIFICATIONS OF THE MUTCD AND SPECIFICATIONS FROM THE
Sc�C
8.
THE CITY, COUNTY OR STATE SHALL SPECIFY THE EXPIRATION PEI
v n ^o
THIS CONSTRUCTION PROJECT.
,/ 4
9.
THE MINIMUM COVER FOR ALL CONDUITS PLACED UNDERGROUND
WITH CITY, COUNTY OR STATE REQUIREMENTS.
10.
THE CONTRACTOR SHALL PUNCH THROUGH & BORE ALL CURB AN[
55
CONCRETE DRIVEWAYS AND WALKWAYS AT THE DIRECTION OF TF
INSPECTION.
j
11.
ALL ASPHALT CONCRETE AND/OR CONCRETE PAVEMENT SHALL BE
\
DIRECTION OF THE CITY, COUNTY OR STATE ENGINEERS.
0
12.
ALL SHRUBS, PLANTS OR TREES THAT HAVE BEEN DAMAGED OR D
COURSE OF THE WORK, SHALL BE REPLANTED AND OR REPLACED
g
WORK SITE TO ITS ORIGINAL CONDITION. EXISTING STREET TREES
q
PLACE.
13.
IF DAMAGE OCCURS TO THE CITY OR COUNTY FACILITIES, THE COf
s•
IMMEDIATELY NOTIFY: NEWPORT BEACH 8 (949) 644-3311 CITY OWF
F'
14.
AT LEAST TWO DAYS PRIOR TO THE COMMENCEMENT OF ANY WOF
NOTIFY THE POLICE DEPARTMENT AND THE FIRE DEPARTMENT.
N20116 t>35�
TOTAL EXCAVATION: 63'
BORE 63 LF
ASPHALT CUT 0 LF
DIRT CUT 0 LF
S/W R&R 40 SF
BORE PITS (PAVEMENT) 2
POTHOLES (PAVEMENT) 2
CONTRACTOR NOTICE:
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR
STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY FIELD INSPECTION
AND A SEARCH OF THE AVAILABLE CRY OR COUNTY RECORDS. SINCE THE
ACTUAL LOCATION AND NATURE OF THE UNDERGROUND FACILITIES MAY BE
SOMEWHAT DIFFERENT FROM THAT SHOWN, THE CONTRACTOR IS REQUIRED TO
VERIFY THE INFORMATION THROUGH UNDERGROUND SERVICE ALERT (USA) OR
BY CONTACTING THE UTILITY COMPANIES DIRECTLY, PRIOR TO EXCAVATION,
Any proposal to Install underground utility facilities within the City must
use the To l law ing procedures and requirements:
1. All new condo its must be constructed in the parkway per 'Park
U lit ity trench Detail' (attached) Unless otherwise approved by the
Public Works Department. Final trench restoration shall be
Perovitlee As *it'I'Upla liltone nsew kth Rrthm;v al lins1a'eo llecllitie s
.
t y day, (310)110a completion of
the protect.
2. Conduits must be a minimum 5 feel from City utilities unless
otherwise approved by the Public Works Department.
3. Any sidewalk removal must be re Dlaced in full Danels. In addilion.
any existing city i mpr ova ment sl facil iti a s damaged during
construction shall be replacedlrepaired at the per mite e's expense
Sidewalk shall be restored within one week of removal/installation
of facilities.
4. One sack of slurry backfitl shall be used to backfill all trenches,
around all vaults. all manholes. and al potholes or bore pits.
5. Roadway conduit son strUctlon shall conform to the Clty's
STD-101-L (a"Ic had). ' Trench Res ur facing', ' Road way
Utility Trench Detail' (Parkway Utility Trench Detail',
'Ro ad wayUlili ty Pole and Bore Detail', antl with the following
medifled and supplemented rso utremenls:
A. New tend ul is In the roatlway shall be Insta lled
adjacent to the existing edge of gutter or curb as close
as possible.
