Loading...
HomeMy WebLinkAboutX2021-2631 - MiscAppendix E LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that: (1) 1 am a professional appropriately licensed in the State of California to provide professional landscape design services. (2) The landscape project for the property located at 1323 Ashford Ln Newport Beach, CA (provide address or parcel number(s)) was installed by me or under my supervision. street (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Newport Beach Water Efficient Landscape Ordinance (Municipal Code Section 14.17) and the City of Newport Beach Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for the efficient use of water in the landscape. (4) The following elements are attached hereto: a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule; c. Irrigation audit report; and d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. ✓ Yes No b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler & Emitter Standard. ✓ Yes No (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the City of Newport Beach Design Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance. 33 Gonzalo Sobrero Print Name Signature 3305 Laguna Canyon Rd, Laguna Beach, CA 92651 Address 949-306-1055 Telephone Landscape Design Professional's Stamp (If Appropriate) N/A 2-26-24 Date C-1018952 License Number Gonzalo@ssiandscapedesigns.com E-mail Address 34 Exhibit B — Prescriptive Compliance Option Checklist/Submittal Requirements Applicability: New or rehabilitated projects landscape projects (including new single-family, multifamily, public, institutional or commercial projects) with an aggregate landscape area equal to or greater than five hundred (500) square feet but less than 2,500 square feet. Graywater or rainwater on -site capture with less than 2,500 sq. ft. of landscape area Preparation by a Licensed Professional is not required for the Prescriptive Compliance Option. Refer to the Landscape Design Standards (Appendix H) for comprehensive information about submittal requirements and copies of the appendices referenced below. Prescriptive Compliance Submittal Requirements: Sheet # (All submittal items must be inserted into the plan set): Project information: Date, project name, project address andior lot number(s), total landscape area (square feet), project type, water supply type, contact information for the project applicant and property owner Written notes/confirmation that: Turf area does not exceed 25% of landscape planting area (prohibited on slope areas and parkways less than 10 feet wide) 75% of landscape area must be plated with climate adapted plants with an average WUCOLS plant factor of 0.3. Compost at a rate of four cubic yards per 1,000 square feet to a L2 depth of six inches 3-inch mulch mulch layer applied to all planting areas (excluding turf areas) Automatic irrigation controllers will use evapotranspiration or soil moisture sensor data and will have manual shut-off valves 3. Written statement: "I agree to comply with the requirements of the prescriptive _L? _ compliance option to the MWELO." Certification of Completion Package (Prior to final): Landscape Installation Certificate of Completion (Appendix E) Irrigation audit report (Appendix G) or enrollment in a regional or local water suppliers water conservation program Post installation irrigation schedule and landscape/irrigation maintenance schedule Re, 08-2s2016 F- F— m 1 1 $ TI 9 9p`e<' a3 rz 'Pni e g3 , H Ina lit lit if Rill r 4 i blp� I. 4 I. r £NO r. 9}� lilt � � �pf°� j({t! � ! { ik�9t�pi't�I{ o Q gg � ,.v( �i ;P: � i i i •+!!t ie St � n 33! S _ ° a< EB a o�DF m9 '�o'�>o` 4 1 °oom�' m "��gm��-a fa its ° Sao �F m6114 m g o>==$o - Joao 3:"Fz `Sa'P HaV MAW s r_7. or>y,smE m a V'y°oa 5 MA oP^ 8^ p ^a£ ^e¢ vY e H 1 $$ a �s�o a ea• a �oga'YB�o ;j? 1 r' -; 1��{`ilil i i ill 2 it ego Ill In ,l..i, 1{3q9�Jul �!?a91 IIplRI'� !'!�I°?I°f ' f.,o....,- 1 � !1 if if �!�???!��l!�t+til�l';� I i!!,f.;,? g t ' gl II? 4 ?