Loading...
HomeMy WebLinkAboutZA2024-020 - APPROVING COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN EXISTING SINGLE UNIT RESIDENCE AND CONSTRUCT A NEW THREE-STORY SINGLE-UNIT RESIDENCE AND ATTACHED THREE-CAR GARAGE LOCA01-10-2023 RESOLUTION NO. ZA2024-020 A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN EXISTING SINGLE- UNIT RESIDENCE AND CONSTRUCT A NEW THREE-STORY SINGLE-UNIT RESIDENCE AND ATTACHED THREE-CAR GARAGE LOCATED AT 51 LINDA ISLE (PA2023-0195) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by David Bailey, concerning property located at 51 Linda Isle, requesting approval of a coastal development permit. 2. The lot at 51 Linda Isle is legally described as Lot 51 in Tract 4003. 3. The applicant requests a coastal development permit (CDP) to allow the demolition of an existing single-unit dwelling and construction of a new 4,724 square-foot two-story single- unit dwelling and an attached 678 square-foot three-car garage. The project includes raising the height of the existing bulkhead. The project also includes landscaping, hardscaping, and site walls. The project complies with all applicable development standards and no deviations are requested. 4. The subject property is designated Single Unit Residential Detached (RS-D) by the General Plan Land Use Element and is located within the Single-Unit Residential (R-1) Zoning District. 5. The subject property is located within the coastal zone. The Coastal Land Use Plan category is Single Unit Residential Detached (RSD-B) (6.0 – 9.9 DU/AC) and it is located within the Single-Unit Residential (R-1) Coastal Zoning District. 6. A public hearing was held on April 11, 2024, online via Zoom. A notice of the time, place, and purpose of the hearing was given by the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Division 6, Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures) because it has no potential to have a significant effect on the environment. 2. Class 3 exempts the demolition, construction, or conversion of up to three single-family residences in urbanized areas. The proposed project consists of the demolition of an Zoning Administrator Resolution No. ZA2024-020 Page 2 of 10 01-10-2023 existing single-unit dwelling and construction of a new 4,724 square-foot two-story single-unit dwelling and an attached 678 square-foot three-car garage. The project also includes raising the existing bulkhead. Therefore, the project qualifies within this exemption. There are no known exceptions listed in CEQA Guidelines Section 15300.2 that would invalidate the use of this exemption. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. 3. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. By Section 21.52.015(F) (Coastal Development Permits - Findings and Decision) of the Newport Beach Municipal Code, the following findings, and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 6,770 square feet and the proposed floor area is 5,402 square feet. b. The proposed development provides the minimum required setbacks, which are 10 feet along the front property line abutting Newport Bay, 4 feet along each side property line, and 25 feet along the front property line abutting the street. c. The highest guardrail is less than 24 feet from the established grade (9.67 feet NAVD88) and the highest ridge is no more than 29 feet from the established grade, which complies with the maximum height requirements. d. The project includes garage parking for a total of three vehicles, complying with the minimum three-car garage parking requirement for single-family residences with more than 4,000 square feet of habitable floor area. Zoning Administrator Resolution No. ZA2024-020 Page 3 of 10 01-10-2023 2. The neighborhood is predominantly developed with two-story, single-family residences. The proposed design, bulk, and scale of the development are consistent with the existing neighborhood pattern of development. 3. A Coastal Hazards Report and Sea Level Rise Analysis was prepared by Geo Soils, Inc. dated September 25, 2023, for the project. The maximum bay water elevation is 7.7 feet NAVD 88 (North American Vertical Datum of 1988 (NAVD 88)) and may exceed the current top of bulkhead elevation of 9 feet (NAVD 88) during high tide or storm events. The report analyzes future sea level rise scenarios assuming a 3.2-foot increase in the maximum water level over the next 75 years (i.e., the life of the structure). Therefore, the sea level is estimated to reach approximately 10.9 feet NAVD 88 (the likely range for sea level rise over the 75- year design life of the structure based on low-risk aversion estimates for sea level rise provided by the State of California, Sea Level Rise Guidance: 2018 Update). 4. On March 23, 2021, the City Council approved updated Waterfront Project Design Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities. The guidelines require that any structure permitted within the years 2021 through 2025 must have a minimum bulkhead elevation of 10.9 feet (NAVD 88) with a design for adaptability elevation of 14.4 feet (NAVD 88). The project has been conditioned to raise the bulkhead to an elevation of 10.9 feet (NAVD 88). Geo soils, Inc. has confirmed the bulkhead can be raised up to 14.4 feet NAVD88 if needed and in compliance with the updated guidelines. 5. Once the existing seawall/bulkhead is raised per the report’s recommendations, flooding, wave run-up, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. Flood shields (sandbags and other barriers) can be deployed across the openings to protect and prevent flooding to the structure. The report concludes that the proposed project will be safe from flooding hazards for the next 75 years with the raised bulkhead. Therefore, the project has been conditioned to raise/cap the bulkhead structure up to 10.9 feet (NAVD 88). 6. The finished floor elevation of the proposed single-family residence is 10.6 feet (NAVD 88), which complies with the minimum 9.00-foot (NAVD 88) elevation standard. The Coastal Hazard Report concludes that the bay water elevation (currently 7.7 feet NAVD 88) will not exceed the proposed bulkhead at the single-family residence at 10.9 feet (NAVD 88) for the anticipated 75-year life of the structure. 