B. New co ntl Ulls through Ile intersection roadway
shall be jatkedi bored and
require a minimum of 1 sack
slurry backf IN for the access holes.
C. All roadway construction shall require 'Temporary
S tr as tl A l leyl Sidewalk closure Permit' and Traffic Control
plans approved by the Traffic En in asr.
6. A construction schedule must be submitted and approved five (5)
working days prior to start of work.
7. All underground facilities Constructed shall be part of the
'Underground Service Alert'.
S. All facilities shall ..at the Uniform Building Code (UBC) and have
Underwriters, Laboratories Inc (UL) Certification Standards or
equal those standards as verified by the Building Department.
P. Additional surfacing re Re tram. It. may be spec tied by the Public
Works Dap a rime IT when trenching work occurs wlilin pavements
less than five years old.
CITY OF NEWPORT BEACH
UNDERGROUND CONSTRUCTION
REQUIREMENTS
DRAWING NO. STD-105-L-AI
SITE ID # 635968
TIME WARNER CABLE
(GARDEN GROVE OFFICE)
INSTALLATION OF FIBER OPTIC CONDUIT
466 FLAGSHIP
MISSILE BORE DETAIL
ANN SIGHT
BORE PIT PIERCING TOOL
LAUNCH CRADLE
—Ir,—
xv
POLYMER CONCRETE COVER
35 M- —
1
24 V•
PUN VIEW
.4,
l
I 1 u
SUE NEW END VIEW
MODEL NO. A6001974TAPCX24
24•X36•X24' G E
IJRMORC%S�-
POLYMER CONCRETE BOX & COVER ASSEMBLY N.T.S.
SCALE: 1" = 30'
20' 3050'
i -
N
,
coy
a� F
sy�
JOB SITE-----'
TG 888-H5 VICINITY MAP
f
O�
i
o-
ry*� �a 13'BORE
F" BP P
PUCE 273' TIME WARNER FIBER
PH`, 'VAULT N SIDEWALK. STA 10Q -7 BCE
3f 5BBORE
LOCATE& INTERCEPT 8W. CAN CONDUIT'
INAS11ILTSTAI.-11'1C1
3
Rh-
F
-6
c r�i
c ;
GENERAL NOTES
INDEMNIFICATION CLAUSE: THE CONTRACTOR AGREES AND SHALL;
1. ASSUME SOLE AND COMPLETE RESPONSIBILITY OF THE JOB SITE CONDITIONS DURING THE
COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING THE SAFETY OF ALL PERSONS
AND PROPERTFS THAT THESE REQUIREMENTS SMALL APPLY CONTINUOUSLY AND NOT BE
LIMITED TO NORMAL WORKING HOURS AND CONDITION. THE CONTRACTOR FURTHER AGREES
TO DEFEND, INDEMNIFY AND HOLD PERMUEE, REPRESENTATIVES, AND ENGINEERS
HARMLESS FROM ANY AND ALL LIABILITY. REAL OR ALLEGED IN CONNECTION WITH THE
PERFORMANCE OF THE WORK ON THIS PROJECT.
2. PRIOR TO THE BEGINNING OF ANY CONSTRUCTION AND THROUGHOUT THE COURSE OF
CONSTRUCTION WORK THE CONTRACTOR SHALL FULLY COMPLY WITH THE
'CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH' ACT OF 1973 INCLUDING ALL REVISIONS
AND AMENDMENTS THERETO.
3. ALL WORK SHALL CONFORM TO THE LATEST EDITION OF 0095,128, AND THE STANDARD
'SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION', AS ADOPTED BY THE CITY. COUNTY
OR STATE AS MODIFIED BY STANDARD PUNS AND ADDENDUMS.
