FM SppjNjmER NWA 13D SYSTEM
ROUGH INSPECT ION CHECKUST
YES
51_ser Construction and Location Angroval
a. Drain valve
b. Bawow device (single check)
c. Bell activation device
d. Inspector's test valve
a. Riser sized per approved plans
2. Pressure Test _
a. System tested at operating pressure for 2 hours ❑
b. Pressure gauge Installed
3. Sorinkler Heads shall not be Installed in the ftnas odor to the fiffin ss
being cemented k-place (temporary test dug;l
a. Installation and spacing of temporary test plugs ❑
4. RkbA
a. Material installed per plan El
b. Hangers per codes/prevent upward movement 0
c. All CPVC piping shall be installed by persons who have been ❑
certified by the manufacturer for installation of CPVC Piping
d. Piping protected from damage
S. A24
a. Wiring installed per code
b. Boxes Installed at proper locations El
NOTE, CPVC plastic pipe In the garage shall not be exposed. Sprinklers that are listed as 'Quick
Response" or "Residential' must be used.
CORRECTIONS AND NOTES:
FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPRO 1.
PERMIT* r1_0
BY: DATE—' 23
Fc3rrns;\Flrm sprinkler NFPA 180 System -Rough Inspection Checklist 05/12/2015
WT
CrrY OF NEWPORT BEACH.
0.-
COMMUNTrY DEWLOPWM DEPARTBEM
AunpiNGDWIMON
100 Civic Center Drive I P.O. box 17M Newport Beach, CA 92658-8915
www.newporftachca.gov 1 (949) 644-3200
FM SPRINTU". N"A 13D SYSTEM
FINAL CRECKUST
MES11DENTL4L)
YES
NO
1. Water meter proper size ❑El
2. Fire sprinkler system Installed per the approved plans
El
3. All construcHon covers removed -from sprinkler heads El
F1
4. Cover plates are NOT to be installed, but shall be available on the jobsite f-1
El
5. All tape and paint removed ffm sprinkler heads El
Ej
6. Finish trfm installed around sprinkler heads El
7. Proper signage posted at all required locations
8- Flow test conducted and bell tested El
El
9. Location of inspector's testing valve In approved location Ej
n
10. Clearances around sprinkler heads and riser - no obstructions El r-1
11. Operating pressure gauge installed at riser showing proper water pressure [] El
12. Back flow pFeventer installed F-1 D
13. System installed per manufacturers specifications El 11
NOTES:
FIRE SPRINKLER NFPA 13D SYSTEM FINAL APPROVED.