HomeMy WebLinkAboutXR2022-3315 - MiscCITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newaortbeachca.Dov 1 (949) 644-3200
Structural Observation Report
Ad
Project n , `
Report Date: " ^ ZZ
CNB Inspector Name:
CN Pe'rmiit^#:
Building Owner Name:
Owners Mailing Address (if different from site);
Owner's Telephone #:
CNB Plan Check #:
Full Name of Structural Observer ):
SO -maid ui�z (9 av
.ern
1' (q lephone— 7,17 #. �1 � �
SG t Reg. #:
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED check applicable boxes
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
❑
Conventional
Footings & Slab
❑ Concrete
❑ Steel
❑ Concrete
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
❑
Caissons, Piles,
Grade Beams
Wood or Manuf.
hear Panels
❑ Masonry
>i<Woocl
-t7rl CAL —
t
1
❑
Other:
❑ Other:
❑ Other:
❑ Other:
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑
OBSERVED DEFICIENCIES AND COMMENTS:
❑ REPORT CONTINUED ON ATTACHED PAGES.
FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. 1, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division.
SIGNATURE QJFVSTRUCTURAL 011SURVER OF RECORD DATE
No. C51994
STAMP OF STRUCTURAL OBSERVER
nRSFRVATInN nnFS NOT WANF ANY RFOI IIRFNFNTR FOR RI III nINO INRR9PT1nN RV AI ITRnRRFn Cum nvCCC nC TUC Pn-v nC mrvmnRT RCAPY
Fo,msVSvucNrelObsrna[iouRepon&Inmucriaos
> >S
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1758 1 Newport Beach, CA 92658-8915
www.newportbeachca.gov 1 (949) 644-3200
BUILDING HEIGHT CERTIFICATION
Project Street Address: 1400 Mariners Drive, Newport Beach
Building Permit Number(s): 0 )� R aQ a�� — J 3 1S
As the surveyor of record for the project at the above address, I hereby certify that I have reviewed the
City of Newport Beach approved plan and original topographic survey and based the elevations listed
below on those plans.
Elevations shall include an allowance for roofing material thickness if not yet installed. Provide
each critical ridge and flat roof, or roof deck railing elevations indicated on the approved plans.
Use the format below on the back of this form if additional space is necessary or further
explanation is needed. Provide original copy to the inspector before roof framing inspection.
All elevation points are based on: O NAVD88
O NGVD29 O Assumed
Please provide the following elevation information
for the highest roof ridges, flat roofs, or
parapets/guardrails. Additional elevation points may be requested by the Building Inspector.
RIDGES (3:12 slope or greater)
QApproved elevation point of ridge is 117.03
and actual elevation point is 111.48
Approved elevation point of ridge is
and actual elevation point is
Approved elevation point of ridge is
and actual elevation point is
Approved elevation point of ridge is
and actual elevation point is
Approved elevation point of ridge is
and actual elevation point is
Approved elevation point of ridge is
and actual elevation point is
Approved elevation point of ridge is
and actual elevation point is
FLAT ROOFS, PARAPETS AND GUARDRAILS
Approved elevation point of flat roof or parapet is and actual elevation point is
Approved elevation point of flat roof or parapet is and actual elevation point is
Approved elevation point of flat roof or parapet is and actual elevation point is
Approved elevation point of flat roof or parapet is and actual elevation point is
Approved elevation point of flat roof or parapet is and actual elevation point is
I certify that the above height measurements are correct and the above project:
OIS in compliance with the City -approved plans.
OIS NOT'n`piance with the City -approved plans (Provide explanation).
Please describ 1ck 'm,#he City -approved plans on the back of this form.
T,
No. B 11/6/2023
JN: 23097 Sur u yo or Civil Engine is*'signature and seal Date
(dt amp and gighature required)
* License number of 3396- or lower
Fo=\Huilding Height Certification 11 /02116
PRWE8DL-- LINE_
6'-0,
6'-0' REWIRED REAR S MAC
W
y2
VI
N
W
6
hI
A
of
10
(E) R0
POPE -A: 11
NOM
ALL BUILDING S MAWS ARE MEASURED +0
FACE OF WALL nNIW
PROPERLY LINE
MARINERS
10'-0" REWRED FR
DRIVE
�" LA;,
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.gov 1 (949) 644-3200
Structural Observation Report
Project Address: A ��
lOwwnner
Report Date: r�
CNB Inspector Name:
CNB Permit#:
Building Name:
Owners Mailing Address (if different from site);
Owners Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
30L4e�
SO -mail Address:
AVCt CO t.a+.
