CHANGE ORDER# 2 DATE: September 1, 2011
This Change Order decreases the amount of dredging immediately adjacent to the ETCO property, located on the
western side of the Rhine Channel between roughly Stations 14+50 and 18+30, as shown on the attached Revision 3 to
Sheets 4 and 5 of the Contract Plans.
The reason for decreasing the amount of dredging at this location is that the management of the ETCO property has not
yet undertaken their planned dock and pile reconstruction efforts. The City of Newport Beach's original expectation was
that piles and docks would be demolished and replaced by the property's management prior to or near to the time of the
Rhine Channel dredging project. This effort has not yet occurred. The existing piles and docks appear to be in a state of
significant disrepair and are not considered suitably stable to withstand the originally planned dredging.
This change decreases the payable quantity for Bid Item No. 2, "Dredging, Transport, and Disposal,' by 1,900 cy,
changing the total quantity from 91,300 to 89,400 cy.
ITEM QUANTITY UNIT PRICE
CHANGE
Reduced Q}Iantity of Dredging (cy) -1,900 $ 16.95 $
TOTAL $
AMOUNT OF ORIGINAL CONTRACT (Base Bid and Contingency Bid Items):
Previous Change Orders, cumulative
Revised Contract Amount
This Change Order
NEW CONTRACT AMOUNT
Addition of days of contract time for this Change Order:._-=0 __ Calendar Days
Completion Date remains unchanged: December 31, 2011
INCREASE$ DECREASE$
-$ (32,205.00)
-$ (32,205.00)
$ 3,369,555.00
$ (42,000.00)
$ 3,327,555.00
$ (32,205.00)
$ 3,295,350.00
This document shall become a supplement to the Contract between Dutra Dredging Co. and the City of Newport Beach,
dated ,. 'I•//. All provisions of the Contract shall apply thereto.
Accepted by Date "f. 9 • II
Recommended by
Con~
Date 9---9-it
ect ngineer
Approved by
(1/};✓f'
Date Cj-1-11
City of Newport Beach
so· 49
16,tOO 163 17+00
DREDGEJTO ·1S' MLLW
18.00 1..00
PROJECT BASELINE
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
20+00 21+00
DREDGE T0-14' MUW
22+00 23+00
~die,,,of_0~11'CDI.IWIG
ModiluOonofOnid~_btl!nll.·EfGOfroparty
19
(IIU.WNIY·JO._ ___ _
""-::=:-~~-----
OJ,l'f:!B!ZJ,c"="~--
r•--·-
1
I I
-1
.~ i
. l ' !
I __
• 8 I ~KEYCJJ
CONTR.Ol COORDINATE TA8lE
25,00
NO. I M:>~IHING[Ffl IWTIHG(f'T)
60$1730.S,
Kl511t.JJ,J5(
&os1'16u,11so
21ffm.2e l11usuoo.,s1 1$Z
2169C:r.561 50S12•us
-.,~-.o~ ~
~., .. vi> ... 0
RHINE CHANNEL
CONTAMINATID SEDIMENT CLEANUP
DREDGE PLAN
(RHINE CHANNEL-STATIONS 16+oo TO 2S+oo)
kil7'1.Q7
60Sl1'n.6C
60Stm.n
50517.,.~
~111 -J~
~ ~~
~Ii ◄•
SIIE£TNO. 5 Of' 15