Loading...
HomeMy WebLinkAbout08 - Newport Beach Mariners Library, Corona del Mar Lifeguard Substation, and Ben Carlson Lifeguard Headquarters Heating, Ventilation, and Air Conditioning Replacement Project — NOC for Contract No. 8760-1 (22F02)Q �EwPpRT CITY OF s NEWPORT BEACH `q44:09 City Council Staff Report April 23, 2024 Agenda Item No. 8 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Tom Sandefur, Assistant City Engineer - 949-644-3321, tandefur@newportbeachca.gov TITLE: Newport Beach Mariners Library, Corona del Mar Lifeguard Substation, and Ben Carlson Lifeguard Headquarters Heating, Ventilation, and Air Conditioning Replacement Project — Notice of Completion for Contract No. 8760-1 (22F02) ABSTRACT: On January 24, 2023, the City Council awarded Contract No. 8760-1 for the Newport Beach Mariners Library, Corona del Mar Lifeguard Substation, and the Ben Carlson Lifeguard Headquarters Heating, Ventilation, and Air Conditioning (HVAC) Replacement Project to Western Allied Corporation of Santa Fe Springs. The total contract award was $427,497 plus a $43,000 allowance for contingencies. The required work is complete and staff requests the City Council accept the completed work and close out of the contract. RECOMMENDATIONS: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of Civil Code; and c) Release Faithful Performance Bond one year after acceptance by the City Council. DISCUSSION: Overall Contract Cost/Time Summary Awarded Contract Final Total Contract Total Contract Percent Contract Amount Amount Change Amount Cost Change $427,497.00 $468,429.21 $40,932.21 9.6% Allowed Contract Time + Approved 81 Actual Time Used (Days) 81 Extensions (Days) _ 8-1 Newport Beach Mariners Library, Corona del Mar Lifeguard Substation, and Ben Carlson Lifeguard Headquarters Heating, Ventilation, and Air Conditioning Replacement Project — Notice of Completion for Contract No. 8760-1 April 23, 2024 Page 2 The Mariners Library, Corona del Mar Lifeguard Substation, and the Ben Carlson Lifeguard Headquarters HVAC Replacement Project included replacing the existing evaporative condenser and all four pumps, and upgrading the building automation system at Mariners Branch Library; installing an outdoor heat pump unit, installing three fan coil systems, replacing and relocating the kitchen exhaust fan at the Corona del Mar Lifeguard Substation; and installing two heating and cooling units at the Ben Carlson Lifeguard Headquarters at Newport Pier. Contract No. 8760-1, for the subject project, has now been completed to the satisfaction of the Public Works Department. A summary of the contract construction costs are as follows: Original bid amount: $427,497.00 Actual Cost of Bid Items Constructed: $427,497.00 Total Change Orders: $ 40,932.21 Final contract cost: $468,429.21 There were five change orders totaling $40,932.21. This amounted to 9.6% of the original contract amount and was within the contingency allowance. The change orders covered the unforeseen deteriorated condition of HVAC parts, replacement of aged piping insulation, and modification to the existing roof reinforcement to accommodate the proposed condensing unit and exhaust fan at the Corona del Mar Lifeguard Substation and at the Mariners Library. The bulk of the change order, in the amount of $27,805.21, was for the replacement of another existing HVAC unit, not included in the original scope of work, at the Ben Carlson Lifeguard Headquarters after it failed during the construction period. A summary of the project schedule milestones is as follows: Estimated Completion Date Per Baseline Schedule November 15, 2023 Actual Start of Construction Per Notice to Proceed April 3, 2023 Contract Completion Date With Approved Extensions December 1, 2023 Actual Substantial Construction Completion Date April 4, 2024 The HVAC industry continues to experience a prolonged procurement period due to the State of California mandated transition to more energy efficient systems. The contract completion date was adjusted to provide sufficient time to procure the correct parts and material for each location. FISCAL (IMPACT: Funds for the construction contract were expensed from the Facilities Maintenance Master Plan Program (FMMP) in the following accounts: Account Description Account Number Amount FMMP 57101-980000-22F02 $ 468,429.21 The FMMP is funded through the General Fund. 8-2 Newport Beach Mariners Library, Corona del Mar Lifeguard Substation, and Ben Carlson Lifeguard Headquarters Heating, Ventilation, and Air Conditioning Replacement Project — Notice of Completion for Contract No. 8760-1 April 23, 2024 Page 3 ENVIRONMENTAL REVIEW: On January 24, 2023, the City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Class 1 Section 15301(d) (maintenance of existing public facilities and mechanical equipment involving no expansion of existing use) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Maps 8-3 ATTACHMENT A LIMITS OF WORK MARINERS LIBRARY G DRIVE MP��N�RS CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT LOCATION MAP C-8760-1' 22F02 4/23/24 ATTACHMENT A co RoTq F� �< M Fgcyq,Q PACIFIC OCEAN LIMITS OF WORK CORONA DEL MAR LIFEGUARD HQ N\1 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT LOCATION MAP G8760-1 22 F02 4/23/24 ■ ATTACHMENT A 107 4QO� PACIFIC OCEAN LIMITS OF WORK NEWPORT BEACH LIFEGUARD HQ 0 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT LOCATION MAP G8760-1 22 F 02 4/23/24 ■