7. Under NBMC Section 21.30.030(C)(3)(i)(iv) (Natural Landform and Shoreline Protection – Development Standards), the property owner will be required to agree with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). This requirement is included as a condition of approval that will need to be satisfied before the final building permit inspection, respectively. 8. The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, Zoning Administrator Resolution No. ZA2024-020 Page 4 of 10 01-10-2023 consistent with NBMC Section 21.30.015(D)(3)(c) (General Site Planning and Development Standards – Waterfront Development). This requirement is included as a condition of approval that will need to be satisfied before the issuance of building permits, respectively. 9. The property is in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved before the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC before building permit issuance. 10. The property is located adjacent to coastal waters. A Construction Erosion Control Plan was provided to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived from construction chemicals and materials. The project design also addresses water quality through the inclusion of a post-construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event runoff on-site. Any water not retained on-site is directed to the City’s storm drain system. 11. Under Municipal Code Section 21.35.050 (Water Quality and Hydrology Plan), due to the proximity of the development to the shoreline and the development containing more than 75% of impervious surface area, a Water Quality and Hydrology Plan (WQHP) is required. A preliminary WQHP has been prepared for the project by Toal Engineering Inc. dated, July 13, 2023. The WQHP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, the use of a LID approach to retain the design storm runoff volume on-site, and documentation of the expected effectiveness of the proposed BMPs. 12. Proposed landscaping complies with Implementation Plan Section 21.30.075. A condition of approval is included that requires drought-tolerant species. Before the issuance of building permits, the final landscape plans will be reviewed to verify invasive species are not planted. 13. The project site is not located adjacent to a coastal view road, public access way, or Coastal Viewpoint as identified in the Coastal Land Use Plan. The closest designated Public Viewpoint is located approximately 1,100 feet to the east of the property near the intersection of Bayside Drive and Harbor Island Drive. Additionally, the proposed residence is located to the south of Coast Highway and to the west of Bayside Drive, which are both Coastal View Roads as designated in the Coastal Land Use Plan. Due to the distance of the proposed development from the Public Viewpoint and Coastal View Roads as well as the intervening development between, the project will not be visible from the aforementioned locations and will not result in impacts to coastal views. 14. As a bayfront property, the north elevation of the new development will be visible from the water. The design complies with all required setbacks which minimizes the appearance of building bulk, and the design uses architectural treatments which will Zoning Administrator Resolution No. ZA2024-020 Page 5 of 10 01-10-2023 enhance views from the water. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts on public views. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Fact in Support of Finding: 1. The project site is located between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project replaces an existing single-family residence located on a standard R-1 lot with a new single-family residence. Therefore, the project does not involve a change in land use, density, or intensity that will result in increased demand for public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. 2. Lido Isle is a private, 107-lot, single-unit residential community created in the 1960’s and the existing home on-site was developed in 1973. The community predates the California Coastal Act and does not provide public access to the bay or shore. A gated bridge connects the island to the mainland at Bayside Drive. While Bayside Drive is the first public road paralleling the sea and the project site is located between Bayside Drive and the Harbor, the project will not affect the public’s ability to gain access to use and/or view the coast and nearby recreational facilities. 3. Access to Linda Isle is provided via the Aloha Drive bridge that connects the island to Bayside Drive and is not accessible to the public. The island has a recreational tennis court, clubhouse, and sandy beach area in the northwestern portion of the island on Linda Isle for residents of the community. Although not a public access way, the project does not include any features that would obstruct access along this route. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby finds this project is categorically exempt from the California Environmental Quality Act under Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3 because it has no potential to have a significant effect on the environment. Zoning Administrator Resolution No. ZA2024-020 Page 6 of 10 01-10-2023 2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit (PA2023-0195) subject to the conditions outlined in Exhibit “A,” which is attached hereto and incorporated by reference. 3. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director by the provisions of Title 21 Local Coastal Program (LCP) Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 11TH DAY OF APRIL, 2024. Zoning Administrator Resolution No. ZA2024-020 Page 7 of 10 01-10-2023 EXHIBIT “A” CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans, and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Before the final building permits, the existing seawall shall be reinforced and capped to 10.90 feet (NAVD 88) and capable to be raised up to 14.4 feet (NAVD 88), in compliance with the City of Newport Beach Waterfront Project Guidelines and Standards, Harbor Design Criteria Commercial & Residential Facilities. 