HomeMy WebLinkAboutRS110287_068t0000003ZZZ2AAO_Correction ListCounty of Orange
OC Public Works
OC Planning
Main Office
300 N. Flower Street
Santa Ana, CA 92702-4048
Zoning Plan Check Corrections
It is the responsibility of the applicant to satisfy the requirements (clearances) of each of the departments listed in this document.
Normally, each section will stamp your plans indicating their approval.
To view your plan check status and the latest correction list on the Internet, please visit: http://www.ocplanning.net and click on
'Plan Check Status' Link.
Please note that Planning and Development Services (PDS) Public Counter Hours are open Monday thru Friday
from 7:30 a.m. to 5:00 p.m. except holidays.
Project Number:RS110287 (Zoning)
Submittal Date:May 26, 2011
CBC Edition: 2007
Plan Check Date: 6/10/2011 11:56 AM
Description:New detach unenclosed
pool cabana (106
sqft.) 12´
max height.
Job Address
21 AVALON VISTA
NEWPORT COAST, CA
Owner Address
Parviz Safaei
7 Avalon Vista
Newport Beach CA92657
1st Recheck 4/13/11 Current - 2nd Recheck
Zoning Information For:RS110287
Job Address:21 Avalon Vista , Newport Coast
Parcel Number:15346 15 TR
Zoning: Newport Coast
PC/SP: NPTC/NPTR
Description:New detach unenclosed pool cabana (106 sqft.) 12' max height. Cabana will include bbq grill with cook top, outdoor sink and undercounter refrigerator. Electrical: 5 new lights, 1 ceiling fan
School District(s) Elementary or Unified:Newport-Mesa Unified
APN:473-163-10
CAA:47
CT:626.43
Architect of Record
David Hohmann
250 Baker St Ste 200
Costa Mesa CA92626
714-241-3600
Engineer of Record
ESI/FME Inc. Strutural Engineers
1800 E 16th St
Santa Ana CA92701
714-261-1811
Plan Checked By Contact Address
Raul Lao
250 Baker St Ste 200
Costa Mesa CA92626
714-241-3600
714-241-3601 FAX
Page 1 of 2
RS110287 (Zoning)
Zoning Plan Check Corrections
Sheet Comments By
Zoning Plan Check List
Pending R. Vuong1 Fees Required
Pending R. Vuong1.1 Please check with Norbert to see if this is applicable. Standard Correction
list item. Road Fees- IMPORTANT NOTE: Payment of road fees are to be paid
seperately from building fees.
Pending R. Vuong1.1.1 Payment of required road fees (fee receipt generated by Norbert Ponce
714-834-2017)
Pending R. Vuong2 HOA Approval
Pending R. Vuong2.1 Final plans must have Homeowner´s Association Approval.
Page 2 of 2 6/10/2011 11:56 AM = Indicates line item not Cleared.