SO Telephone M
1�{-Z77-q� Q5
SO License / Reg. #:
c Iqq
ft�z
V I
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes)
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
❑ Conventional
Footings & Slab
❑ Concrete
❑ Steel
❑ Concrete
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
❑ Caissons, Piles,
Grade Beams
Wood or Manuf.
I Shear Panels
❑ Masonry
❑ Other:
❑ Other:
❑ Other:
❑ Other:
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
❑ REPORT CONTINUED ON ATTACHED PAGES.
6 FINAL STRUCTURAL OBSERVATION REPORT:
e structure generally complies with the approved construction documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division.
SIGNATURE CIFI STRUCTURAL OBSERVER OF RECORD DATE
NO- C51994
STAMP OF STRUCTURAL OBSERVER
nRCFRVATION nnFA NOT WANE ANV VPnI11oFNFNTQ cno Rilli nlNn INQGerTInN GV AIITNnDOFn rum nvccQ ne Tue mry nc hics OnoT oeeru
170 m SMu [ObsrnatioaR pon&lm"l iom
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.Qov 1 (949) 644-3200
Structural Observation Report
Project Q,d06ss: � S ��
AI/'IC_ V / ✓
Report Date: �7 �
!CG_
CNBlnspector Name:
=�P�; it#:a3�
i'
Building Owner Name:
Owner's Mailing Address (if different from site);
Owners Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SY E-mail Address:
SO Telephone #:
SO License / Reg. #:
iI
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes)
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
Conventional
ootin s & Slab
❑ Concrete
❑ Steel
❑ Concrete
-rfT
i C AfL-
27
2
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
❑
Caissons, Piles,
Grade Beams
❑ Wood or Manuf.
Shear Panels
❑ Masonry
❑ Wood
Other'
❑ Other:
❑ Other:
❑ Other:
T V1)
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑
OBSERVED DEFICIENCIES AND COMMENTS:
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction
documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division.
No' C51994
STAMP OF STRUCTURAL OBSERVER
DOES NOT WANE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
Fame n ftra[ObsmaonnRe ft&losnuctiow
DEPUTY 1 INSPECTION
1-800-DEPUTYI
Gen Contr:
Sub-Contr: a
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658
www.newportbeachca.goy 1 (949) 644-3200
SPECIAL INSPECTION REPORT
Project Address: � &�
Permit Number.
Inspection Type (s): V—t---
Inspection Date (s):91
( % ) Periodic (
Describe Inspection, In Judi g Location(s): 01
its _
L J • O %^ SS 5 cic J' WIMP C•LLI
List Tests M e:
2Z l�j�0 6C7� 5
�--
Total Inspection Time Each Day:
Dater._.. 1_.___
Hours: I I
List All Items Requiring Correction finclude Previously Listed Uncorrected Items):
Comments:
To the b of my knowledge, tnq work " cte syn accordance with the Building Division approved design drawings,
speci cations and applicable wor m,w9hip provisions of ON U.B.C. except as noted above.
'tl-c-(2-a,
SpeciallnspectionReport 8-24-15
PROJECT STATUS REPORT CaICERTS, Inc
Effective 05/14/2024 11:41 (Page 1 of 2)
� kI� L kt7iN1krfA11*U
Energy Standards Code Year:
2019
❑ ❑
Project Name:
SMITH RESIDENCE
Project Type:
Alterations SFR
Address:
1400 MARINERS DRIVE
■
City/State/Zip:
Newport Beach / CA / 92660
•
Enforcement Agency:
City of Newport Beach
Easy to Verify @ calcerts.com ■
Permit Number:
XR2022-3315 / 10-18-2023
OVERALLSTATUS
COMPLETE
HERS VERIFIABLE MEASURES:
COMPLETE
CF1R INFORMATION - Certificate of Compliance (Document Lists Required Energy Features) V/
Certificate Type
Compliance
Registered Form
CF1R-PRF-01
Registered Date
2022-12-01 08:42:19
Registration
Number
222-P010231777A-000-000-0000000-0000
CF2R INFORMATION - Certificate of Installation (Documents the proper installation of required energy features) !/
System
Form
Registered Date
Registration Number
222-P010231777A-001-001-E01001A-0000
CF2R-ENV-01-E
2024-01-04 08:12:34
Tom Pulice
Fenestration Installation
(KRS DEVELOPMENT INC)
222-P010231777A-001-001-E03001A-0000
CF2R-ENV-03-E
2024-01-04 08:13:49
Tom Pulice
Insulation Installation
(KRS DEVELOPMENT INC)
222-P010231777A-001-001-E04001A-0000
CF2R-ENV-04-E
2024-01-04 08:14:15
Tom Pulice
Roofing -Radiant Barrier
(KRS DEVELOPMENT INC)
222-P010231777A-001-001-E21001A-0000
CF2R-ENV-21-H
2024-01-04 08,14,26
Tom Pulice
QII-Framing Stage
(KRS DEVELOPMENT INC)
222-P010231777A-001-001-E22001A-0000
CF2R-ENV-22-H
CF2RSENV-n
2024-01-04 08:14:45
Tom Pulice
Installation
CIII-I(KRS
DEVELOPMENT INC)
HERS Provider: CaICERTS Inc.
