Loading...
HomeMy WebLinkAboutRS110386_Observation ReportMISNI MSPECIN)Nz91VKES INC. ClIl:1949)633E439 23615 RIgkrstiVee[ PnoneaPACl9491837-7934 Mhsian Vkp, G.92693 AMSTA ECTION PE"WE6 INC Observation Report mbMpe¢ 15 Avalon Vista Nexoon Coasl CN PomMIJmsw:RWll(s47&RWttoaB labM1me Avalon Vista II Project a gip¢ Design West Architecture alerWUssupawn:ASTMA615Gc6o ReiMStmi sr IN KNAEngmeering,lnc. omq. Nis Robert Getz fir: Nathu Development =amWeex coureb. SbmraM: KP Con mchon rypeatWekObrwk Reinforcing Steel Placement qa M-24-12 vented the placement M reinforcing steal at the following locations: the new fountlalion rooting secion births immerged new Retajmng Wall Indian along the east side ofthe proposed new Tennis Coun and the new foundation mWmg section for the proposed new SecpnN Entry Gate lec ited at the north end of the proposed new onveway to Garage of Parcel 1 Qotmeny Lot tz & 13t. 2. Verified reinbrcine steel fir size, grade, ap, lacaflan, and clearence. 3. WoM verified, unless noted Whenvjse above, Is in accordance with the givm plans & specifications, which are pending the County W Orange approval. s s Ti �1 Rc llttaz4r / _c c •rw=+aa• spc4&y w aprp RR6TN MSPECTIOM SEAVI[61H[. Cslk(90916336439 236aS A19ters54eef AMSTA pxona&EA1:(949)93).A39 Mission Vlejo.CA92691 CTIM denude: rxc Observation Report tebMnaslSAvalon Vista NewportCoael.OA e«rmxwapeg RWI10047 hblYmn Avalon Vista II Pro ad xJast Cei Weal Ambiersture makew Owprear: Simpson SET-XP Epory Engthem KNA Engineering, Inc. MpMrNnin Recall Gap central Natbu Oevelcpment mi x comedy. Ssti r tmmc KP Construction tSpeo/WrtObwG Elpry Ocwel lnstalleose qEe W-1912 i Observed the Installation of (20) -#5 horizontal dowels Ib 16 o c. with a min. 9" embed horizontally into the Lower Level concRia wan section for the new to stiffing structural ra-ma of" new foundation feeling reduce olthe prcposM new RHmning Wall alone the east ea coma proposed new Tennis court NParcel I Pormehy 2. Vented the size, depth. and cbanrinesa of boles prior to the application M Simpson SET-XP Epary. Lot p2070414G ezp. 03/3 V2014. 3. Work observed, unless noted otherwise above, is In accordance with the approved plans & sp rd(ca0ons. I(G1E11116 LItpI1R5 SNMLES _ Veyy�y� ®as�Wo�.u�s.w�nna 4 waaae raw r�us.a " O/C 91320 RC 5102J20 GC. appmat W 501s1y Ni IgrcY wdlsaSupK++�vMnx ARISU sStree MSrlMCES INc. Celh. (gI9)6334f439 23645AI9IeraCA.92 ARISTA mm�e&rNLl94n fl)g.M34 MfssianVMjq U.9Ib91 m CTIOx saRVMES INC. Observation Report AbAdM1ec 15 Avalon Vista Nexoprl Coast GA 0.mYtNunM SW110105 A4IYm Avalon Vista II Project Ashei Design West Architecture Mvnwpautpten: Concrete, Mix Design pRS500P43 Inglai KNA Engineering, Inc. darkness Name Rupert Getz O aasslan III Development B4 SaftnimbsiKP Cia,um on MCMWwkOtrervaS ReNbrced Concrete ps¢ 04 17-12 1. Observed the placement by line pump & consolidation by machvibrator of approx. 40 cuyds. of Robertson's Ready Mil conttHe, mk design NR550nP43 at the folbwjng locations : the newt undata n elabongrale antl cud sections of the proposed new Terrace Lounge areas located on the east & west ads of the new Infinity Swimming Pool & Spa located on the exterior eoMM1 aide of the new Main Residence, and the new foundation slab -on -grade S curb sections at the proposed new Lawn A" along the south formal between the Main Reaidence and the Rao. Center of Parcel i formerly Lot 12Is 13). 2. One ate of N x 8"= 4 test cylinders was taken from Load p3 (30 cu. I), ticket p8068216, truck %264, placed the new foundation slad-ongratle & curb section of the proposed new Terms Lounge located on the east side 0 the new Infinity Swimming Pol I Spa Slump lest result, 4-IS 3. Work obaccrIed, unless noted otherivides travel is in accordance with the approved plans&is in— M1atwns f I sit V ;eta aind IN Ni OL Y, 20 RC ,02; I.C.C. Ar�mw ad N' lakf 16 gxC Vra57A9MarmEna