Loading...
HomeMy WebLinkAboutGB070010_Correction ListCounty of Orange OC Public Works Building Permits Division Main Office 300 N. Flower Street Santa Ana, CA 92702-4048 GB070010 Plan Check Corrections Corrections shall be made on the tracings and three(3) new sets of plans shall be submitted. If you make changes to the plan other than or in addition to what Plan Check has requested, yellow highlight the changes on one set of the re-submitted plans. Return the original check print with corrected plans. Payment of a new plan check deposit may be required for all plans on which no action is taken by the applicant for a period of 180 days. Applications for which no permit is issued within 180 days following the date of submittal shall expire by limitation, and shall be discarded. Project Number:GB070010 Submittal Date:Oct 12, 2010 CBC Edition: 2000 Plan Check Date: 10/25/2010 4:05 PM Description:precise grading for two sfd Job Address 15 AVALON VISTA NEWPORT COAST, CA Owner Address TUSHAR PATEL FAMILY TRUST 33 CANYON TERRANCE NEWPORT COAST CA92657 1st Plan Check 2/6/07 1st Recheck 7/10/07 2nd Recheck 8/22/07 1st Revision 6/5/08 1st Recheck 6/18/08 Current - 2nd Revision 10/25/10 Plan Checked By Michael Fisher Michael.Fisher@ocpw.ocgov.com (714) 667-8868 (714) 667-8885 FAX Contact Address Krishna B Bhakta 30 Hughes STE 202 Irvine CA92618 949-206-0509 x203 krishna@nathudevelopment.com Page 1 of 4 GB070010 GENERAL INFORMATION Please provide 24-hour notice to your plan checker, prior to obtaining the grading Permit.Return the original check print with corrected plans. Payment of a new plan check deposit may be required for all plans on which the applicant takes no action for a period of 180 days. Applications for which no permit is issued within 180 days following date of submittal shall expire by limitation, and shall be discarded. SUBMITTALS, FEES, BOND, INSURANCE AND ISSUANCE Provide three (3) complete sets of corrected plans. Provide minimum 40-scale plan for precise grading. The maximum size shall be 36" x 42". All sheets shall be uniform size. Plans will not be rechecked at the counter. Allow one week for recheck. Plan check and inspection deposit amounts will be calculated by the plan checker based on earthwork quantities or drainage improvements, whichever is greater. The engineer shall provide this information. Surety is required in the amount of $ _________. Surety may be posted in one of the following forms: Bond Certificate of Deposit Letter of Credit Cash or Cashier s Check Personal/Company checks cannot be accepted. County approved forms for the various types of surety are available upon request at the Grading Counter, Station 4, Room 122. Please note all signatures must be notarized. Provide verification of contractor's coverage for Workman's Compensation insurance. If owner is doing work and will not employ other workers, owner must sign exemption statement. Owner or authorized agent and/or contractor must sign the permit at the time of issuance. Authorized agent must have a notarized statement from the owner authorizing the agent to act on behalf of the owner. The permittee and the entity providing the surety must be the same i.e., owner, developer or contractor. Page 2 of 4 10/25/2010 4:05 PM GB070010 Grading Sheet Comments General 1 B) Show site acreage and earthwork quantities on plans: 1.1 Cut _____ yds. (if applicable) 1.2 Fill ______ yds. (if applicable) 2 H) Show location of retaining walls on grading plan plus top of wall elevations, adjacent finished surface elevations, top of footing elevations, provide a cross section detail showing subdrain design, indicate drainage outlet for all retaining walls. Retaining walls are not a part of the grading permit. Submit for separate building permits; show connection of subdrain to storm drain. Note on plans. 3 N) Show all easements, (i.e. drainage, utilities, etc.). 4 Q) Approved erosion control measures are to be installed and functional during the rainy season from October 15 to April 15. Justify design with hydrology and hydraulic calculations. Submit three (3) copies of an erosion control plan and a cost summary of erosion control facilities. If proposed grading will take place after April 15, continue to show erosion control plans. Grading may extend into the next rainy season. 5 W) Additional comments may be made after field verification that the plans and soils report accurately reflects existing conditions. 6 Z) For sump pump please provide product brochure and website.. An electrical and plumbing permit must be obtained from the Building Permits Division. Drainage Instructions 7 W) Show retaining wall subdrain details with disposal points, flow line elevations and pipe material. 8 X) Show typical section of driveway and pavement section. Include type of surfacing material. 9 Y) Show typical section of hardscape. Include type of surfacing material. Slopes Geotechnical 10 A) Obtain approval of soils and geology report by County Geotechnical staff. Reports Page 3 of 4 10/25/2010 4:05 PM = Indicates line item not Cleared. GB070010 Grading Sheet Comments have been forwarded for their review. Page 4 of 4 10/25/2010 4:05 PM = Indicates line item not Cleared.