PROCEDURE
Upon completion of work, Inspection and tests shall be made by the contractor's representative and witnessed by an owner's
representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the job,
A certificate shall be filled out and signed by both representatives. Coples shall be prepared for approving authorities, owners, and
contractor. It Is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor
workmanship, or failure to comply with approving authority's requirements or local ordinances.
Property name G `JC/`N7e— � -4.r— . /�. i. ��
Property address � .11iilee,
Accepted by approving authorities (names)
Ni ow Oo
Address
Plans
--
installation conforms to accepted plans Yes No
Equipment used Is approved Yas 0 No
If no, state deviations
Has person In charge of fire equipment been instructed as to location of Yes No
control valves and care and maintenance of this new equipment?
If no, explain
Instructions
Have copies of appropriate instructions and care and maintenance I`7 Yes I_._. I No
charts been left an premises?
If no, explain
Location
Supplies buildings
Pipe types and class J, GKane wN
Type joint
Pipe conforms to standard 0 Yes No
Underground
Fittings conform to standard 0 Yes No
pipes and joints
If no, explain
Joints needed anchorage clamped, strapped, or blocked in D Yes ❑ No
accordance with standard
If no, explain
Flushing: Flow the required rate until water is clear as Indicated by no collection of foreign material In burlap bags at
outlets such as hydrants and blow -offs. Flush at flows not less than 390 gpm (1476 Umin) for 4-in. pipe, 880 gpm (3331
Umin) for 6-In. pipe, 1560 gpm (5905 Umin) for 8-in. pipe, 2440 gpm (9235 Umin) for 10•in. pipe, and 3520 gpm (13,323
Umin) for 12-in. pipe. When supply cannot produce stipulated flow rates, obtain maximum available.
Hydrostatic., Hydrostatic tests shall be made at not less than 200 psi (13.8 bar) for 2 hours or 50 psi (3.4 bar) above
Test
static pressure in excess of 150 psi (10.3 bar) for 2 hours.
description
Leakage: New pipe laid with rubber gasketed joints shall, if the workmanship is satisfactory, have little or no leakage at
the joints. The amount of leakage at the joints shall not exceed 2 quarts per hour (1.89 Uhr) per 100 joints iffespective
of pipe diameter. The leakage shall be distributed ever all joints. If such leakage occurs at a few joints, the installation
shall be considered unsatisfactory and necessary repairs made. The amount of allowable leakage specified above can
be Increased by 1 fluid ounce per inch valve diameter per hr. (30 mU25 mmlhr) for each metal seated valve isolating the
test section. If dry barrel hydrants are tested with the main valve open so the hydrants are under pressure, an additional
5 ounces per minute (150 mUmin) leakage is permitted for each hydrant.
New u e ro nd piping flushed according to es No
standard by (company)
It no, explain
How Bushing flow was obtained
Through what type opening
Flushing
tests
C Public water Tank or reservoir Fire pump
Hydrant butt Open pipe
Lead-ins Bushed according to standard by (company) Yes No
If no, explain
How flushing flow was obtained
Through what type opening
F Public water El Tank or reservoir Fire pump
Y connection to flange 0 Open pipe
and spigot
Reprinted whh permisalon from NFPA 13, Installation of Sprinkler Systems, Copyright ® 2002, National fire Protection Association, Quincy, MA a2269. This reprinted material
Is not the complete and official postion of the National Fire Protection Association, on the reverenced subject which Is represented only by the standard in its entirety.
American Fire Sprinkler Association
9696 Skillman Street, Suite300, Dallas, Texas75243 AFSA Form #AF064
Hydrostatic
All new underground piping hydrostatically tested at
Joints covered
test
psi for hours
Yes , No
Total amount of leakage measured
Leakage
gallons hours
test
Allowable leakage
gallons — hours
Number installed
Type and make
All operate satisfactorily
Hydrants
0 Yes Q No
Water control valves left wide open
Nees .0 No
Control
If no, state reason
valves
Hose threads of fire department connections and hydrants interchangeable with
AAAyyy Yes 0 No
those of fire department answering alarm
Date left in service
Remarks
Name of Installing contractor A /OX
Signatures
Testswitnessed by
For property owner (signed) Title
Date
For Installing contractor (si ne Tittle
Date 7
Additional explanation and notes