Loading...
HomeMy WebLinkAboutF2022-0361 - Misc (2)CITY OF NE`VPORT BEACH CONENFUNfry DEVELOPMENT DEPARTMENT 100 Civic Center Drive ILDING D VLSION 92658 8915 www.newportbeachea•gov I (949) 644-3200 FIRE SPRINKLER N"A 13D SYSTEM ROUGH INSPECTION CHECKLIST 1. R ser Construciion and Lpcation Apornyal YES a. Drain valve ✓�1� b. B&*fbw device (single check) c. Bell activation device d- Inspector's test valve e. Rfser sized per approved plans 2• Pmssure Test a_ System tested at operating pressure for 2 hours b. Pressure gauge installed 3- Sprinkler Heads shad not be nstalled m tine Winos Prior tg the fkhngs betFlg cernented m Place (tem rary test plugs) a- Installation and spacing of temporary test plugs 4. Piping a- Material installed per plan b- Hangers per codes/prevent upward movement c- Al CPVC piping shag be Installed by persons who have been jyy� certified by the manufacturer for installaffon of CPVC Piping d. Piping Protected from damage 5- Betl a. Wiling installed per rode b. Boxes installed at proper locations NOTE CPVC plastic pipe in the garage shalt not ha A ro. . gp �n�� that a e listed as `G Response' or'ResidenW must be used. CORRECTIONS AND NOTES_ FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED; BY: PERMIT#:_ F 2,12 ZZ DATE_ 25'— 1 16 - 2L ►e i Farms\Fire Sprinkler NF:A 13p System -Rough 4.specean Checlda[ p5/12/2p15 wpoCITY OF NEWPORT BEACH �Q COM3RTNM DEVELOPMENT DEPARTNMNT BURDING DIVISION U l� C•�GO`U4�1! 15 1pp Civic Center Drive I P.O. Box 1768 1 Newport�6e4a3h2po A 92658-89 www.newpo.theachmgov 1 ( ) FIRE SpRINIC FR NFPA 13D SYSTEM FINAL CHECKLIST (RESIDENTIAL) YES NO C�1 ❑ 1, Water meter proper size ❑ 2. Fire sprinkler system installed per the approved plans / 3. M construction covers removed from sprinkler heads 4. Cover plates are NOT to be installed, but shall be available on the jobsite LJ ❑ 5. All tape and paint removed from sprinkler heads ❑ El5. Finish into installed around sprinkler heads ❑ 7. Proper signage posted at all required locabons ❑ 8. Flow test conducted and bell tested / 9. Location of inspector's testing valve in approved location u�( ❑ SYSTEMS: 10. Clearances around sprinkler heads and riser - no obstructions ❑ 11. Operating pressure gauge Installed at riser showing proper water pressure ❑ 12. Back flow preventer installed ❑ 13. System installed per manufacturers specifications ❑ FIRE SPRINGER NFPA 13a SYSTEM FINAL APPROVED: H -? _ _p -a /- I PERMIT # DATE: 1- to - Z'�> BY: , G M Forms\ Rra 5,1.kler NFPA 1D System -RNAL Checkl' RHOS IAL 05/12/2915 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 3300 Newport Boulevard I P.O. Box 1768 1 Newport Beach, CA 92658 www.newportbeachca.00v 1 (949) 644-3200 Structural Observation Report Project Address:1615 LINCOLN LANE. Report date: 8-23-2022 CNB Inspector Name: CNB Permit #: NEWPORT BEACH, CA Building Owner Name: Owner's Mailing address (if different from site); Owners Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO email Address: SO Telephone #: SO License / Reg. #: EYASS KHANSA INFO@NEWLEAFENGINEERINGLA.COM 562-217-1790 C91758 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS ORSFRVFn frlhark nnnrirnhla hrsvaal FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels ❑ Masonry �( u Wood ❑ Other: Other: wood ❑ Other: X Other: RIDGES, AFTERS, JOISTS, BEAMS, HE DERS, POSTS E ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: ❑ REPORT CONTINUED ON ATTACHED PAGES. X FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. -— B-23-2022 STAMP OF STRUCTURAL OBSERVER STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Fortes\Svoau Observatian epos ,insuactions STRUCTURAL OBSERVATION REPORT INSTRUCTIONS When structural observation is required for a project, the structural observer shall perform site visits at significant construction stages throughout the progress of the work. Site visit frequency shall allow for correction of observed deficiencies without substantial effort or uncovering of the completed work. Structural observation site visits shall be performed for each construction stage identified on the approved construction documents. The structural observer may utilize the City of Newport Beach "Structural Observation Report" form, or a similarly formatted report, to record the required observation visits. If the City's form is not used the alternate report shall be on the structural observer's letterhead, state the site address, plan check and permit numbers, stages and elements observed, date observed, and complete contact information for the structural observer. All structural observation reports, regardless of form used, shall include the license stamp and wet signature of the structural observer responsible for the project. OBSERVED DEFICIENCIES When a deficiency is noted, the structural observer shall give copies of the completed structural observation report to the owner or owner's representative, project contractor, and the Chief Building Official or designee. The contractor shall resolve all deficiencies prior to final inspection or acceptance of the structural work by the Chief Building Official, or designee. FINAL STRUCTURAL OBSERVATION REPORT The structural observer shall submit a final structural observation report to the Chief Building Official, or designee, upon completion of the structural system. The final structural observation report shall state that the structural system conforms to the approved construction documents and that all previously observed deficiencies have been corrected. Final inspection or other acceptance of the structural system by the Chief Building Official, or designee, will not occur until the final structural observation report is received.