❑REQUEST PROVISIONS
TITLE
(FIRE CODE) LE
OF TITLE s (FIRE CODE) TITLE 18 (BUILDING CODE)
Plan Check# 1: 401 -11 #ofswdm I
H
OF THE NEWPORT BEACH MUNICIPAL CODE
Occupancy Cta Ion 3 U
�l
(See Reverse for Basis for Approval) (Fee $306)
Use of Building s R 8, #of Unite I
Project Status "Vol;
® REQUEST FOR ALTERNATE MATERIAL
Construction Type VA —Air
OR METHOD OF CONSTRUCTION
Verified by
(Sea Reverse for Basis for Approval) (Fee $308)
No. of Items I
Fee due Z D
For above requests, complete Sections 1, 2 8 3
DISTRIBUTION:
below by printing In Ink or typing.
❑ Owner ❑ Plan Check
Petitioner ❑ Inspector
❑ Fire ❑Other
Tj JOB ADDRESS:
PETITIONER --
SITE ADDRESS: 4827 Dorchester Rd.
Petitioner Christian Lieht
Owner Amanda Rubenstein & Megan Prichard
Address 4827 Dorchester Rd
Address 1401 Orain St. #120
Corona Del Mar, CA Zip 92652
Newport Beach. CA Zip 92660
Daytime Phone (310 ) 279-3684
Daytime Phone (949) 851-8345
Eman: brianCalcjBght.net
2 REQUEST: Submit plans If necessary to illustrate request Additional sheets or date may be attached.
weep screed 'onto allow flush finished surface elevation between interior and
cx6crior su s
USTIFICATION/FINOINGS OF EQUIVALENCY:
CODE SECTIONS: R703.7.2.1
Weep screed shall be placed 2" minimum above exterior finished
2019 CRC
surface w/ a corrosive restistant metal flashing behind which extends 6' minimum above and 6" minimum
Blow the weep screed ched dolail
r/ncipal
Petitioners
Signahrre Professional Uc. # 22334 Data: 01-31-24
FOR STAFF USE ONLY
DEPARTMENT ACTION: Inaccordencewith: /66BC 104A1/CFC 104.9 ❑ CBC 104.10/CFC 104.8
(Alternate materials & methods) (CSC Modification)
❑ Conwnenm from Fire Code Official is required. []Approved ❑ Disapproved ❑ Written Comments Attached
By: Data
,y.
t jRequest (DOE lessen arrf Oreprokcdon requirements.
_
Request(DOE (DOES lessen the structural integrity
The Request is: EfA3mrdBd ❑Dented (See reverse for appeal information)
❑ Granted (Ratification required)
Conditions of Approval:
i
Signatui --- — Posido GH1EF PIJII_CING OFFICID4elfe 2 �'7 `
Print Name —
APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse)
(Signature, statement of owner or applicant statement of reasons for appeal and filing fees are required.)
CASHIER RECEIPT NUMBER: - — SZ /T 3� ' 21- 0�-j Formaunoda OMI/23
Guidelines for Approval of Alternate Materials. Desiqn and Methods of Construction
Basis For Approval
For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification
or a request for alternate material or method of construction, he/she must determine that special, individual reasons
exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The
resulting condition must be in conformance with the spirit and purpose of the Code provisions involved and that such
modification does not lessen fire protection, structural integrity or occupant safety. The applicant must provide
sufficient information with this application to allow the above evaluation to be made.
Requirements for Submittals
The applicant design professional shall prepare a Written Report that describes the alternate proposal along with the
applicable data listed below:
• State specific code provisions for which alternative is requested and why request is being submitted.
• Describe by code section those provisions for which alternative is desired.
• Compare the proposed alternative versus the code requirements In terms of structural strength, suitability,
effectiveness, fire resistance, safety and health impacts affecting the building or user of the building,
• Demonstrate that the proposed alternative is compatible with balance of code requirements.
• When applicable, specify how authoritative consensus document(s) are used to substantiate proposal.
(Reference draft ICC Building Performance Code Commentary Section 1.4.2.3 for background information).
• Provide assumptions, references, and documentation of evaluation methods utilized. This includes intended
use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods.
• Specify when and where special inspection and testing are required and the standards of acceptance for
demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on the job site.
• Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate method
to ensure continued compliance.
• State how and where alternate proposal is incorporated within construction plans and prepare plan amendments
as necessary. The design professional has the responsibility to coordinate all construction documents and
ensure compatibility between documents.
• The report and design documents shall be dated, signed and stamped by the design professional according to
the plan submittal procedure.
• For alternate methods of design requests, the applicant shall set performance criteria for his design.
Performance criteria shall be reviewed, amended and approved by the Building or Fire Code Official prior to
start of design.
Alternative Design Review/Verification
The Chief Building Official or Fire Code Official has the responsibility to review design submittals for compliance to
the adopted codes and procedures. If the Building or Fire Code Official does not have the expertise on staff to
make a thorough and competent review, the Building or Fire Code Official shall select a consultant that possesses
the necessary qualifications to perform a third -party or peer review. Cost of peer review shall be paid by applicant to
the Building Division prior to commencing the review.
• Verify that all applicable information and justifications listed above as requirements for submittals is received and
verify that evaluation and design methods used by designer are appropriate to the alternative proposed.
• Verify products are being used in accordance with their listing conditions as required by recognized listing
agencies. If not avallable, require documentation and/or testing to demonstrate compliance with intent of code
and Intended use.
• Evaluate performance of material and possible flaws that could affect performance of material in its installed
state.
• The reviewer shall document that the submittal has been reviewed and accepted as meeting the alternative
materials, design and methods of construction provisions of the code. If the Building or Fire Code Official is not
satisfied that the applicant has met the conditions, the request should be denied in writing with the applicable
reason(s).
