HomeMy WebLinkAboutR_5626_S•··-----,---_"'"!--.
' -l --
DIETERICH POST REORDER NO. 1"iS013
CITY OF i\lEWPORT BEACH
UTILITIES DEPT,
JEFF STANEART R,C.E, 38799
DEPUTY UTILITIES DIRECTOR
DEREK J. McGREGOR, lNC.
l'ROFFSS!tlNAL CIVH. ENti1NE:.ERS Ji. ~U-.NMal(S
4t,;O IJW!NI!: BLVD., surn; 201! " JRVl!'l'i, CA n;zo
iEU~80N!:'. \114) ~lC:-H5~
DATE
DATE
·~.t..:·~~ ---+'"'.' • ---,--~
'
BASICS OF BEARINGS
THE CENTERLINE OF 29TH STREET BEING NORTH
890 56' 12" EJ\ST AS SHOWN ON A PARCEL MAP
RECORDED IN BOOK 92 PAGE 40 OP PARCEL MAP
BOOKS RECORDS OF ORANGE COUNTY, CALIFORNIA.
BENCH MARI(
J'l"T NEWPORT BEACH, 0.5 HIL.8 SOtJ'l'H ALO°rIG NEWPOR'I' BOULEVARD (ONE ,WAY
NOR.'!'H) FROM THE ?P,CIFIC COAST HICHWAY UNDSRPASS, AT THE "T"
JUNCTION OF 29TH STREET, 7. 4 FEET NORTH OF A POINT IN LINE 1'ITE TEE
NO~.'rH CURB OF 29TH STREE'I, 6 FSET SOUTHEAST O!? A. 20.:.!!iCK P.P.LM T~EE,
·J, S FEE'I' )IQRTHE.~S'r OF THE NORTHEAST CURE OF ~EWPORT BOULEVARD, 20
FSF.'T· f.OUTHEAST OF POWER ?OLE 908870E·, 0. 7 FEET WEST OF AN ?l.NGLE IN
• '!'HE CONCRETE SIDE.'WALK, ABOUT LEVEL WITH THE SIDIWALK, A!W SET 1N
THE TOP or A CONCRETE POS'!' PROJECT INC: 0 .1 FEET ABOVE THF: CR.Ot!Ni'."!,
ELEVATION 4. 985 A.DJ, 1976
l.
3.
5.
6 -
7.
8.
GENERAL 'NOTES
THE GENERAL CONSTRUC~ION OF F.LL PUBLIC IMPF.DVEHENTS SHALL
CONFORM TO THE REQGIREME!'iTS OF THE NEWPORT BEACH CONSTRUCTION
STANDARDS AND THE' STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTIO.N, 1988 EDITION II.ND SUPPLE...1'1ENTS.
STATIONING REFERS TO CENTERLINE OF STREE'.l'.
EXISTING UNDERGROUND !JTIL17IES ARE SHOWN AS PEF,: AVAILABLE
RECORDS. THE CONTRA8TOR SHl1L:. BE RESPONSIBLE FOR VERIFYING THE
F.i,C?:JAL LOCATION Ji.ND ELEVATION 1N THE FIELD PRIOR '!'O BE:GINNING
CONSTRJCTICN' O!' THE NEW FACILITIES.
CTJRB DATA REFERS TO FACE OF CURB.
l',LL CONCRETE SURFACES SE ALL CONFOR.'1 rn GRF-.DE' COLOR AND F rnI ss:
TO ALL ADJOINit/G CURBS AND WAL:{i:.1.
hLL UNDERGROUND WOR!{ SHM .. L BE COMPLETED PRIOR TO .?JWH!G OF
STREET AND DRIVEWAYS,
THE CONTRAC'I'OR SH..?.LL REOUEST INSPECTION FROH THE PUBLIC ';,;'ORKS
DEPARTt-iENT 48 HOURS 1N ADVANCE: OF ?REFOR.'HNG ANY WORK AT 544-
3311. 'rHE PUBLIC WORKS DEPAR'l'MENT IUSPEC'I'OR SHALL ·ALSO BE
NO'r!FIED AFTER PLACEMENT OF FOR::-1S AND PRIOR TO ?!.ACEHENT CF
ANY CONCRETE FOR CURB & GUTTER SO THAT TBE FORMS CAN BE
CHECKED FOR LINE AND GRADE AND COMPARAB!LITY WITH EXISTING
CONSTRUCTION.
ALL CONCRE'.rE SHALL BE 560~C-3250,
CONCRETE: GUTTER
DRAJNAGE
1\ I ~--------------
i 'L ----1 -------LJ
VICINITY MAP
(NT:5)
TYPICAL SECTION
N-TS.
CONSTRUCTION NOTES
SAWCUT 2' BEYOND EXIST
PAVEMENT
REMOVE EXIST DRIVEWAY
REMOVE EXIST SIDEWALK
CURB FACE P.ND REMOVE
•
EXIST
REMOVE EXISTING PAVEMENT SAWCUT TO NEAREST JOINT
CONSTRUCT 8" TYPE "A" P.C.C. CURB & GUTTER ?ER C.N.B.
STD.-182-L & TYPICAL SECTION HEREON.
CONSTRUCT SIDEWALK PER C.N.B, STD.-180-L
CURB &
CONSTRUCT CURB ACCESS RAMP PER C.N.B.
REQUIRED)
STD.-181-L-A (CASE AS
REMOVE EXISTING PARKING METER POST.
INSTALL PARKING METER ?OST PER CITY STD. 912-C.
INSTALL MODIFH:D TYPE II LIGHTING STANDARD WITH 150 WATT HIGH
~;~i~0:;. s1~1i:118~~~~Niii~R A7~s ~H;f;;~E:~~,R~I~E~~L~~; .. p~~~T
CENTERS), REFER TO C.N .B. ___ STDc -?Ol··L, STD -2G4-L & STD -205-L. • • -
INSTALL 1 1/ 4" SCH. 40 PVC
C.N.B. STANDARDS. WIRING; 2
GROUND WIRE.
ELECTRICAL CONDUIT AND WIRE PER
EACH # 8' S AND ONE BARE, j 8 COPPER
INSTALL CONCRETE PULL BOX WITH GROUND ROD AND FUSE HOLDER PER
C.N.B. STD. -205-L.
PROTECT
PLACE.
..J. r; fl)
i ,EEV/5£1? .5TRE!:T LIGHT f'OLE "~
EXIS'I'ING 5000 VOL'f SERIES STREET LIGHT CIRCUIT IN
CITY OF NEWPORT BEACH
THiS PLAN IS SIGNED BY THE CITY OF NEWPORT BEACH FOR CONCEPT
AND ADHERENCE TO CITY STANDARDS AND REQUIREMENTS ONLY.
THE CITY IS NOT RESPONSIBLE FOR DESIGN ASSUMPTIONS AND
ACCURACY.
STREET IMPROVEMENTS
NEWPORT Bl VD
29th ST. TO 135'±NORTH OF
29th ST.
DATE BY DESCRl?TION
REVISIONS
APP'D. DESiGNED D,G.
CHECKED
C). t"-1.
DRAWN p. t.. -
DAT£ 3/23/90
CITY Of NE\'JPORT BEACH
PUBLIC WORKS DEPARTMENT SHEET 1 OF 1
/ .
'
\ \ I
! I