HomeMy WebLinkAboutRS110386_Structural Observation Report♦N6TIt INWERN]N SF.NV1651NC.
CNL(949)633Ea39
23645NgNrsStreet
2WeiMyyaoAl
PM1one&pvUL1949)83]-]934
leas 2691
9AMSTA
�T
cTION eaRvlces nc.
Observation Report
lY M]ns 15Avalon Vista Nawootl Coast CA
Fal Prowl RW110047&RW110048
"aser a Avalon Vista II Proiact
&NtNm Design Wert Architecture
MwWllnmpldeSimPsan SET-XP Epoxy
ayee. KM Engineering, InC.
Iamyr New, Robert Getz
gmrxp; Nano Development
Hmpu A Orntlry.
6vewei KP Construction
1{1a4fWyxOgarwy E" Coffer Installation q¢ 04-20-W
1 Ohsenretl the installation of (12) -#5 horizontal domes ®16' o c. with a min. 9' emhed horizontally Into the
xlstlq concrete wall vevtian on Pre wmt side of IM1e Security Emry Gate br Me Onvewey to Garage of Parcel 1.
2. Observetl the Installation W (17) -At horizontal tlavels with a min. 8embed horizontally into IM1e exporg
wrocritewl & pile sermons on me east side of the Security Entry Gale brthe Driveway to Garage of Parcel 1.
3. Observed the Installation of (31) -AS bent dounls na 14" o c. with a min. 16" embedhorizontally into the will
coronets fooling sections for the proposed new Arbor sections along the norm side of the Orweway to the Motor
Could of Parcel 1 (formerly Lot 12 & 13).
4. Venfleb the size, depth, and cleanliness of holes poor to the application of Simpson SET-XP Epoi Lots
p063G106G exp. 0113112014, W5E494E exp. QW30fi #139E246E exp. 07I312013.
5 WOM tm+Y" N will fated Mnelw se ebov is in accordance wit the a ppmvalans8ti oi
��
II
_ si�a��rwf�r RK ftlIrR SM114FS
aa.:waweru4rwr�we
m
®e�a`na:vr r:n
reawe eaq
i/ OIC 01320
RC t0232 LC.C. Arrity
gMdab f6 £9NNY aWsa M