Loading...
HomeMy WebLinkAboutX2012-0977 - Misc (3)(z� CITY OF NEWPORT BEACH2- COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 3300 Newport Boulevard I P.O. Box 1768 1 Newport Beach, CA 92658 www.newaortbeachca.aov I (949) 644-3200 Structural Observation Report Project Address: 690 NEWPORT LEIII-MR, pIZ. Report date: 9-13 1-Z CNB Inspector Name: CNB Permit* Building Owner Name: Owner's Mailing address (if different from site); Owner's Telephone #: CNB Plan Check #: 077 -2o1.2 F(ru�ll Name of Structural Observer (SO): RC)Cr6p, 4E SO email Address: 1696 oN arIAN,SUrrc2 6 SO Telephone M ��R_4T]+_0.5o.2, SO License / Reg. #: S486.. PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check anolicable boxes! FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete QrSteel ❑ Concrete TWvs5 c01999PMON oM GR)17 13 WN - g4 -13 IA ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels ❑ Masonry ❑ Wood ❑ Other: ❑ Other: ❑ Other: ❑ Other: ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. 1, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptanc of t str ural systems by the C' - of Newport Beach, Building Divi 'on. 0/ /2 STRUCTURAL OBSERVATION DOES Tim STAMP OF STRUCTURAL OBSERVER REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Forms\SnvomralOhservatlonReporc&G,etmcfions CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 3300 Newport Boulevard I PA. Box 1768 1 Newport Beach, CA 92658 www.newportbeach.c,a.gov 1 (949) 644-3200 Structural Observation Report Project Address: Report date: CNS Inspector Name: Permit#:: 1%tt v� �'-� » r �CNS 77 ia. Building Owner Name: Owner's Mailing address (if different from site): Owners Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): Rocti z 4a 80 email Address: R�.s�L Fwc6. $0 Telephone #: SO License / Reg. #: co -cam PLEASE INDICATE STRUCTURAL FLFMFNTfi ANn cnurNr &T.InAre nooMmlicn . FOUNDATIONS SHEAR WALL$ --- FRAMES — ..-.e��wrv.-.��ry DIAPHRAGMS (Floor/Roo vNNVNN NYNV,O INDICATE LOCATION($) OBSERVED VVAG.Ir DATE OBSERVED ❑ Conventional Footin s & Slab 11 Concrete ❑ Steel fd Concrete SHAFT WALL W14 ry ❑ Mat Foundation, Prestressed Concrete EI Masonry ❑ Concrete ❑ Steel Deck QLIV B-V6 AND ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. $hear Panels ❑ Masonry ❑ Wood b G t JAI "LI t-M OF CIS ❑ Other: ® Other: Lr- A • 6/pF7.10 CJ Other. ❑ Other: N(ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: ® REPORT CONTINUED ON ATTACHED PAGES. IN FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the appooved construction documents, and all observed deficiencies were corrected. I dedare that the following statements are true to the best of my knowledge: t. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure Is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to e . final acceptance of the structural systems by thf Newport Beach, Building Division. 1-5-1 STRUCTURAL OBSERVATION DOES NOT IMAIVE ANY REO111187 ArNm grin nun mar wcocrT"I av e„Tunmren �..o.... 11: nc Tuc rim. n� romu�S4uEltaalobserverwneponAGulrtkiWfi 01gT1 6CIa Nej�ar (:�e�e� :2 FYFE_ or I 1,111" ryfo FIBRWRAP'Sysfems August 14, 2012 Brian Armor Contech Services 2540-A Orange Ave Santa Ana, CA 92707 Tel: (714) 557-6425 Re: 14050- Island Hotel- Plan Check Responses to the City of Newport Beach Dated July 20, 2012 Mr. Armor, This letter is to address the required surface preparation when strengthening columns for confinement. This letter is to address the plan check comments provided by the city of Newport Beach for the Island Hotel project, rev 1. 1 have re -stated the city�s comments below and have provided a line item response to each of their requirements. Refer to responses below. 1. Obtain plan review approval from the following: a. Engineer of Records Submission has been reviewed by the Structural Engineer of Record (SEOR) and stamped with review stamp. 2. Final drawings which will be approved for permit issuance shall be signed by the respective design professionals. Submission to the city has been stamped by the Component Engineer of Record (CEOR) and reviewed by the Structural Engineer of Record (SEOR). 3. Please provide plans with archive -able quality, min 24 x 36 sheets Submitted plans to the city will be in a larger sheet size as required. 4. Please review the calculations to include strength level forces derived from service loads based on ASCE 7 load combinations. Calculations developed by the SEOR, which include the strength level forces, are attached. 5. Note: the application of FYFE pursuant to report ESR 2103 is limited to gravity loads. Please revisit section 4.1.6.1 of the ESR report. Please provide alternate approach for reinforcing concrete beam. Section 4.1.6.1 indicates that the composite systems can be applied to beams to enhance their ductility and their flexural and shear strengths. This section does not specify any limits to gravity applications only for beams. The second part of this section, however, indicates that the strengthening for slabs will be limited to gravity loads only. 6. Please provide copies of FYFE co. quality control documentations as per section 5.2 See attached quality control manual. 7. Provide and inspection program per section 4.3 of the report. Refer to AC 178 for inspection procedures and attached Quality control Manual. 8. Provide installation procedures to include sequence and instructions for installation. Fyfe Co. LLC 8380 Miralani Drive, San Diego, CA 92126 Office: 858.642,0694 Fax 858.444.2982 EnnaiL info@fyfeco.com www.fyfeco.com Shop drawings have been revised to include more detail on the sequence and instructions for installation of the fiber. 9. Provide on plans the concrete strength of existing beam based on existing documents. must be greater than 2500 psi at 28 days). Calculations developed by the SEOR, which include concrete compressive strength, are attached. 10, The nominal shear strength of the member shall be in compliance with section 11.3 of the Guide for Design and Construction of Externally Bonded FRP systems as published by American Concrete Institute. Calculations developed by the SEOR, which include the nominal shear strength of the member, are attached. 11. The Limits of reinforcement shall be in compliance with sectioin11.4.3 of the documents noted above. The limits set forth in ACI 440.2R-08 are not applicable to this retrofit. They do not account for the higher shear strength capacity provided by the concrete, since the beam to be strengthened is a post -tension beam. Also, based on the analysis provided by the SEOR, see attached, the nominal shear capacity of the existing beam is adequate without any FRP. The FRP is to be added as form of added conservatism to the overall beam's capacity only. If you have any questions or require additional clarification please feel free to contact me. Sincerely, Victor Reyes, P.E. Regional Manager