Loading...
HomeMy WebLinkAboutR_5356_SM0LJ/F/e'O -· l 1n1 D.ETER!CH-POST 2101B .003 TOP OP cue.e SCORE L/lle.B OllLY- ' • , , I ! ,, 4,-B, TYP/CALSECT/0/4/ ~-SECTI0/4/ S'T,4. c;e~84.00 ---------------------N.7."s. REVISIONS ----------------------. ----~------ 2 3 4 GENE RAl NOTES The City's Standard Specifications are "Standard Specifications for Public Works Construction, 1973 1\ All work detailed on these Plans shall be constructed in accordance with the City's Standard Special P_rovi si ans and Specifications except as modified herein. All materi_als and workmanship for electrjcal and signal work shall conform to Section 86 of the California Standard Specifications, 1973 Edition, and applicable State Std. Drawings. -· -~ . - The locations of existing substructures shown hereon have been taken from available records and their .correctness and completeness are in no way guaranteed. It shall be the contractor's responsibility to accurately locate all ·substructures, whether shown hereon or not, and to P\□tect them from damage. 5 ·:statfoning-is-along easterly-property line of Jamboree-Road:-' ••?•-· ----------~. -•-•• ------· ------------·-·--------~-~-----------·· --------~---·-··-··--· 6 7 Curb data refers to face of curb. Portland cement concrete shall be Class 564-C-3000. CONSTRUCT!Oll NOTES , E"STlMATEV QLJANrtT/£5 4l'1T. UNI 80G l.f I 01- Construct 4" thick Portland Cement Concrete sidewalk per typical section andc.N.B. Std-110-L. 2',/90!1.f Existing traffic signal detector loops to be replaced in kind by developer. New traffic signal detector loop to be installed and connected to traffic signal controller at STA 66 + 44.B<o by develope.c.._('PULC-WIRE' IN f=Xl5T. CONOUIT) Verify that new traffic signal l 1/2" interconnect conduit is installed by others prior to sidewalk construction. CHECKED O.M .. I DATE , .5'B"T 74 PUBLIC\WORKS DEPARTMENT \ • SHEET / J. /.SS9? 2 EA. I EA. I EA. I EA. I EA LLJM?:5LIH OF 1 • I ◄ . I . ) I I I ' ( J • ; i