HomeMy WebLinkAboutX2021-2737 - Inspection Final DocsClearwater Harbor Point Senior Living
Project Name: Clearwater Harbor Point Senior Living
Project Address: 101 Bayview Place Newport Beach, CA 92660
Permit Number: X2022-0254
Date of Building Permit: 5/31/22
Title 24 Compliance
1. This building has been inspected and tested and is compliant with all California Title 24 lighting
requirements.
2. The energy features and performance specifications, materials, components, and manufactured
devices for the building design or system design identified on the NRCC forms for this project
conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
3. The building design features or system design features identified on the NRCC forms for this
project are consistent with the information provided on other applicable compliance
documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application.
4. All required compliance documents have been completed and submitted (if applicable) to the
appropriate agency.
Required Certificates Attached
NRCI-LTI-01-E
NRCI-LTI-02-E
NRCI-LTS-01-E
NRCI-LTO-01-E
NRCI-LTO-02-E
NRCI-ELC-01-E
NRCA-LTI-02-A
NRCA-LTO-02-A
Exceptions Taken
Demand Response - < 10,000 sq ft of non-residential space
Daylighting – Less than 24’ of Window/Overhanging Soffits/Less Than 120 watts
ATT Technician/Responsible Persons Declaration Statement:
I certify the following under penalty of perjury, under the laws of the State of California that the above
information and the information in subsequent pages of this acceptance packet are true and correct.
X__________________
Stephan Landers
AT-Technician & Responsible Party
ATT License #:
TC-A814349 - CSLB 1089091
This is page 1 of 2
This is page 2 of 2
This is page 1 of 6
This is page 2 of 6
This is page 3 of 6
This is page 4 of 6
This is page 5 of 6
This is page 6 of 6
This is page 1 of 2
This is page 2 of 2
This is page 1 of 5
This is page 2 of 5
This is page 3 of 5
This is page 4 of 5
This is page 5 of 5
This is page 1 of 2
This is page 2 of 2
STATE OF CALIFORNIA
ELECTRICAL POWER DISTRIBUTION
CEC-NRCI-ELC-01-E (Created 01/20) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF INSTALLATION NRCI-ELC-01-E
Electrical Power Distribution (Page 1 of 5)
Project Name: Enforcement Agency: Permit Number:
Project Address: City: Zip Code:
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020
GENERAL INFORMATION
DATE OF BUILDING PERMIT:
PERMIT #
BUILDING TYPE Nonresidential
High-Rise Residential (Common Area)
Hotel/Motel (Common Area)
PHASE OF
CONSTRUCTION New Construction Addition Alteration
SCOPE OF RESPONSIBILITY
Enter the date of approval by enforcement agency of the Certificate of Compliance that provides the
specifications for the energy efficiency measures for the scope of responsibility for this Installation
Certificate.
Date:
In the table below identify all applicable construction documents that specify the requirements for the scope of responsibili ty
reported by this Installation Certificate (continued).
Document Title or Description Applicable Sheets or Pages, Tables, Schedules, etc. Date Approved By the
Enforcement Agency
STATE OF CALIFORNIA
ELECTRICAL POWER DISTRIBUTION
CEC-NRCI-ELC-01-E (Created 01/20) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF INSTALLATION NRCI-ELC-01-E
Electrical Power Distribution (Page 2 of 5)
Project Name: Enforcement Agency: Permit Number:
Project Address: City: Zip Code:
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020
A. Service Electrical Metering
Indicate by checking one of the three boxes below if the electrical power distribution system is in compliance with Section 130.5(a).
For newly installed electrical service in newly constructed buildings, Service Electrical Metering is required according to Section 130.5(a). Fill out
Column 1 thru 6 of table below.
For new or replacement electrical service equipment in existing buildings, Service Electrical Metering is required according to Section 141.0(b)2Pi.
Fill out Column 1 thru 6 of table below.