4. THE EXISTENCE AND LOCATION OF UTILITIES AND OTHER AGENCY FACILITIES AS SHOWN
HEREON ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. OTHER FACILITIES MAY EXIST,
THE CONTRACTOR SHALL VERIFY PRIM TO THE START OF CONSTRUCTION AND SHALL USE
EXTREME CARE AND PROTECTIVE MEASURES TO PREVENT DAMAGE TO THESE FACILITIES.
THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL VTIUTY OR AGENCY
FACILITIES WITHIN THE UMTTS OR WORK, WHETHER THEY ARE SHOWN ON THIS PLAN OR NOT.
5. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT A 811, AT LEAST
TWO WORKING DAYS PRIOR TO THE START OF ANY EXCAVATION
6. THE CONTRACTOR SHALL NOTIFY THE INSPECTION DEPARTMENT. (949) B"MI1. AT LEAST
TWO DAYS BEFORE START OF ANY WORK REQUIRING THEIR INVOLVEMENT.
7. ALL WORK AREA AND STREET TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE
SPECIFICATIONS OF THE MUTCD AND SPECIFICATIONS FROM THE CITY. COUNTY AND STATE.
8. THE CRY, COUNTY OR STATE SHALL SPECIFY THE EXPRATION PERIOD OF THE PERMIT FOR
THIS CONSTRUCTION PROJECT.
9. THE MINMIM COVER FOR ALL CONDUITS PLACED UNDERGROUND SHALL BE N ACCORDANCE
WITH CITY, COUNTY OR STATE REQUIREMENTS.
10, THE CONTRACTOR SHALL PUNCH THROUGH & BORE ALL CURB AND GUTTERS AND BORE AL
CONCRETE DRIVEWAYS AND WALKWAYS AT THE DIRECTION OF THE CITY, COUNTY OR STATE
INSPECTION.
11. ALL ASPHALT CONCRETE ANDDR CONCRETE PAVEMENT SHALL BE REPLACED AT THE
DIRECTION OF THE CITY, COUNTY OR STATE ENGINEERS.
12 ALL SHRUBS, PUNTS OR TREES THAT HAVE BEEN DAMAGED OR DISTURBED DIMING THE
COURSE OF THE WORK, SHALL BE REPLANTED AND OR REPLACED SO AS TO RESTORE THE
WORK SITE TO ITS ORIGINAL CONDITION. EXISTING STREET TREES SHALL BE PROTECTED IN
PLACE.
13. IF DAMAGE OCCURS TO THE CITY OR COUNTY FACILITIES, THE CONTRACTOR SHALL
MMEDATELY NOTIFY: NEWPORT BEACH 8 (9491644-3311 CITY OWNED STREET LIGHTING.
14. AT LEAST TWO DAYS PRIOR TO THE COMMENCEMENT OF ANY WORK, THE CONTRACTOR SHALL
NOTIFY THE POLICE DEPARTMENT AND THE FIRE DEPARTMENT.
15. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE PROCESSING OF ALL APPLICATION
PERMIT FORMS ALONG WITH THE REOURED LABILITY INSURANCE FORMS CLEARLY
DEMONSTRATING THAT NEWPORT BEACH IS ALSO INSURED WITH
THE REQUIRED LIABILITY INSURANCE FOR THIS CONSTRUCTION PROJECT.
16. VAULTS. PEDESTALS, CONDUITS AND ALL OTHER TYPES OF SUBSTRUCTURE ARE EITHER
SPECIFIED ON THIS RAN OR WILL BE SPECIFIED BY THE CONSTRUCTION ENGINEER. ANY AND
ALL DEVIATIONS FRCM THE SPECIFIED TYPES OF MATERIAL MUST BE APPROVED BY THE
SYSTEM ENGINEER OR CONSTRUCTION ENGINEER, IN WRITING BEFORE INSTALLATION
THEREOF,
SITE ID # 635968
6- 7- 8 9" ,o 3" 4 5 G B' 9
P ROPOSEE:) WORK _ - EXISTING STRUCTURES MISC-
Q
SVMBOIJLINETYPE ABBRV.