Inspection/Field Verification
The alternate proposal as approved in the construction documents must be verified by inspection, and, where
necessary, testing as follows:
• To verify that alternate materials, systems and fabricated products comply with accepted design criteria and the
manufacturers and engineer's installation procedures, inspectors should check product labeling, certification,
quality assurance processes, and testing, as applicable.
• When appropriate, an approved third party quality assurance inspection and tesfing service may be required for
continuous and complex inspection and testing activities. This is intended to verify that construction complies
with the code and the approved plans.
Appeal from the determination or action of the Chief Building Official or Fire Code Official or their designated agent
may be made to the Building and Fire Board of Appeals. To appeal, the applicant must provide special individual
reasons that make compliance with the strict letter of the Code impractical. Appeals or ratifications pertaining to
State Disabled Access Standards require complete evidence to substantiate that the proposed design is equivalent
to that prescribed by that standards or that due to legal or physical constraints, compliance with the standards or
providing equivalency would create an unreasonable hardship.
Appeals must be submitted on the Appeal Form available at Permit Counter accompanied by the properfee. You
will be noted in writing of the appeal hearing's time and date.
®m
TYPICAL EXTERIOR WALL
CLADDING
Y / 24" CONTINUOUS BITUTHENE - 18"
F '•: / ABOVE / 6" BELOW T.O. CONCRETE
12" CONTINUOUS 26 GA MIN.
CORROSIVE RESISTANT FLASHING -
6" ABOVE & BELOW+?--•
"'r O, LONcRE7Tj
CORROSIV ERESISTANT WEEP
SCREED
INTERIOR / EXTERIOR FINISHED
L�---4
SURFACE (TO MATCH @ DOORS)
L
(SLOPE EXTERIOR HARDSCAPE
Z 2% MIN. TO DRAIN)
N
�INz
EX-WEEP-0002(b)
WEEP @ HARDSCAPE
° y a
d
HARDSCAPE BASE SLAB
d e
MIRADRAIN (OR EQUAL)
DRAINAGE / EXPANSION BOARD
HOUSE FOUNDATION/SLAB
EARTH
ALL METAL FLASHINGS AND WEEP
SCREED SHALL BE OF SIMILAR
MATERIAL TO AVOID GALVANIC
CORROSION
3"=1,_0.1
> CL ®
Npm
'g
4■ [ D
o99
na -
w
m
�
n8
8
31
0�I
Z 0
C �
n
v
iD
Z �
0
n
n
n<
.'19l.w'JIW�^ ■ J
•1 .Rfal:YllYo�■a■tp .�wpr�r� nu.vla■
I.ls�kY`e'i � i9�.a�i
GYGIG lO mn.�
r,eoeo �
OR MA
L` ueww
DORCHEMR ROAD
DINING ROOM'
16'x10'
l pYEN�HG
LIVING ROOM'
16'xi V
0
Q
GARAGE
18'xi6'
WN00W SCHEDULE .
W
SIZE (WxH)
T1PE
COMMENT
1
W-0" x 4'-0-
SUDER
5
8'-0" x 6'-8-
STIDER
GLASS DOOR - IEMPEREO
DOOR SCHEDULE
LTR.
SIZE (WxH)
TYPE
COMMENT
A
3'-0" x e'-8"
SOUD-CORE
D
3'-O" x 8'-8"
20-MIN. RATED
I SELF-aDSING
`CEHING HIIG"I W-ti
"'IIr IGHf or DPr WNL T'-ti
FBUILDING CODE
I TRAINER
Can the two rooms shown above share Light & Ventilation from each other?
GIVEN:
Adjoining Wall Area: 16' x 8' = 128 sq.ft. Living Room Area: 16' x 1 V = 176 sq.ft.
Wall Opening Area, 12' x T = 84 sq.ft. Dining Room Area: 16' x 10' =160 sq.8
For both rooms to share Light & Ventilation, opening in wall must be:
Not less than half of the wall area: 128 sq.ft.12 = 64 sq.ft. < 84 sq.fL OK
Not less than 1110 of the floor area of the interior room: 176 sq.ft 110 = 17.6 sq.ft < 84 sq.ft OK
Not less than 25 sq.ft. in area: 25 sq.ft < 84 sq.ft. OK
Determine if the two rooms are provided with enough natural Light & Ventilation
Natural Light Calculation: 8% Required
Living Room: 176 sq_ ft. x 8 %=14.1 sq.ft required
Dining Room: 160 sq. ft. x 8 % =12.8 sq.ft. required
Total Light 14.1 + 12.8 = 26.9 sq.ft.
Window 1: 5' x 4' = 20.0 sq.fL
Window 5: 8' x 6'-8" = 53.3 sq.ft
Total Light &0 +53.3 = 73.3 sq.ft
73.3 sq.ft. provided > 26.9 sq.ft. required OK
Natural Ventilation Calculation: 4% Required
Living Room: 176 sq. ft. x 4 %= 7.0 sq.ft required
Dining Room: 160 sq. ft. x 4 %= 6.4 sq.ft. required
Total Vent.: TO + 6,4 =13.4 sq.it
Window 1: Slider Type 50%openable
20.0 sq.ft x 50% = 10.0 sq.ft provided
Window 5: Slider Type 50%openable
53.3 sq.ft x 50%= 26.7 sq.ft. provided
Door A: 3'-0" x 6'-8" = 20.0 sa.ft
Total Vent: 10.0 +26.7 +20.0 = 56.7 sq.ft.
56.7 sq.ft. provided > 13.4 sq.ft. required OK