EXCEPTION to requirements of the Electrical Service Metering: Service or feeder for which the utility company provides a metering system that
indicates instantaneous kW demand and kWh for a utility-defined period. Fill out Column 1, 3, 6 and 7 of table below with the compliance
information.
EXCEPTION to requirements of the Electrical Service Metering: Electrical power distribution systems subject to California Electrical Code Article
517. Not required to fill out.
Fill out a separate line for each electrical service that is connected to the building. If additional table space is needed for electrical service information,
submit additional page with the information.
Electrical Service Schedule Electrical Service Rating Metering Capabilities
(check all that are present) Exception to 130.5(a)
01 02 03 04 05 06 07
Electrical Service Designation/Location/Description kVA In
s
t
a
n
t
a
n
e
o
u
s
(a
t
t
h
e
t
i
m
e
)
kW
Hi
s
t
o
r
i
c
a
l
p
e
a
k
(k
W
)
Tr
a
c
k
i
n
g
k
W
h
fo
r
a
u
s
e
r
-
de
f
i
n
a
b
l
e
pe
r
i
o
d
kW
h
p
e
r
r
a
t
e
pe
r
i
o
d
Ut
i
l
i
t
y
m
e
t
e
r
i
n
g
sy
s
t
e
m
STATE OF CALIFORNIA
ELECTRICAL POWER DISTRIBUTION
CEC-NRCI-ELC-01-E (Created 01/20) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF INSTALLATION NRCI-ELC-01-E
Electrical Power Distribution (Page 3 of 5)
Project Name: Enforcement Agency: Permit Number:
Project Address: City: Zip Code:
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020
B. Separation of Electrical Circuits for Electrical Energy Monitoring
Check all boxes below if the electrical power distribution system is in compliance with Section 130.5(b).
The electrical power distribution system meets the separation of electrical circuits for electrical energy monitoring requirement of Section
130.5(b). The electrical power distribution systems is designed so that measurement devices can monitor the electrical energy usage of load
types according to TABLE 130.5-B.
Describe the electrical power distribution system installed and the compliance method chosen in meeting the requirement of Se ction 130.5(b).
Use the space below to include the information. Examples of compliance methods are detailed in Nonresidential Compliance Manual
Chapter 8.
EXCEPTION to requirements of the Separation of Electrical Circuits for Electrical Energy Monitoring: Electrical power distribution systems
subject to California Electrical Code Article 517. Not required to fill out.
Fill out Column 1 thru 3 with the compliance information.
General Information Electrical Power Distribution System Information and Method of
Compliance Electrical Service Rating
01 02 03
Electrical Service
Designation/Location/Description
Describe the electrical power distribution system installed and the
compliance method used. kVA
Field Inspector Notes:
STATE OF CALIFORNIA
ELECTRICAL POWER DISTRIBUTION
CEC-NRCI-ELC-01-E (Created 01/20) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF INSTALLATION NRCI-ELC-01-E
Electrical Power Distribution (Page 4 of 5)
Project Name: Enforcement Agency: Permit Number:
Project Address: City: Zip Code:
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020
C. Voltage Drop
Check all boxes below if the electrical power distribution system is in compliance with Section 130.5(c).
The electrical power distribution system meets the voltage drop requirement of Section 130.5(c). The maximum combined voltage drop on
feeder conductors and branch circuit conductors to the farthest connected load or outlet does not exceed 5%.
Voltage drop calculation documents showing compliance to Section 130.5(c) are submitted as part of the compliance document submittal.
D. Circuit Controls for 120-Volt Receptacles and Controlled Receptacles
Check one or more boxes below for applicable requirements of Section 130.5(d) for the electrical power distribution system.
The control is capable of automatically shutting OFF the controlled receptacles when the space is typically unoccupied, either at the
receptacle or circuit level. For the automatic time switch control, it incorporates an override control that allows the controlled receptacle to
remain ON for no more than 2 hours when an override is initiated and an automatic holiday “shut-OFF” feature that turns OFF all loads for
at least 24 hours and then resumes the normally scheduled operation. Countdown timer switches are not to be used to comply with the
automatic time switch control requirements. The controls meet the requirement of Section 130.5(d)1.