DESCRIPTION
SYMBOLAINETYPE
ABBRV.
DESCRIPTION
SYMBOULINETYPE
DESCRIPTION
SYMBOLAJNETYPE
ABBRV.
DESCRIPTON
ABBRV
DESCRIPTION
EXCAVATION PLAN
CONCRCEMENT
'%
J
POLE
UTILITY POLE
SEC
STREET LIGHT CONDUIT
D CURB
Z
--- �
ASPHALT
ASPHALT RESURFACE
MH
MANHOLE
E
ELECTRIC
RAN _
RIGHT OF
FACE
FROM CURB FACE
F`
N R Ev I IO N S :
.m •.
— — — —
PROPOSED TRENCH
PROPOSED BORE
RR
HH
HAND
T
TELEPHONE
rO
EDGE AVE
FCF
CO
CONCRETE
DESIGNED BY.-----
{ _
w/AV TIME WARNER CABLE
. _-.• DATE
AT
I
DES.' RIVTIJN
IN'
-- - —
g FED PEDESTAL G GAS _ FOC — FOC FRONT OF CURRENT
W
290CORPORATE TERRACE CIRCLE\
n
I La BP
HDO SETBACK
BORE PIT DIRT I ASPHALT
C"
..
FIH
VLV
FIRE HYDRANT
VALVE
— SO
— SS ---
STORM DRAIN
SANITARY SEWER
rCURB FACE
C8G r
G&G
CURB B GUTTER
UAG
UNDERGROUND
.' STE. 200, C...HA, CA 92879J
_-
- - __
�`/
PACIFIC WEST LLC
_
�IGALERT
v - PH POTHOLE ASPHALT �— TS TRAFFIC SIGNAL W WATER GUTTER LIP SN✓ SIDEWALK
DN✓ DRIVEWAY
.{
1 W W W • K B E N G .NET
r
r 90i 4F75ff/B01-NWB
CfI'Y Qip
W
EU
EXPOSE UTILITY
n
SL
STREET LIGHT
— TV --
LAN
"`YTS
RJR
RAILROAD
_
CALL TOLL FREE
N6'NTORT ■EACH Off i1.A163BR
J
® VT
PROPOSED IFDERGR0lll0 fNCL0.9N7E (SEE OETALI
VENT
TO,
TRAFFIC CONDUIT -
_---
CONDUIT
-
CONDUIT COUNTS
---_--_-
n..�
-
CpIWRS�
= TEL. 951-BOB-9501
NDERGRS ND.SER YOU DIG
UNDERGROUND SERVICE ALERT
_
PL PLACE(INSTALLNEW) W MTR METER � PARKING METER
COUNT— I ax A R&R CONIC. FUG R&R - REMOVE & REPLACE TREE STREET SIGN DATA BLOCK DISTANCE
EHQINEER/NO FA— 951-908-951a
PHONE NO. &1-T
142.014 - 03i5'
61/16/2018 City of Newport Beach Page 1 of 16
6:34:19AM INSP150 - Daily Inspection Request Report
Requested Inspection Date : 07/16/2018
Inspection T-*'pe : ENCROACH
Inspection Area: PW
Site Address : 466 FLAGSHIP RD
A/P/D Information:
Activity : N2018-0355
SubType : NEW
Status : APPROVED
OWNER: SMV NEWPORT BEACH LP Phone: 0
APPLICANT: CHARTER COMMUNICATIONS Phone : 714-709-3390
Description : Install 63 LF of 2-inch duct and a 2'x3' fiber vault on Flagship Road at alley. Concrete and
alley restoration per City Standards.
Requested Inspection(s)
Item: 10060 PIPE INSTALLATION - UTIL
Requested Time: 7/16/2018 12:00:OOAM Requestor: NBIVR
Entered By: NBIVR
Comments: AM
Assigned to :
LOGGED
7149366410