FIRE SPREiR ER NFPA 13D SYSTEM
ROUGH INSPECTION CHECKL LS'T
1. Riser Construction and Location prpvat
a- Dra n valve
b- BacVbw device (single check)
c. Beg activation device
d. Inspector's test valve
e. Riser sad per approved plans
2. Pressure Test
a. System tested at operating Pressure for 2 hours
b. Pressure gauge installed
3- �rinkter Heads shall not be installed n the frtdnas onor to the fittings
being cemented in Place Remoorary test plugs)
a- Instattatton and spacing of temporary test plugs
4. Piping
a. Material installed per plan
b- Hangers Per codes/prevent upward movement
c. All CPVC piping shalt be installed by persons who have been
certified by the manufactiAw for instattation of CPVC piping
d. Piping protected from damage
5- Bell
a- Wiring instaled per code
b. Boxes installed at proper locations
u
u
In
►,
NOTE CPVC plastic Pipe In the garage shalt not he Amos_ed. Sprinkle,; that are listed as
Response' or °ResidentiaP must be used.
i
FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED:
M
DATE " —II-
lue
F'm \F2 SpPo M' NFPA UD Slg _ RaUgh i.pe .. Chetl:la( OS/1 M,
wroCITY OF NEWPORT BEACH
4 a C❑j-*nIU1`11TY DEVELOPMEN3' DEEAR`IRIEINT
m BUILDING DIVISION
100 Civic Center Drive j P.O. Box 1788 1 Newport Beach, CA 92658-8915
www.newportheachca_gov l (949) 644-3200
FIRE SppjNK ER NFPA 13D SYSTEM
FINAL CHECIaIST
(RESIDENTIAL)
1. Water meter proper size
2 Fire sprinkler system installed per the approved plans
3_ A8 construction covers removed from sprinkler heads
4. Cover plates are NOT to be installed, but shall be available on the jobsite
5. All tape and paint removed from sprinkler heads
6. Frish trim installed around sprinkler heads
7. Proper signage posted at all required locations
8_ Row test conducted and bell tested
9. Location of inspectors testing vane in approved location
SYSTEMS:
10. Clearances around sprinkler heads and riser - no obstructions
11. Operallng Pressure gauge installed at riser showing proper water pressure
12. Back flow preventer installed
13. System Installed per manufacturers specifications
Y€S
ld
7M
FIRE SPRINKLER NFPA 13D SYSTEM FINAL APPROVED: :7 jlA