Loading...
HomeMy WebLinkAbout05 - American Legion Bulkhead Wall Repair - NOC of Contract No. 7659-1 (16H11)Q SEW Pp�T CITY OF z NEWPORT BEACH c�<,FORN'P City Council Staff Report September 12, 2023 Agenda Item No. 5 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Chris Miller, Administrative Manager, cmiller@newportbeachca.gov PHONE: 949-644-3043 TITLE: American Legion Bulkhead Wall Repair — Notice of Completion of Contract No. 7659-1 (16H11) FA 739-7±Tl*a On May 24, 2022, the City Council awarded Contract No. 7659-1, American Legion Bulkhead Wall Repair, to Applied Restoration, Inc. of El Cajon, California. The project consisted of installing a new external steel wale beam along the length of the existing bulkhead, new tie rods and repairing the bulkhead cap to provide needed structural stability and to increase its useful life. The work is now complete and staff requests City Council acceptance and closeout of the contract. RECOMMENDATIONS: a) Accept the completed work and authorize the City Clerk to file a project Notice of Completion; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after acceptance by the City Council. DISCUSSION: Overall Contract Cost/Time Summary Award Contract Final Cost at Total Contract Percent Contract Amount Completion Change Amount Cost Change $ 991,600.00 $ 1,140,729.28 +$ 149,129.28 +15.0% Allowed Contract Time (days) 182 Actual Time 0 Under (-) or Over (+) The work necessary for the completion of this contract consisted of repairing minor concrete spalling along the existing bulkhead cap, installing a steel wale beam along the exterior of the bulkhead, installing tiebacks through the steel wale beam into the soil, and adjusting the interior marina headwalk to accommodate the protrusion of the new steel wale beam along the exterior of the wall. 5-1 American Legion Bulkhead Wall Repair — Notice of Completion of Contract No. 7659-1 (16H11) September 12, 2023 Page 2 The contract has been completed to the satisfaction of the Public Works Department. A summary of the construction cost is as follows: Original Bid Amount: $ 991,600.00 Actual Cost of Bid Items Constructed: $ 991,600.00 Total Change Orders: $ 149,129.28 Final Contract Cost: $ 1,140,729.28 The project incurred eight change orders. An additional tieback was added to reduce the span between two tiebacks near the outdoor patio area. Unforeseen obstructions were encountered when installing tiebacks 40-feet underground. This resulted in additional core drilling as well as extensive parking lot saw -cutting and excavation to facilitate obstruction removal. The material encountered while installing the tiebacks presented additional challenges. Also, the installation angles of two tiebacks were adjusted during construction resulting in the refabrication of a wale beam component. Lastly, the as-builts were deducted from the bid item because this task was completed by the City of Newport Beach's engineering consultant. A summary of the project schedule is as follows: Estimate Start of Construction per Annual Baseline Schedule September 12, 2022 Actual Start of Construction per Notice to Proceed September 26, 2022 Extended Contract Completion Date Inclusive of Extra Work June 27, 2023 Actual Substantial Construction Completion Date June 30, 2023 FISCAL IMPACT: The American Legion Bulkhead Wall Repair Project was included in the FY 2021-22 Capital Improvement Program Budget. Tidelands funds were used for the construction of the project. Funds for the construction contract were expended from the following budget account. Account Description Tidelands ENVIRONMENTAL REVIEW: Account Number 10101-980000-16H 11 Total: Amount $ 1,140,729.28 $ 1,140,729.28 On May 24, 2022, the City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301, Class 1 (Existing Facilities — maintenance of existing public facilities involving negligible or no expansion of use) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it had no potential to have a significant effect on the environment. 5-2 American Legion Bulkhead Wall Repair — Notice of Completion of Contract No. 7659-1 (161-111) September 12, 2023 Page 3 NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 5-3 ATTACHMENT A 17TI -)TH S CITY OF COSTA MESA PROJECT LOCATION JOHN WAYNE AIRPORT VICINITY MAP NOT TO SCALE AMERICAN LEGION BULKHEAD WALL REPAIRS LOCATION MAP - O� CITY OF IRVINE P� UNIVERSITY FLEW, CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT C-7659-1 1 05/24/22 5-4