Loading...
HomeMy WebLinkAboutX2020-1982 - Misc (3)LANDSCAPE IRRIGATION AUDIT REPORT PROIECTNAME: Blackburn Residence 1814 Port Charles PI., CA Landscape Design: Ryan Burress Po Box 7326 Newport Bch. CA 714.975.1434 CERTIFIED LANDSCAPE IRRIGATION AUDITOR (CLIA) BIG PICTURE LANDSCAPE Michael McMillen / 714.394.6126 / Bigpicturelandscapea_gmail .com Certified Irrigation Auditor #014256 All of the hydrozones on the irrigation systems were evaluated with a visual inspection. As per your request, we evaluated the irrigation systems in accordance with the California Model Water Efficient Landscape Ordinance (MWELO). SUMMARY This audit was conducted to inspect the overall site irrigation systems within the limits of construction. The irrigation systems are new systems utilizing POTABLE water. IRRIGATION PLANS: Each hydrozone identified on the plans were executed in the field, (Total valve city. 6). Each system layout, components and functionality have met all the requirements of the Irrigation Plans. MWELO: The California Model Water Efficient Landscape Ordinance has been adopted by the City as the standard for new construction and irrigation installations based on AB1881. UNIFORMITY: The overhead spray lawn areas were operational with the controller, low efficiency nozzles were installed. Since the dripline is subterranean and the planting material is already installed and would be damaged if the dripline were unearthed, a drip catch can test was not performed. In lieu of the catch can test, the standard 90%efficiencyfor pressure compensating drip & low -flow irrigation per the Irrigation Association's Landscape Irrigation Auditor, 3rd edition book was used for the report. Shrub ZONES / STATION Al-A6 • Irrigated Area: Zones separated based on Full sun South/ West side of project. • Plant Material: Shrubs - Low water • Plant Condition: Traditional • Microclimate: Full Sun • Soil Category: Silty Clay Loam • Root Depth: Approximately4-10" • Slope: Overall site 1% • Compaction: yes • Runoff: No runoff observed • Standing Water: None observed • Hydrozone Separation: Yes • Mulch in Beds: Yes • Pressure Regulation: Not required / Isolation valve installed per plan • Controller: Hunter PHC-12 / WR-CLIK controller and hard wired weather sensor / rain shutoff • Valves: RB ASVF Installed on S,E side rear corner / Front W side of house. • Emitter Type: RB XFS 6-12 (.6 gph @ 12" o.c. row spacing @ 12"-18" o.c.) RB 1401 / RWS • Max Flow: 8.4 GPM • Distribution Uniformity: .90 /.77 • Precipitation Rate: 0.6 / 1.58 Punch list Items: 04/17/2023 (Compliance based on minor corrects during the maintenance period) Zone Audit Conclusion: PASS, project IS within compliance to begin maintenance. The irrigation systems were evaluated and based on the Irrigation Association Audit rules/guidelines and MWELO requirements. Respectfully, Michael McMillen Certified Irrigation Auditor #014256 '.,• U- Big Picture Landscapes •l'•• AW Irrigation Inspection Affidavit Project Name: Blackburn Residence 1814 Port Charles Place Newport Beach, CA Irrigation Plan Designer: Ryan Burress PO BOX 7326 Newport Beach 714.975.1434 Field Inspector : Michael McMillen BPL Irrigation Auditor 714.394.6126 This project was inspected within the limits of customary access for compliance with the approved irrigation plans on file in City Planning. At least two (2) inspections were conducted. The findings are as follows. Date Inspection: 0313112023 A. Inspections during construction to check mainline in open trench: Yes No 1. Location of mainline conforms to as -built plan X 2. Size of main line conforms to plan X 3. Depth of mainline conforms to plan X 4. Main line conditions is undamaged X _ 5. Main line pressure tested with water and meter to check for visible leaks X _ 6. Specific observations attached if needed X _ Date Inspection: 0411412023 B. Inspections after completion of system installation prior to sodding: Yes No 1. Irrigation POC has isolation valve X 2. System components (i.e., controller, backflow, rain sensor, etc.) X 3. Drip line GPH and spacing as specified X _ 4. System activated for observation of compliance X _ 5. Each station complies installed per plan