There is at least one controlled receptacle within 6 feet from each uncontrolled receptacle. Where receptacles are installed in modular
furniture in open office area, at least one controlled receptacle is installed at each workstation. The receptacles meet the requirement of
Section 130.5(d)2.
There are installed split wired receptacles with at least one controlled and one uncontrolled receptacle. Where receptacles are installed in
modular furniture in open office area, at least one controlled receptacle is installed at each workstation. The receptacles meet the
requirement of Section 130.5(d)2.
Permanent and durable marking for controlled receptacles or circuits to differentiate them from uncontrolled receptacles or c ircuits is
provided. The markings meet the requirement of Section 130.5(d)3.
For hotel and motel guest rooms, there are controlled receptacles for at least one-half of the 120-volt receptacle in each guest room. Electric
circuits serving controlled receptacles in guestrooms are installed to have captive key controls, occupancy sensing controls, or automatic
controls so the power is switched off no longer than 30 minutes after the guest room has been vacated. The receptacles meet the
requirement of Section 130.5(d)4.
Receptacles that are only for the following purposes are excepted from Section 130.5(d):
-Receptacles specifically for refrigerators and water dispensers in kitchen areas.
-Receptacles located a minimum of six feet above the floor that are specifically for clocks.
-Receptacles for network copiers, fax machines, A/V and data equipment other than personal co mputers in copy rooms.
-Receptacles on circuits rated more than 20 amperes.
-Receptacles connected to an uninterruptible power supply (UPS) that are intended to be in continuous use, 24 hours per day/36 5 days per
year, and are marked to differentiate them from other uncontrolled receptacles or circuits.
STATE OF CALIFORNIA
ELECTRICAL POWER DISTRIBUTION
CEC-NRCI-ELC-01-E (Created 01/20) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF INSTALLATION NRCI-ELC-01-E
Electrical Power Distribution (Page 5 of 5)
Project Name: Enforcement Agency: Permit Number:
Project Address: City: Zip Code:
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance January 2020
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name: Documentation Author Signature:
Documentation Author Company Name: Date Signed:
Address: CEA/HERS Certification Identification (If applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Installation is true and correct.
2. I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system
design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this
Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized
representative of the responsible builder/installer.
3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on t his Certificate of
Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and
specifications approved by the enforcement agency.
4. I reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the
scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that apply to the
construction or installation have been met.
5. I will ensure that a completed signed copy of this Certificate of Installation shall be posted, or made available with the building permit(s)
issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed
copy of this Certificate of Installation is required to be included with the documentation the builder provides to the buildi ng owner at
occupancy.
Responsible Builder/Installer Name: Responsible Builder/Installer Signature:
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Position With Company (Title):
Address: CSLB License:
City/State/Zip: Phone: Date Signed:
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 1 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 2 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 3 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 4 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 5 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 6 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 7 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 8 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 9 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 10 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 11 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 12 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 13 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 14 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 15 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 16 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 17 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 18 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 19 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 20 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 21 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 22 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 23 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 24 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 25 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 26 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 27 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 28 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 29 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 30 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 31 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 32 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 33 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 34 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 35 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 36 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 37 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 38 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 39 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 40 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 41 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 42 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 43 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 44 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 45 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 46 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 47 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 48 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 49 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 50 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 51 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 52 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 53 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 54 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 55 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 56 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 57 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 58 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 59 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 60 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 61 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 62 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 63 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 64 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 65 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 66 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 67 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 68 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 69 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 70 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 71 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 72 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 73 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 74 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 75 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 76 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 77 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 78 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 79 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 80 of 80
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 1 of 4
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 2 of 4
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 3 of 4
CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance This is page 4 of 4