Loading...
HomeMy WebLinkAboutF2012-0358 - Misc� CITY OF NEWPORT BEACH° , •1C."11 JIB' COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 3300 Newport Boulevard I P.O. Box 17681 Newport Beach, CA 92658 www.newportbeachca.gov 1 (949) 644-3275 RESIDENTIAL FIRE SPRINKLER NFPA 13D SYSTEM FINAL CHECKLIST FAIL PASS 1. Fire sprinkler system installed per the approved plans ❑ 2. Proper sprinkler head spacing ❑ I 3. All construction covers removed from sprinkler heads ❑ e, 4. All tape and paint removed from sprinkler heads ❑ 5. Finish trim installed around sprinkler heads 11 6. Proper type of sprinkler heads installed at each location. ❑ 7. Proper signage posted at all required locations ❑ 8. Alarms tested���.}'p�� 9. Location of inspector's testing valve in approved location SYSTEMS 10. Clearances around sprinkler heads and riser - no obstructions ❑ C 11. Fire alarm (bell) installed at proper locations ❑ [� 12. Proper clearance around sprinkler heads at acoustical panels ❑ L 13. Operating pressure gauge installed and pressure verified 14. Back flow preventer installed ❑ I' 15. System installed per manufacturers specifications ❑ NOTES: — -- FIRE SPRINKLER FINAL APPROVED: / PERMIT#:y35 BY: DATE: _ �`Z6 -13 --- Forms\ Fire Sprinkler NFPA 13D System -FINAL Checklist RESIDENTIAL S-12 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 3300 Newport Boulevard I P.O. Box 1768 1 Newport Beach, CA 92658 www.newportbeachca.gov 1 (949) 644-3275 FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION CHECKLIST FAIL PASS 1. Riser Construction and Location Approval a. Drain valve ❑ b. Backflow device (single check) ❑ c. Alarm activation device ❑ d. Inspector's test valve ❑ C" 2. Pressure Test hours U a. System tested at operating pressure for 2 b. Pressure gauge installed ❑ r' 3. Sprinkler Heads (Installed per plans) a. Correct head type installed ❑ b. Installation and spacing of sprinkler heads ❑ lzr� c. Field changes to approved plans ❑ d. Field changes require review and new calculations ❑ 4. Pi in a. Material installed per plan ❑ [4-- b. Hangers per codes/prevent upward movement ❑ ra'� c. All CPVC piping shall be installed by persons who have been ❑ certified by the manufacturer for installation of CPVC piping d. Piping protected from damage ❑ e. Water meter proper size ���� C I..� 5. Alarms a. Wiring installed per code ❑ b. Boxes installed at proper locations ❑ NOTE: CPVC plastic pipe in the garage shall not be exposed unless it is installed above a smooth, flat, horizontal ceiling. Sprinklers that are listed as "Quick Response" or "Residential" must be used. CORRECTIONS AND NOTES: FIRE SPRINK GH INSPECTION APPROVED: _ PERMIT #: rZn2 '"D 3S By. DATE: ���7 2 Forms\Fire Sprinkler NFPA 12D System - Rough Inspection Checklist 5-12