FIRE SPRINKLER N"A 13D SYSTEM
ROUGH INSPECTION CHECKLIST
1. R ser Construciion and Lpcation Apornyal YES
a. Drain valve ✓�1�
b. B&*fbw device (single check)
c. Bell activation device
d- Inspector's test valve
e. Rfser sized per approved plans
2• Pmssure Test
a_ System tested at operating pressure for 2 hours
b. Pressure gauge installed
3- Sprinkler Heads shad not be nstalled m tine Winos Prior tg the fkhngs betFlg cernented m Place (tem rary test plugs)
a- Installation and spacing of temporary test plugs
4. Piping
a- Material installed per plan
b- Hangers per codes/prevent upward movement
c- Al CPVC piping shag be Installed by persons who have been jyy�
certified by the manufacturer for installaffon of CPVC Piping
d. Piping Protected from damage
5- Betl
a. Wiling installed per rode
b. Boxes installed at proper locations
NOTE CPVC plastic pipe in the garage shalt not ha A ro. . gp �n�� that a e listed as `G
Response' or'ResidenW must be used.
CORRECTIONS AND NOTES_
FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED;
BY: PERMIT#:_ F 2,12 ZZ
DATE_ 25'— 1 16 - 2L
►e
i
Farms\Fire Sprinkler NF:A 13p System -Rough 4.specean Checlda[ p5/12/2p15
wpoCITY OF NEWPORT BEACH
�Q
COM3RTNM DEVELOPMENT DEPARTNMNT BURDING DIVISION
U
l�
C•�GO`U4�1! 15
1pp Civic Center Drive I P.O. Box 1768 1 Newport�6e4a3h2po A 92658-89
www.newpo.theachmgov 1 ( )
FIRE SpRINIC FR NFPA 13D SYSTEM
FINAL CHECKLIST
(RESIDENTIAL)
YES
NO
C�1
❑
1, Water meter proper size
❑
2. Fire sprinkler system installed per the approved plans
/
3. M construction covers removed from sprinkler heads
4. Cover plates are NOT to be installed, but shall be available on the jobsite
LJ
❑
5. All tape and paint removed from sprinkler heads
❑
El5.
Finish into installed around sprinkler heads
❑
7. Proper signage posted at all required locabons
❑
8. Flow test conducted and bell tested
/
9. Location of inspector's testing valve in approved location
u�(
❑
SYSTEMS:
10. Clearances around sprinkler heads and riser - no obstructions ❑
11. Operating pressure gauge Installed at riser showing proper water pressure ❑
12. Back flow preventer installed ❑
13. System installed per manufacturers specifications ❑
FIRE SPRINGER NFPA 13a SYSTEM FINAL APPROVED: H -? _ _p -a /- I
PERMIT #
DATE: 1- to - Z'�>
BY: , G M
Forms\ Rra 5,1.kler NFPA 1D System -RNAL Checkl' RHOS IAL 05/12/2915
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
3300 Newport Boulevard I P.O. Box 1768 1 Newport Beach, CA 92658
www.newportbeachca.00v 1 (949) 644-3200
Structural Observation Report
Project Address:1615 LINCOLN LANE.
Report date: 8-23-2022
CNB Inspector Name:
CNB Permit #:
NEWPORT BEACH, CA
Building Owner Name:
Owner's Mailing address (if different from site);
Owners Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO email Address:
SO Telephone #:
SO License / Reg. #:
EYASS KHANSA
INFO@NEWLEAFENGINEERINGLA.COM
562-217-1790
C91758
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS ORSFRVFn frlhark nnnrirnhla hrsvaal
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
❑
Conventional
Footings & Slab
❑ Concrete
❑ Steel
❑ Concrete
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
❑
Caissons, Piles,
Grade Beams
❑ Wood or Manuf.
Shear Panels
❑ Masonry
�(
u
Wood
❑
Other:
Other: wood
❑ Other:
X Other: RIDGES,
AFTERS, JOISTS, BEAMS, HE
DERS, POSTS
E
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑
OBSERVED DEFICIENCIES AND COMMENTS:
❑ REPORT CONTINUED ON ATTACHED PAGES.
X FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division. -—
B-23-2022
STAMP OF STRUCTURAL OBSERVER
STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
Fortes\Svoau Observatian epos ,insuactions
STRUCTURAL OBSERVATION REPORT INSTRUCTIONS
When structural observation is required for a project, the structural observer shall perform site visits at
significant construction stages throughout the progress of the work. Site visit frequency shall allow for
correction of observed deficiencies without substantial effort or uncovering of the completed work.
Structural observation site visits shall be performed for each construction stage identified on the
approved construction documents.
The structural observer may utilize the City of Newport Beach "Structural Observation Report" form, or a
similarly formatted report, to record the required observation visits. If the City's form is not used the
alternate report shall be on the structural observer's letterhead, state the site address, plan check and
permit numbers, stages and elements observed, date observed, and complete contact information for the
structural observer. All structural observation reports, regardless of form used, shall include the license
stamp and wet signature of the structural observer responsible for the project.
OBSERVED DEFICIENCIES
When a deficiency is noted, the structural observer shall give copies of the completed structural
observation report to the owner or owner's representative, project contractor, and the Chief Building
Official or designee.
The contractor shall resolve all deficiencies prior to final inspection or acceptance of the structural work
by the Chief Building Official, or designee.
FINAL STRUCTURAL OBSERVATION REPORT
The structural observer shall submit a final structural observation report to the Chief Building Official, or
designee, upon completion of the structural system. The final structural observation report shall state
that the structural system conforms to the approved construction documents and that all previously
observed deficiencies have been corrected. Final inspection or other acceptance of the structural system
by the Chief Building Official, or designee, will not occur until the final structural observation report is
received.