X 6. Matched precipitation rates provided by zone X _ 7. As -built plan provided to owner X 8. Specific observations attached as needed X Summary of irrigation review: THE IRRIGATION SYSTEM IS IN COMPLIANCE. IRRIGATION SYSTEM TO BE INSPECTED WEEKLY BY THE MAINTENANCE CONTRACTOR DURING THE 90 DAYMIAINTENACE PERIOD. THE OWNER/DEVELOPER WILL DETERMINE WHEN THE MAINTENACE PERIOD WILL BEGIN. I hereby certify that I am qualified to submit this irrigation inspection affidavit based on the qualification indicated below: Certified Landscape Irrigation Auditor Certified by The Irrigation Association. Respectfully, � b,, Michael McMillen : C�N Certified Irrigation Auditor #014256 Big Picture Landscapes •'��r oo "oss�`o, Appendix E LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that: (1) 1 am a professional appropriately licensed in the State of California to provide professional landscape design services. (2) The landscape project for the property located at Blackburn Residence -18 14 Pori Charles PI. Newport Beach CA (provide street address or parcel number(s)) was installed by me or under my supervision. (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Newport Beach Water Efficient Landscape Ordinance (Municipal Code Section 14.17) and the City of Newport Beach Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for the efficient use of water in the landscape. (4) The following elements are attached hereto a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule; c. Irrigation audit report; and d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. X Yes No b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler & Emitter Standard. Yes No (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the City of Newport Beach Design Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance. W Michael McMillen 04/17/2023 Print Name Date CLIA 014256 Signature License Number Bia Picture Landscape 3063 W. Lvnrose Dr. Anaheim CA 92804 UTO154 = 714.394.6126 bravido@aol.corn Telephone E-mail Address Landscape Design Professional's Stamp (If Appropriate) 14 cuA. r 34 LANDSCAPE and IRRIGATION MAINTENANCE SCHEDULE PROJECT NAME: Blackburn Residence TENANT IMPROVEMENT: 1814 Port Charles PI. Newport Beach, CA LANDSCAPE and IRRIGATION MAINTENANCE SCHEDULES: RECO DURING PRIME GROWING SEASON AND PEAK USER DEMAND (MAINTENANCE TASKS TO BE PERFORMED ON A WEEKLY BASIS I_1 TASKS: • RECORD THE IRRIGATION USEAGE EVERY WEDNESDAY, AND THEN COMPARE ACTUAL USAGE VS. FLOW SENSOR RECORDED FLOW RATES. • CHECK THE CONTROLLER DAILY FLOW SUMMARIES TO SEE ANY DRIP VALVE WITH RECORDED FLOWS LOWER THAN LISTED ON THE CONTROLLER PROGRAM. • CHECK THE CONTROLLER ALERTS FOR ANY HIGH FLOW ALERTS, IRRIGATION ISSUES, ETC. • CHECK ENTIRE IRRIGATION SYSTEM TO FIND AND REPAIR DAMAGE OR BROKEN DRIP EMITTER(S) WITH SAME TYPE AND MANUFACTURER. • REVIEW THE CONTROLLER RECORDS TO VERIFY EACH DRIP VALVE IS GETTING THE PRPPER WATER ALLOCATION BASED UPON THE PROGRAMMING, AND IF NOT THEN ADJUST THE IRRIGATION PROGRAMMING TO FIX THE UNDER OR OVER WATER ISSUES. • CHECK THE IRRIGATION SCHEDULE HAS BEEN ADJUSTED PER EACH STATION ON EVERY CONTROLLER BASED UPON THE BASE IRRIGATION SCHEDULES INCLUDED. ADJUST SCHEDULES AS REQUIRED FOR ANY CLIMATE CHANGES, RE -SODDING, WINTER OVERSEEDING, FERTILIZER SCHEDULE, PRUNING SCHEDULE, OR ANY OTHER EVENT THAT MIGHT CAUSE THE PLANT MATERIAL ADDITIONAL IRRIGATION • SIPHON / INSPECT TREE SIPHON TUBES FOR WATER. MINIMUM RECOMMENDED MONTHLY MAINTENANCE SCHEDULE (MAINTENANCE TASKS TO BE PERFORMED ON A MONTHLY BASIS, IN ADDITION TO WEEKLY MAINTENANCE TASKS.) TASKS: • CHECK AND ADJUST ALL DRIP EQUIPMENT (DRIP REMOTE CONTROL VALVES, AND MASTER VALVE PRESSURE REGULATOR). • INSPECT EACH IRRIGATION STATION VIA THE CONTROLLER MANUAL OPERATION FOR MINIMUM 3 MINUTES FOR EACH STATION ON EVERY CONTROLLER TO CHECK FOR PROPER COVERAGE, AND NO SIGNS OF ANY IRRIGATION PROBLEMS. IF PROBLEMS ARE DISCOVERED, THEN REPAIR ANY DAMAGED OR CLOGGED EMITTERS. CHECK THE PRESSURE ON THE LAST SPRAY HEAD OR DRIP EMITTER ON EACH STATION TO MAKE SURE IT MAKES THE DESIGN PRESSURES LISTED ON THE IRRIGATION LEGEND. • REVIEW ALL THE WEEKLY TASKS HAVE BEEN COMPLETED EACH WEEK.