3. The existing seawall shall be reinforced in compliance with the recommendations provided in the Coastal Hazards Report and Sea Level Rise Analysis prepared by GeoSoils, Inc. dated September 25, 2023. 4. Before the final building permit inspection, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 5. Before the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs, and expenses (including without limitation, attorney’s fees, disbursements, and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of the development. This letter shall be scanned into the plan set before building permit issuance. 6. Before the issuance of building permits, the applicant shall submit a final construction erosion control plan. The plan shall be subject to review and approval by the Building Division. 7. Before the issuance of building permits, the applicant shall submit a final drainage and grading plan. The plan shall be subject to review and approval by the Building Division. 8. Before issuance of a building permit, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans. Zoning Administrator Resolution No. ZA2024-020 Page 8 of 10 01-10-2023 9. Before the issuance of a building permit, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought-tolerant plantings, non-invasive plant species, and water-efficient irrigation design. The plans shall be approved by the Planning Division. 10. Before issuance of building permits, the final WQHP/WQMP shall be reviewed and approved by the Building Division. The implementation shall comply with the approved CPPP and WQHP/WQMP and any changes could require separate review and approval by the Building Division. 11. This approval does not authorize any new or existing improvements (including landscaping) on California Coastal Permit Jurisdiction, State tidelands, public beaches, or the public right-of-way. Any improvements located on tidelands, submerged lands, and/or lands that may be subject to the public trust shall require a coastal development permit (CDP) approved by the California Coastal Commission (Coastal Commission). Before the issuance of building permits, the applicant shall provide a copy of said coastal development permit or CDP waiver or documentation from the Coastal Commission that subject improvements are not subject to the permit requirements of the Coastal Act and/or not located within the permit jurisdiction of the Coastal Commission. 12. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter the sensitive habitat, receiving waters, or storm drains or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. No demolition or construction materials shall be stored on public property. 13. This Coastal Development Permit does not authorize any development seaward of the private property. 14. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of native birds under MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. Zoning Administrator Resolution No. ZA2024-020 Page 9 of 10 01-10-2023 15. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented before and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 16. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 17. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 18. Trash and debris shall be disposed of in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed of in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 19. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 20. The project is subject to all applicable City ordinances, policies, and standards unless specifically waived or modified by the conditions of approval. 21. The applicant shall comply with all federal, state, and local laws. A material violation of any of those laws in connection with the use may be caused by the revocation of this Coastal Development Permit. 22. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained are detrimental to the public health, and welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained to constitute a public nuisance. 23. All landscape materials and irrigation systems shall be maintained by the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 24. Construction activities shall comply with Section 10.28.040 (Construction Activity – Noise Regulations) of the Newport Beach Municipal Code, which restricts hours of noise-generating construction activities that produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday. Noise-generating construction activities are not allowed on Saturdays, Sundays, or Holidays. Zoning Administrator Resolution No. ZA2024-020 Page 10 of 10 01-10-2023 25. Before the issuance of the building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 26. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 27. This Coastal Development Permit shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 28. To the fullest extent permitted by law, the applicant shall indemnify, defend and hold harmless the City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs, and expenses (including without limitation, attorney’s fees, disbursements, and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of Shahbazi Residence CDP including but not limited to, Coastal Development Permit (PA2023-0195). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorney’s fees, and other expenses incurred in connection with such claim, action, causes of action, suit, or proceeding whether incurred by the applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all the City's costs, attorneys' fees, and damages, which the City incurs in enforcing the indemnification provisions outlined in this condition. The applicant shall pay to the City upon demand any amount owed to the City under the indemnification requirements prescribed in this condition.