CA Building Energy Efficiency Standards 2019 Residential Compliance Dec 2019
6WZ oag aouelldwon IBRuaplsaa 6LOZ spepuelS 6ouapL43 Maui Bulpling Vo
'ouJ SiNBC)Ie0 Japinmd SH3H
(EMMA33014 grit) X3i!)
(,Coeolly3 ued)
(SLL900ZOO) 6UBG J000H xail
OO:L£: L L bL-SO-bZOZ
awoH : L walsLS
VZZW-VL00ZZW-L00-L00-VLLLL£Z0L0d-ZZZ
H ZZ HOW iiEdO
(ONVOU3330H 3r10 X3iJ)
(Mollj!V)
(SL1900ZOO) 6UeG J9490H xair
6b:9E: L L V1-SO-bZOZ
awoH : L walsLS
VEZW-VLOOEZW-L00-L00-VLLLLEZ0L0d-ZZZ
H-EZ-HOW-i1EdO
(E)NV0213d30H 3rlt) XMI)
(a6e�ea-j lon(i)
(9LL90OZOO) 6ue0v9100H xaa
L7:9$:L1 Vi-SO-17ZOZ
awoH :L walsLS
VOZW-VL000ZW-L00-L00-VLLLLEZ0L0d-ZZZ
H-OZ-HOW-NEdO
(E)NVON3g30113rlt) XMI)
(uo!lellelsul uo6e!nsul-IIt))
(9LL900ZOO) 6ue0la}aoH xay
61:9L 90 40-L0-bZ0Z
L wals�(S
VZZ9-VL00ZZ3-100-100-VLLLL£Z0L0d-ZZZ
H ZZ AN3 N£dO
(ONVON3g3014 3rlt) X3il)
WelS BUlweUd-110)
(SL190OZOO) BUBO JalaoH xaa
LL:9L:go 70-L0-17Z0Z
L walsLS
VLZ3-VL00LZ3-100-L00-VLLLL£Z0L0d-ZZZ
H LZ AN3 iJE3O
jegwnN uogSUISPO'd
eleO welsl6eN
uuod
weISRS
(sainseaW S213H to U0lle3Uu9A ayl sluawnooO) uogeoguaA;o aleaU!uaO - NOI.LVWZIOZINI NUO
luojejjlp si snlelS walsLS lon0 - L0-HOW-NZd0 :onleA llnelaO uoN
-luejag p sI snlelS walsLS OS - L0-HOW-2IZdO :anleA linalaO uoN
(ONI 1N3WdO'13A30 SH01)
Aoeoil;3 Ued
ao!lnd wol
Sb:b£:LL bL-90-bZOZ
awoH :L wals�(S
0000-VL00ZZW-L00-L00-VLLLL£Z0LOd-ZZZ
H-ZZ-HOW-NZdO
(ON] 1N3WdO-13A30 S)V)
ao!Ind wol
L£:VE:LL K-SO-bZOZ
MOUJ!V
awoH :L wa16RS
0000-VL00EZW-L00-L00-VLLLL£Z0L0d-ZZZ
H-EZ-HOW-NZd0
(ONI 1N3WdO-13A3(l Si1>1)
a6eleal pnO
aognd wol
99:£E: L L K-90-4Z0Z
H OZ HOW 23ZdO
awoH : L LUWAS
0000-VLOOOZIN-L00-L00-VLLLLEZOLOd-ZZZ
(ONI 1N3Wd0-13A3(l SiJ>I)
sued pue slonO 'swelsAS
aognd wol
EZ:M lR K-9017Z0Z
6u!uo!l!puoO aoedS
0000-VL00L0W-L00-L00-VLLLLEZ0L0d-ZZZ
3-L0-HOW-1:1Zd0
(Zlo Z 96ed) Lb:LL bZOZ/bL/SO 9n1.10all3
OUI 'SiN3OIBO LH0d3N SMV1S .MrOldd